Sie sind auf Seite 1von 16

F-PES-TR

Rev-0

Precisely Right.

TECHNICAL REPORT
(AUDIT REPORT)
for

FINISH MILL & CRUSHER


LAFARGE REPUBLIC, INC. ILIGAN PLANT
BO. KIWALAN, ILIGAN CITY, PHILIPPINES

Date of Inspection
February 20, 2015
Date of Report
March 10, 2015
Prepared by:
Jose Roie S. Manaog
Technical Service Engineer
Checked by:
Elmer B. Ningas
Operation Head
Noted by:
Joseph M. Ascao
Operation Manager
Approved by:
Marlon B. Diokno
Chief Operating Offiicer

Beta Equipment Sales Corporation

Report No.: LRI-ILI-JSM-100315

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT WIDTH
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


FINISH MILL 1
1000MM
CLINKER

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CLINKER WF
CONVEYOR ID
N/A
DATE INSTALLED

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

3
ITEM
1
2

OBSERVATION AND FINDINGS

ANALYSIS
Penetration of dust and water from peel-off at joint
portion.
Inappropriate belt for transporting hot materials.

Peel-off at the joint portion of belt observed.


Cracks on top cover rubber

Carryback materials build-up underneath the conveyor.

Ineffective belt cleaning system installed. Belt cleaners


primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.3),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.

RECOMMENDATIONS
1
2
3

Replacement of Heat Resistance Conveyor Belt designed for specific condition.


Install belt cleaning system for carryback and material build-up solution at pulley and rollers.

1 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT WIDTH
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


FINISH MILL 1
650MM
GYPSUM

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
GYPSUM WF
DATE INSTALLED
N/A

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

3
ITEM
1
2
3

OBSERVATION AND FINDINGS

ANALYSIS

Carry back materials sticked to the conveyor belt.


Carryback materials build-up underneath the conveyor.
Material build-up at the face of return rollers.

Ineffective belt cleaning system installed. Belt cleaners


primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.1-3),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.

RECOMMENDATIONS
Install belt cleaning system for carryback and material build-up solution at pulley and rollers.

2 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT WIDTH
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


FINISH MILL 1
800MM
ADDITIVES

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
ADDITIVES WF
DATE INSTALLED
N/A

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

Secondary
Conveyor
2

ITEM

OBSERVATION AND FINDINGS

ANALYSIS
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
Excessive carry back materials beneath the conveyor and
the belt surface after unloading zone (as seen in Fig.1),
reached the return rollers and conveyor belt.
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.
Secondary cleaner cant serve its purpose due to
improper installation of conveyor belt. The secondary
cleaner's blade should be below the installed conveyor
belt to scrape the carryback materials.

Improper installation of conveyor belt.

1
2

RECOMMENDATIONS
Install belt cleaning system for carryback and material build-up solution at pulley and rollers.
Re-install Conveyor belt or Reposition of Secondary Cleaner.

3 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


FINISH MILL 1
750MM
CLINKER, GYPSUM & ADDITIVES

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
COMMON CONVEYOR
DATE INSTALLED
N/A

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

STOP

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM
1
2
3
4

1
2

OBSERVATION AND FINDINGS


ANALYSIS
Worn-out rubber lagging of Tail Pulley and misalignment
Worn-out rubber lagging will result premature damage
of belt.
Worn-out rubber lagging of Snub pulley.
to the face of pulley, misalignment (as seen in Fig.1) and
Worn-out rubber lagging of both Bend pulleys.
slippage between the pulley and belt.
Worn-out rubber lagging of Take-up Pulley.
RECOMMENDATIONS
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
Rubber lagging of Tail, Snub, Bend and Take-up pulleys.

4 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
750MM
CLINKER, GYMSUM & ADDITIVES

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
COMMON CONVEYOR
DATE INSTALLED
N/A

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

STOP

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM

4
OBSERVATION AND FINDINGS

Conventional skirting system.

Belt mistracking observed along the Conveyor System.

Multiple belt edge damaged along the conveyor belt.

Excessive carry back materials beneath the conveyor.

1
2
3
4

ANALYSIS
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage, damaging conveyor strucure, excessive material
spillages and worst is unnecessary stop in operation.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone (as seen in Fig.4),
thus preventing the material loses and also to protect
the conveyor accessories specially its idlers.

RECOMMENDATIONS
Modification of skirting system and install rubber lining to achieve good sealing.
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
Replacement of Conveyor Belt.
Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
5 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1300MM
LIMESTONE

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
B04
DATE INSTALLED
N/A

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM

OBSERVATION AND FINDINGS

ANALYSIS
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.3)

Worn-out rubber lagging at the Head Pulley.

Worn-out rubber lagging at the Take-up Pulley.

Without rubber lagging and excessive material build-up


at the face of both Bend Pulley.

RECOMMENDATIONS
Rubber lagging of Head, Bend and Take-up pulleys and remove fabricated scraper at the bend pulley to prevent
damage to the pulley.
Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.

6 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS
MATERIAL

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1300MM
LIMESTONE

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
B04
DATE INSTALLED
N/A

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

STOP

IMPACT BED

PICTURES/ILLUSTRATIONS

3
ITEM
1

OBSERVATION AND FINDINGS

Conventional skirting system and belt misalignment in


the tail area.

Multiple belt edge damaged along the conveyor belt.

1
2

ANALYSIS
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage (as seen in Fig.3), damaging conveyor strucure,
excessive material spillages and worst is unnecessary
stop in operation.

RECOMMENDATIONS
Modification of skirting system and install rubber lining to achieve good sealing.
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.

7 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1000MM

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
BC07

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

STOP

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM
1
2
3
4

1
2

OBSERVATION AND FINDINGS


ANALYSIS
Worn-out rubber lagging at both Bend Pulley.
Worn-out rubber lagging will result premature damage
Worn-out rubber lagging at Snub Pulley with fabricated to the face of pulley, misalignment and slippage
between the pulley and belt.
scraper.
Worn-out rubber lagging and excessive material build-up
at Tail Pulley.
Existing skirting system cannot control the escape of
Conventional skirting system.
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
RECOMMENDATIONS
Rubber lagging of Bend, Snub and Tail pulleys and remove fabricated scraper at the snub pulley to prevent damage
to the pulley.
Modification of skirting system and install rubber lining to achieve good sealing.

8 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1000MM

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
BC07

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM
1
2
3

1
2
3

4
OBSERVATION AND FINDINGS

ANALYSIS
Misalignment entails other conveyor system problem if
Conveyor belt hit the stucture.
not treated immediately. Those are like belt edge
damage (as seen in Fig.2), damaging conveyor strucure
(as seen in Fig.1), excessive material spillages and worst
Belt-edge Damage.
is unnecessary stop in operation.
Unequal distance and not aligned or damaged frame of
Tied-off carrying roller. (Self aligning frame & roller)
carrying rollers can cause belt mistracking.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
Excessive carryback materials build-up at the face of the
the belt surface after unloading zone, thus preventing
return rollers.
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.4)
RECOMMENDATIONS
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
Supply and replacement of carrying rollers.
Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
9 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1000MM

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
BC10A

STOP

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM
1,2

1
2
3

4
OBSERVATION AND FINDINGS

ANALYSIS
Worn-out rubber lagging will result premature damage
Worn-out rubber lagging and excessive material build-up
to the face of pulley, misalignment and slippage
at the Snub and Take-up Pulley.
between the pulley and belt.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
Excessive carryback materials build-up at the face of the
the belt surface after unloading zone, thus preventing
return rollers.
the material loses and also to protect the conveyor
accessories specially its idlers. (as seen in Fig.3)
Vertical rollers installed at the carrying side.

It will prevent belt edge damage but can't correct the


mistracking or misaligning of the conveyor belt.

RECOMMENDATIONS
Rubber lagging of Snub and Take-up pulley.
Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
10 of 11

INSPECTION REPORT
CUSTOMER
OPERATION SITE
BELT SPECS

LAFARGE REPUBLIC, INC. ILIGAN PLANT


CRUSHER
1000MM

SCOPE OF INSPECTION :
BELT CLEANER
CONVEYOR BELT

February 20, 2014


INSPECTION DATE
TYPE OF INSPECTION
RUNNING
CONVEYOR ID
BC10B

BELT TRACKER

TAIL PROTECTION

SKIRTING

PULLEY

ROLLER

OTHERS: ______________

STOP

IMPACT BED

PICTURES/ILLUSTRATIONS

ITEM
1

4
OBSERVATION AND FINDINGS

Conventional skirting system.


2
Belt mistracking observed along the Conveyor System.
3
Carryback materials build-up at the face of the return
rollers.

1
2
3
4

Worn-out rubber lagging at snub pulley.

ANALYSIS
Existing skirting system cannot control the escape of
fugitive material that lead to spillages on the side and
beneath the conveyor in the loading point area.
Misalignment entails other conveyor system problem if
not treated immediately. Those are like belt edge
damage, damaging conveyor strucure, excessive material
spillages and worst is unnecessary stop in operation.
Ineffective belt cleaning system installed. Belt cleaners
primary function is to remove the material that stick on
the belt surface after unloading zone, thus preventing
the material loses and also to protect the conveyor
Worn-out rubber lagging will result premature damage
to the face of pulley, misalignment and slippage
between the pulley and belt.

RECOMMENDATIONS
Modification of skirting system and install rubber lining to achieve good sealing.
Install Belt Tracker to provide immediate, powerful and continuous steering to correct belt's path, preventing
spillage, equipment damage and repairs.
Install multiple belt cleaning system for carryback and material build-up solution at pulley and rollers.
Rubber lagging of snub pulley.
11 of 11

Summary:
For Clinker WF
1. Replacement of Conveyor Belt (Heat Resistance)
2. Installation of (1) Martin Compact Cleaner for 1000mm BW.
For Gypsum WF
1. Installation of (1) Martin Compact Cleaner for 650mm BW.
For Additives WF
1. Installation of (1) Martin Compact Cleaner for 800mm BW.
For Common Conveyor
1. Installation of (3) Martin Belt Tracker upper and (3) lower unit for 750mm BW.
2. Rubber Lagging of (1) Tail Pulley 400mm dia. X 850mm length.
3. Rubber Lagging of (1) Snub Pulley.
4. Rubber Lagging of (2) Bend Pulley 280mm dia. X 850mm length.
5. Rubber Lagging of Take-Up Pulley 400mm dia. X 850mm length.
6. Installation of (1) Martin HD QC#1 Primary Belt Cleaner for 750mm BW.
7. Installation of (1) Martin SC16 Secondary Belt Cleaner for 750mm BW.
8. Installation of (1) Martin Torsion V-Plow for 750mm BW.
9. Install (1) Remaskirt with clamp.
10. Installation of (1) Martin Trac-mount MD Impact Cradles for 750mm BW.
11. Replacement of Belt Conveyor.

For BC04
1. Rubber Lagging of (1) Head Pulley 800mm dia. X 1450mm length.
2. Rubber Lagging of (1) Take-Up Pulley 600mm dia. X 1450mm length.
3. Rubber Lagging of (2) Bend Pulley 400mm dia. X 1450mm length.
4. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1300mm BW.
5. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1300mm BW.
6. Installation of (1) Martin Torsion V-Plow for 1300mm BW.
7. Install (1) Remaskirt with clamp.
8. Installation of (1) Martin Trac-mount HD Impact Cradles for 1300mm BW.
9. Installation of (2) Martin Belt Tracker upper and (3) lower unit for 1300mm BW.
For BC07
1. Rubber Lagging of (2) Bend Pulley 400mm dia. X 1200mm length.
2. Rubber Lagging of (1) Tail Pulley 400mm dia. X 1200mm length.
3. Rubber Lagging of (1) Snub Pulley 300mm dia. X 1200mm length.
4. Install (1) Remaskirt with clamp.
5. Installation of (1) Martin Trac-mount MD Impact Cradles for 1000mm BW.
6. Installation of (2) Martin Belt Tracker upper and (3) lower unit for 1000mm BW.
7. Installation of (1) Martin HD QC#1 Primary Belt Cleaner for 1000mm BW.
8. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
9. Installation of (1) Martin Torsion V-Plow for 1000mm BW.
10. Checking and replacement of carrying rollers.

For BC10A
1. Rubber Lagging of (1) Snub pulley.
2. Rubber Lagging of (1) Take-up Pulley.
3. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1000mm BW.
4. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
5. Installation of (1) Martin Torsion V-Plow for 1000mm BW.
6. Installation of (2) Martin Belt Tracker upper and (3) lower unit for 1000mm BW.
For BC10B
1. Install (1) Remaskirt with clamp.
2. Installation of (1) Martin Trac-mount MD Impact Cradles for 1000mm BW.
3. Installation of (3) Martin Belt Tracker upper and (3) lower unit for 1000mm BW.
4. Installation of (1) Martin XHD QC#1 Primary Belt Cleaner for 1000mm BW.
5. Installation of (1) Martin SC16 Secondary Belt Cleaner for 1000mm BW.
6. Installation of (1) Martin Torsion V-Plow for 1000mm BW.
7. Rubber Lagging of Snub Pulley

PROPOSAL
Item No.

Particular

Qty

U/M

Part No.

Price (Php)

Total amount (Php)

Conveyor Belt Bridgestone NF315/2 1000 x 3.0 x 2.0 x 10m SF-180 (Endless) for Clinker WF

10

Mts

n/a

Martin Compact Cleaner (Green) for 1000mm BW

Assy.

33464-3600GR

Martin Compact Cleaner (Orange) for 800mm BW

Assy.

33464-3000

Martin Compact Cleaner (Orange) for 650mm BW

Assy.

33464-3400

QC #1 Extra Heavy Duty Cleaner 52" BW with Martin Extra Heavy Duty Spring Tensioner

Assy.

35899-540048T

QC #1 Extra Heavy Duty Cleaner 40" BW with Martin Extra Heavy Duty Spring Tensioner

Assy.

35899-420036T

QC #1 Heavy Duty Cleaner 40" BW with Martin with MARTIN TWIST Tensioner

Assy.

36898-420036T

QC #1 Heavy Duty Cleaner 30" BW with Martin with MARTIN TWIST Tensioner

Assy.

36898-300024T

MARTIN SC#16 with T Bracket for 1300mm BW

Assy.

SC#16/HAR/1350

10

MARTIN SC#16 for 1000mm BW

Assy.

SC#16/HAR/1050

11

MARTIN SC#16 for 750mm BW

Assy.

SC#16/HAR/750

12

Martin Torsion V-Plow for 1300mm BW

Assy.

28488-48R

13

Martin Torsion V-Plow for 1000mm BW

Assy.

28488-42R

14

Martin Torsion V-Plow for 750mm BW

Assy.

28488-30R

15

Martin Tracker - Performance Duty Upper Unit for 1300mm belt width

Assy.

TKR-48US

16

Martin Tracker - Performance Duty Lower Unit for 1300mm belt width

Assy.

TKR-48LS

17

Martin Tracker - Performance Duty Upper Unit for 1000mm belt width

Assy.

TKR-42US

18

Martin Tracker - Performance Duty Lower Unit for 1000mm belt width

Assy.

TKR-42LS

19

Martin Tracker - Performance Duty Upper Unit for 750mm belt width

Assy.

TKR-30US

20

Martin Tracker - Performance Duty Lower Unit for 750mm belt width

Assy.

TKR-30LS

21

Martin Trac-mount HD Impact Cradle for 1300mm BW

Assy.

37357-4845S

22

Martin Trac-mount MD Impact Cradle for 1000mm BW

Assy.

30688-4245S

23

Martin Trac-mount MD Impact Cradle for 750mm BW

Assy.

30688-3045S

24

Remaskirt with clamp

Lots

n/a

25

Rubber lagging of Tail Pulley 400mm dia. X 850mm length

Lot

n/a

26

Rubber lagging of Bend Pulley 280mm dia. X 850mm length

Lots

n/a

27

Rubber lagging of Bend Pulley 400mm dia. X 850mm length

Lot

n/a

28

Rubber lagging of Head Pulley 800mm dia. X 1450mm length

Lot

n/a

29

Rubber lagging of Take-up Pulley 600mm dia. X 1450mm length

Lot

n/a

30

Rubber lagging of Bend Pulley 400mm dia. X 1450mm length

Lots

n/a

31

Rubber lagging of Bend Pulley 400mm dia. X 1200mm length

Lots

n/a

32

Rubber lagging of Snub Pulley 300mm dia. X 1200mm length

Lot

n/a

33

Rubber lagging of Tail Pulley 400mm dia. X 1200mm length

Lot

n/a

34

Rubber lagging of Snub Pulley for Common Conv., BC10A and BC10B

Lots

n/a

35

Rubber lagging of Take-up Pulley for BC10A

Lot

n/a

36

Conveyor Belt for Common Conveyor (750mm)

Lot

n/a

37

Carrying Roller Improvement (Mech'l works)


1.1. Replacement and Installation of New Carrying Rollers.
1.2. Checking and squaring of roller frames.

Lot

n/a

Grand Total
Note:
Item No. 21, 24, 34, 35, 36 and 37 for further inspection and evaluation.