EE552D1
EE51FA1
1ST SEMESTER
S.Y. 2014-2015
COMPILATION
OF
ELECTRICAL WIRING SYSTEM DESIGN
SUBMITTED BY:
Date Submitted
LETTER OF TRANSMITTAL
Dear Sir,
In Partial Fulfillment of the requirements in EE552D1 (Electrical Wiring
System Design) we hereby submit to you our Electrical Wiring System Design,
Compilation of Basic Information of Preparing Electrical Plan, Electrical Design of
Multi-Family Dwelling Unit, Commercial Building and Industrial Building.
We hope that this report will merit your approval.
Respectfully Yours,
Acknowledgement
First and Foremost we offer our sincerest gratitude to our God Almighty, who
remains our constant guide and counselor in our whole life. And of course, for our
Family who continuously give their love and support, morally and financially.
APPROVAL SHEET
Sir,
In Partial Fulfillment of the Requirements for the Degree of Bachelor of
Science in Electrical Engineering, this requirements in EE552D1 (Electrical Wiring
System Design) we hereby submit to you our Electrical Wiring System Design,
Compilation of Basic information of preparing Electrical Plan, Electrical Design of
Multi-Family Dwelling Unit, Commercial Building and Industrial Building.
Submitted By:
Design
1
Title
Grade
Commercial Building
Industrial Building
Approved By:
ENGR.EDGARDO O. DOMINGO, PEE
4
INDUSTRY LECTURER
Design Problem
1 Prepare a complete technical report and electrical system design of a
Multi-Family Dwelling unit, commercial and industrial building based on
your approved model.
2 Prepare a complete electrical plan, technical specification and budgetary
cost estimate of each structure.
Design/ Technical Report Requirements
a Prepare and submit a report concerning the following topic:
1 Principle of Electrical System Design
a Concept of Electrical Wiring and design provision
b Code, standards and General Specification
c Electrical Plan
d Electrical wiring permit and Final Certificate of Electrical Inspection
e Electrical estimating/ Budgetary Cost Estimate
f Other design constraints
b Prepare and submit a complete electrical plan of the following:
1 Multi-family Dwelling Unit At least 4-2 level dwelling unit with at least
150m2 floor area/ unit . Use 230V, 1 or 3, 60Hz power supply.
2 Commercial Structure At least 5 level 800m 2 /floor, commercial building.
Use 230V, 3, 60Hz power supply.
3 Industrial Plant At least 1500m2 , one level industrial plant. Use (any
voltage of your choice, 480V, 460V, 400V, 380V, 230V, 3, 60Hz power
supply.
Introduction
Electrical system design is a design of group of electrical components
connected to each other to carry out its operation whether it is through lighting,
5
circuit, and the auxiliary layout, which shows additional devices that would be used
in the system such as cable TV, telephone system, or CCTV. Also, title block must
be provided in order to properly label the design along with the proper scaling for
the electrical layout.
Once the electrical plan is completed, Professional Electrical Engineers will
sign and seal the plan ensuring that every detail in the plan is compliant with the
Philippine Electrical Code.
COMPILATION
OF
ELECETRICAL SYSTEM
DESIGN 1
EE552D1
EE51FA1
1ST SEMESTER
S.Y. 2014-2015
DESIGN NO. 1
SUBMITTED BY:
GRADE
Introduction
Electrical system design is a design of group of electrical components
connected to each other to carry out its operation whether it is through lighting,
convenience outlet, and/or motors. It is important to provide design prior to
construction of building in order to give customers a summary of the process of
each of its electrical equipment. Also, it is important in order to provide the cost
estimate for the electrical services in designing the whole electrical system of his
establishments.
It is a must that each design engineers should follow or go beyond the
minimum requirements as stated in newest edition of the Philippine Electrical Code
(PEC). PEC serves as the basis of each design engineers for justification of his
design in order to ensure that the design is safe from harm, has the capability to
handle each electrical load, reliable, and values money.
Before designing, design engineers shall consider different factors such as
nature of building, whether it is a dwelling unit, commercial or industrial, the
equipments to be used, and the source supply to be used whether it is single phase
or three phase system.
A hard copy of the design shall be made, also known as the electrical plan.
The electrical plan shall be concise and accurate in a manner that it would be
understood not only by the engineer but also the people/electrician who are going to
do the electrical system of the establishment. It must consist of the following parts;
10
General Notes and Specification, which states the specification that could not be
written in the load schedule and the guidelines that the design engineer follow in
creating the plan; Location Plan and site development plan, shows the location of
the site and the portion that the work would be done; Riser Diagram, it is a one-line
diagram that shows the location and inter-connection of the integral parts of the
system such as panel boards, CATV, telephone system, etc; Load Schedule and
computation, a table that shows the electrical load that would be used in the system
along with its volt-ampere rating, breaker to be used, and the sub-feeder wire to be
used. It is important to consult the PEC in creating the load schedule since it
provides a recommendation ampere rating for some of the load. Also, in the load
schedule, the design engineer computes the total connected load, in ampere. With
that, the engineer will recommend the main feeder wire to be used in the system;
next would be the electric layout, this will show the power layout, or the connection
of each branch circuit of convenience outlet, the lighting layout, which shows the
reflected ceiling plan of the system and the connection of each lighting per branch
circuit, and the auxiliary layout, which shows additional devices that would be used
in the system such as cable TV, telephone system, or CCTV. Also, title block must
be provided in order to properly label the design along with the proper scaling for
the electrical layout.
Once the electrical plan is completed, Professional Electrical Engineers will
sign and seal the plan ensuring that every detail in the plan is compliant with the
Philippine Electrical Code.
11
Architectural Plan
Floor Plan
Equipment Layout
Reflected Ceiling Plan
Power Layout
Technical Specification
PART 1 GENERAL
1.1
Description
A The work under this Division specification consists of Electrical Systems
and other related works, such as but not limited to fabrication, supply,
delivery, coordination and installation, shall be complete in all aspects for a
proper completion and turnover of the project except to those portion
clearly stated to be done by others.
B All works to be done shall be in accordance with the latest edition of
Philippine Electrical Code (PEC), National Building Code, Regulation of
locality, Utility provider, Manufacturer standard, other Governing applicable
codes and this Specification.
C This Specification provide a broad outline, understanding of the required
system and other associated equipment requirements for the project, but
not includes all detail in the design and construction.
13
1.2
Work Included
A. Under this Division of specification and as shown in plans, provide all
materials, equipment including all necessary accessories and perform all
the work needed to complete execution of electrical system but not limited
to the following main items:
1 Supply and installation of APPROVED, COORDINATED
COMPLETE power services as shown in the plans.
and
and
and
and
COORDINATED
14
Guarantees
A. The Contractors shall guarantee that the entire electrical systems are
free from all kinds of defect (workmanship and materials) with a minimum
covered period of two (2) years from the final date of acceptance of the
owner. Except for those guarantees or warranties for longer terms are
provided or specified herein, the longer term shall apply.
PART 2 PRODUCT
2.1
Material Standards
A All Materials to be use shall be brand new, in good conditions, free from
any defects, damage and corrosion.
B All Materials shall conform and certified or listed to a reputable 3 rd party
certifying body, such as UL, IEEE, NEMA, IPCEA and ASTM, on where
such standard has been established for particular types of materials.
C Sample of any materials shall be submitted to Design Engineer and
Architect for approval.
D All Materials shall be approved from both location and purposed intended.
15
contractor shall prepare and submit shop drawings for Engineer and
Architect review and approval.
2.3
16
2.6
Wiring Devices
A All plates (Appearance and color) for receptacle, switched and special
outlet shall be approved by Architect, Interior Designer and Owner.
B Receptacle outlet shall be grounding type 2 wires, rated at 10 Ampere,
240Volts. Termination shall be quick connect.
C Special outlet shall be grounding type rating as indicated in the plans.
Grounding System
A Grounding Busbars and wires shall be compliant with the latest PEC.
B All the electrical panel boards or cabinets disconnect and equipments
shall be properly grounded and bonded.
C Electrical contractor shall be responsible in insuring the continuity and
resistance to the ground having the maximum rating of 5 ohms for power
and 3 ohms for auxiliary. Contractor shall submit test result to the engineer
17
18
Complete Electrical
Plan
Conclusion
After doing the design, the group has learned a lot of ideas and concept
regarding electrical system design. From basic construction of electrical plan, power
layout, and lighting layout up to computation of load in the load schedule.
The group learned that designing is not as easy at looks like since as design
engineers, the group had the luxury to design where they believe the system would
19
be efficient without compromising the standards imposed by the PEC. PEC has
been a great help for the group from the start of the design up to the last detail of it.
References:
Philippine Electrical Code 2009. (2009).
20
DESIGN NO. 2
DESIGN OF A COMMERCIAL BUILDING
EE552D1
EE51FA1
21
1ST SEMESTER
S.Y. 2014-2015
DESIGN NO. 2
DESIGN OF A COMMERCIAL BUILDING
SUBMITTED BY:
GRADE
Objectives
3 To provide the students basic knowledge, understanding and skills in
designing electrical wiring system for residential, commercial and small
industrial and infrastructure facilities through the existing provision of
electrical system design and its specifications and standard mandated by
Philippine Electrical Code (PEC) and provision provided by Local
Government and utility companies of electrical wiring installation
22
Introduction:
Commercial unit is used for the whole system of an economy that
constitutes an environment for business. It may be office buildings,
warehouse or retail. In urban locations, a commercial building often combines
functions, such as an office on level 2-10, with retail on floor 1. Local
authorities commonly maintain strict regulations on commercial zoning, and
have the authority to designate any zoned area such as, a business must be
located in a commercial area or area zoned at least partially for commerce.
This project covers Electrical System Design for Commercial Units.It
also includes preparation of plans, technical and specifications, load analysis,
power and lighting design layouts, the load schedule and the location of
panel boards. We also define the major components of electrical plans and
conducted electrical load and analysis for the selection of feeder wires and
circuit breakers in this system design. We also prepared an electrical riser
23
diagram indicating the load circuit directory and selected a proper grounding
conductors for this kind of a three phase system unit.
24
DESIGN NO. 3
DESIGN OF A INDUSTRIAL BUILDING
EE552D1
EE51FA1
1ST SEMESTER
S.Y. 2014-2015
25
DESIGN NO. 3
DESIGN OF A INDUSTRIAL BUILDING
SUBMITTED BY:
GRADE
Objectives
5 To provide the students basic knowledge, understanding and skills in
designing electrical wiring system for residential, commercial and small
industrial and infrastructure facilities through the existing provision of
electrical system design and its specifications and standard mandated by
Philippine Electrical Code (PEC) and provision provided by Local
Government and utility companies of electrical wiring installation
6 To provide the students knowledge and skills in estimating/ preparing
budgetary cost estimate analysis on feeder load circuit and selection of
feeder protection based on manufacturers standards.
Design Problem
26
Introduction
A substation is
part
of
an
and distribution system. Substations transform voltage from high to low, or the
reverse, or perform any of several other important functions. Between the
generating station and consumer, electric power may flow through several
substations at different voltage levels.
It is a must that each design engineers should follow or go beyond the
minimum requirements as stated in newest edition of the Philippine Electrical Code
(PEC). PEC serves as the basis of each design engineers for justification of his
design in order to ensure that the design is safe from harm, has the capability to
handle each electrical load, reliable, and values money.
Once the electrical plan is completed, Professional Electrical Engineers will
sign and seal the plan ensuring that every detail in the plan is compliant with the
Philippine Electrical Code.
27
Architectural Plan
28
Technical Specification
PART 1 GENERAL
1.1
Description
D The work under this Division specification consists of Electrical Systems
and other related works, such as but not limited to fabrication, supply,
delivery, coordination and installation, shall be complete in all aspects for a
proper completion and turnover of the project except to those portion
clearly stated to be done by others.
E All works to be done shall be in accordance with the latest edition of
Philippine Electrical Code (PEC), National Building Code, Regulation of
locality, Utility provider, Manufacturer standard, other Governing applicable
codes and this Specification.
F This Specification provide a broad outline, understanding of the required
system and other associated equipment requirements for the project, but
not includes all detail in the design and construction.
1.2
Work Included
A. Under this Division of specification and as shown in plans, provide all
materials, equipment including all necessary accessories and perform all
the work needed to complete execution of electrical system but not limited
to the following main items:
10 Supply
and
installation
of
APPROVED,
COORDINATED
and
and
installation
of
APPROVED,
COORDINATED
and
and
installation
of
APPROVED,
COORDINATED
and
and
installation
of
APPROVED,
COORDINATED
and
29
National
Electrical
Testing
Association)
National Electrical Code
National Fire Protection Association
National
Electrical
Manufacturers
IEEE
Association
Institute of
UL
IEC
CE
IPCEA
Engineer
Underwriters Laboratories
International Electro-Technical Committee
Council of Europe
Insulated
Power
Cable
Engineers
NEC
NFPA
NEMA
CBM
IES
D Definitions:
Electrical
and
Electronic
Association
Certified Ballast Manufacturers Association
Illuminating Engineering Society
Guarantees
A. The Contractors shall guarantee that the entire electrical systems are
free from all kinds of defect (workmanship and materials) with a minimum
30
covered period of two (2) years from the final date of acceptance of the
owner. Except for those guarantees or warranties for longer terms are
provided or specified herein, the longer term shall apply.
PART 2 PRODUCT
2.1
Material Standards
E All Materials to be use shall be brand new, in good conditions, free from
any defects, damage and corrosion.
F All Materials shall conform and certified or listed to a reputable 3 rd party
certifying body, such as UL, IEEE, NEMA, IPCEA and ASTM, on where
such standard has been established for particular types of materials.
G Sample of any materials shall be submitted to Design Engineer and
Architect for approval.
H All Materials shall be approved from both location and purposed intended.
shall
submit
material
catalogue,
brochures,
product
31
contractor shall prepare and submit shop drawings for Engineer and
Architect review and approval.
2.3
No Conduit smaller than 15mm.dia. Electrical trade size shall be used and
conduit shall not be bend more than 3 times with the radius of 90degree.
J The interior and exterior of metallic conduits shall be standard weight, mid
steel, hot-dip galvanized and interior coating.
K Conduit shall be provided with guy-wires for wire pulling.
L Conduit shall be properly sealed to avoid entry of foreign object, dust,
moisture, water etc.
M 1.5 Meter should be the spacing from one conduit support to another
support. By means of C channels clamps, or by U-bolt.
32
Wiring Devices
D All plates (Appearance and color) for receptacle, switched and special
outlet shall be approved by Architect, Interior Designer and Owner.
E Receptacle outlet shall be grounding type 2 wires, rated at 10 Ampere,
240Volts. Termination shall be quick connect. As manufactured by
Panasonic.
F Special outlet shall be grounding type rating as indicated in the plans.
All Panel and cabinet shall be gauge # 16, with dead front construction
furnish, light gray enamel in color, powder coated.
33
L Contractor must first secure approval from the Engineer prior to fabrication
and delivery. Contractor must submit shop drawings of panel boards, in
full details including location, cable entry and exit, dimension of panel
(Wire Gutter and Breaker Area), brand of breaker, and size of busbars
Line, Ground and Neutral if applicable.
M Individual circuit breaker sensitivity shall be always coordinated between
its circuit breaker.
N Disconnecting means shall be lockable type, push button station that can
be locked in the open position unless otherwise specified in plans.
2.8
Grounding System
D Grounding Busbars and wires shall be compliant with the latest PEC.
E All the electrical panel boards or cabinets disconnect and equipments
shall be properly grounded and bonded.
F Electrical contractor shall be responsible in insuring the continuity and
resistance to the ground having the maximum rating of 5 ohms for power
and 3 ohms for auxiliary. Contractor shall submit test result to the
engineer.
34
Complete Electrical
Plan
Conclusion
After doing the design, the group has learned a lot of ideas and concept
regarding electrical system design. From basic construction of electrical plan, power
layout, and lighting layout up to computation of load in the load schedule.
The group learned that designing is not as easy at looks like since as design
engineers, the group had the luxury to design where they believe the system would
be efficient without compromising the standards imposed by the PEC. PEC has
been a great help for the group from the start of the design up to the last detail of it.
References:
Philippine Electrical Code 2009. (2009).