Sie sind auf Seite 1von 44

RISK ASSESSMENT FORM -

Date : 8/ 9 /2014

Potable Water Works


Who Might be
Harmed

Contractor

SR #
/

Excavated after
setting out

Setting up survey
equipment

12

Ensure applicable external excavation pe


concerned autority are received fo
construction of the Potable

Lack of applicable permits, Contractor,


instructions, as-built drawings, involved employees
cable detection etc.

12

Ensure availability of updated as-built d


underground utilities of the location .Re
identify approximate location and depth o
Use cable detectors to find out the route

Tripod falling over

Task to be done by a trained and c

work - without permit -(hot works,


Confined sapce legal noncompliance

Safety precautions needed to contro



Risk Rating

Hazard / Conditions that could


develop hazard


Initial Risk

Likelihood

Activity

person who is doing the task must be comp


the correct equipm

surveyor

surveying assistant knocking peg into


surveyor assistant
ground

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Description of work

Locations for attenuation tanks on site

Consequenc
es

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Project Name :

Ref No:

Page 1 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Setting up survey

equipment

surveyor assistant standing on edge


without any fall protection

Access for excavation


equipments, loading trucks etc.
-vehicle /equipment accidents

surveyor assistant

Safety precautions needed to contro

16

Drivers/operators
Inviolved peiople

Working inside
excavation

surveyor assistant should be provided with


paltform while work at

Provide entry gate at one location of pro


excavation; restricrted for construction
involverd in the Potable water work . Po
unauthorised entry of vehicles, people
3

Provide access ramp of enough wid


excavation for construction equipme
provided. Ensure edge protection fo
Falling of loose materials from the Workers
inside
sides - Injuries.
manhole`nch.

Lose Materials


Initial Risk

Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

12

Clear loose materials including stones fro


Install green mesh at the walls of excava
Page 2 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Lose Materials

*ALARP - As Low As Reasonably Practicable

Signature :

1
2
3
4

Date: 8/9/2014

Likelihood /

Severity /

Remote /
Unlikely /
Likely /
Frequent /

Minor /
Major /
Severe /
Fatality /

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Reviewed by: Engr. Amir Iskander (Project Construc

:
:

Assessed By:
8/9/2014
Date:

Likelihood
Severity

Signature:
4

16

12

3
2

12

8
4

Page 3 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Pipeline, fitting and


Jointing Installation

Lifting injury,Swinging load

Equipment & Truck operations

Pipe Bedding


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

12

Involved workers and


vicinity people

Operators, Involved
workers
3

Correct manual handling techniques,Use me


possible,Maintain control of loads when lifting
to ground while moving

Provide safe access for trucks, equipmen


Engage third party certified equipments
Assign trained Flagmen to guide equipm

workers

Ensure nobody inside trench while puttin

workers

Ensure nobody inside trench while puttin

workers,public

Reinstate edge protections of trenches e

Workers inside trench -Injuries


Workers inside trench -Injuries
Not reinstating edge protections
Using inadequate crane ,
incompetent operators, riggers.

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Pipe unloading,
stacking at work site .

Involved workers ,
others in the
vicinity

Select cranes of appropriate capaci


inspection certificates of
cranes
and lif
Page
4 of 9
License of operator, third party certifica

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #

Pipe unloading,
stacking at work site .

Using inadequate crane ,


incompetent operators, riggers.

Involved
workers ,


Initial Risk

*ALARP - As Low As Reasonably Practicable

Signature :
Severity /

Remote /

Minor /

Unlikely /

Major /

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

:
:

Select cranes of appropriate capaci


inspection certificates of cranes and lif
License of operator, third party certifica

Likelihood
Severity

Pipes should be kept at least 1 mtr aw


perendicular to the trench. Do not o
fastening on a bundle of pipe is remove
down to ground level to prevent rolling an
Reviewed by: Engr. Amir Iskander (Project Construc
Date: 8/9/2014

Likelihood /

others in the
vicinity

Unsafe Pipe
stacking at site Involved workers
.-Rolling, Falling of pipe : Injuries
and Damages.

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Signature:
4

16

12

12

Page 5 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Locations for attenuation tanks on site


Potable Water Works
Hazard / Conditions that could
develop hazard

Who Might be
Harmed

Likely /

Severe /

4
3

Frequent /

Fatality /

Safety precautions needed to contro

12

SR #


Initial Risk

Risk Rating

Description of work

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2


3
1

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Consequenc
es

Project Name :

Ref No:

12

Pipe Installing

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

:
:

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014
Page 6 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #

Signature :

:
Likelihood
Severity

Safety precautions needed to contro

Signature:
4

16

12

12

Severe /

Fatality /

Likelihood /

Severity /

1
2

Remote /
Unlikely /

Minor /
Major /

Likely /

4
4

Frequent /

Hazard of newly laid


pipeline
network becoming live with
Connecting existing hazardous gases when only one Worker going inside
resident's internal drainage line is
live manhole
live water mains
connected to one n

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012


Initial Risk

Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

16

2. The time for fixing pipe at the bottom


manholes inside the manhole will be high w
exposure to hazardous gases/lack of oxygen

Page 7 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

3.Hazard of not having a secured platform fo


said pipe fitting job inside the manhole
avoided.
4. Pressure /leak proofness testing of th
manhole shall be completed before it becom

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 8 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

SR #
5

Who Might be
Harmed


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
1
2
3
4

Likelihood /
Remote /
Unlikely /
Likely /
Frequent /

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:
:

Severity /
Minor /
Major /
Severe /
Fatality /

Likelihood
Severity
4
3
2
1

Signature:
4

16

12

12
8
4

9
6
3

4
2

2
1

Page 9 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Lifting operations
Unsafe Equipment / incompetent
during construction of Operations - accidents ,injuries.
attenuation tank.Steel /shutter and
other construction
materials.

Operator involved
workers and
anybody in the
vicinity

Improper
locating
of
crane Operator
-Colapse
of
excavation workers
edges,overturning of crane - anybody
injuries and damages
vicinity

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

12

involved
and
in the
4

12

Ensure crane / lorry crane of of approp


good working condiction. Ensure vali
certificates of crane/lorry crane, slings an

Ensure crame / lorry crane operators ha


and riggers should have valid third party

Out riggers of the crane should be fixed


more from the excavation edges which
the ground condition against collapse
collapse of ground is suspected do n
indicator should be checked at each
extension and boom angle.

Page 10 of 9

RISK ASSESSMENT FORM -


Ref No:

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2


Locations for attenuation tanks on site
Potable Water Works

Initial Risk

Who Might be
Harmed

SR #
/

lifting excess load more than safe Operator,Involved


load - Fall oF materials, crane workers
overturning etc.
unprotected
lifting
area
unauthorised entry,injuries
Undesired movement
-accidents,Injuries

of

- workers
unauthorised
peiople

Safety precautions needed to contro



Risk Rating

Hazard / Conditions that could


develop hazard

Likelihood

Activity

Consequenc
es

Lifting
Date
: 8/operations
9 /2014
during construction of
Project tank.Name :
attenuation
Steel /shutter and
Assessment
location :
other construction
Descriptionmaterials.
of work
:
6

12

load Involved workers,


anybody in vicinity

Load indicator should be checked a


load,boom extension and boom angle.O
at each position.

Ensure nobody under lifting load,especi


tank construction area. Barricade liftin
signs and prevent unauthorised entry.

Use taglines to control the undesired m


and to place it at desired location. .

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
Likelihood /
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:
:

Severity /

Likelihood
Severity

Signature:
4

1
Page 11 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #

1
2
3
4
7

Remote /
Unlikely /
Likely /
Frequent /

/

Minor /
Major /
Severe /
Fatality /


Likelihood

Severity
4
3
2
1

Steel and carpentary Using power tools like cutter /


grinder, drill,bending and cutting
works
machine etc. - Injuries,electrical
shocks,fatality


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

1
4
3

16

12

12
8
4

9
6
3

6
4
2

2
1

Assign trained workers only to operate p


Ensure safe condition of poweer tools ,
reciprocating parts etc. c.
involved
anybody
vicinity

workers,
in the

Electrical extensions to be done throug


insulation damage, short circuit and elec

Electrical cables should not be put ov


Provide temporary post to extend the cab

Ensure ELCB at power source in working

Disconnect electrical extensions when no


HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 12 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Description of work

Activity

Locations for attenuation tanks on site


Potable Water Works
Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Spark during cutting -Fire and


Involved workers
Burn injuries.
Dust -inhalation, eye injuries


Initial Risk

Safety precautions needed to contro



Risk Rating

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Likelihood

Project Name :

Ref No:

Consequenc
es

Ensure workers wear PPE - Safety Goog


hand gloves, safety shoes helmet and co

Ensure no combustibles in the vicinity.Ke


extinguishers
Involved workers

Ensure safe and appropriate tools are u


allowed.Use PPE -Hand Gloves, safety
shoes,safety helmet,cover all.

Manual handling - hit/strike by


steel / wood, Injuries from Involved workers
protruding nails

Conduct TBT and explain the hazards a


protruding nails should be segregated at
work. Arrange for denailing of wood.

Using hand tools - Injuries

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

:
:

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014
Page 13 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Signature :
1
2
3
4
8


Initial Risk

Likelihood /
Remote /
Unlikely /
Likely /
Frequent /

Severity /
Minor /
Major /
Severe /
Fatality /

Work at height for


steel fixing, shuttering
and concreting of tank
walls, columns, etc.

Unsafe working platform /


scaffolding - Fall accidents,,
slip,trip etc.- Injuries

Likelihood
Severity
4
3
2
1

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Signature:
4

16

12

12
8
4

9
6
3

4
3

4
2

2
1

Ensure safe and suitable scaffolding as


should have platforms without gaps, gua
at all sides, toe boards, acce
Involved workers

The scaffolding should be inspected an


work shall be done on red / Untag
Safety harness should be worn and
supervising at overhead

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 14 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2


Locations for attenuation tanks on site

develop hazard

SR #
/

Who Might be
Harmed

Involved workers


Initial Risk

Safety precautions needed to contro



Risk Rating

Potable Water Works


Description
8
Workof
atwork
height for:
Unsafe working platform /
steel fixing, shuttering
scaffolding - Fall accidents,,
and concreting of tank
slip,trip etc.- Injuries
walls, Activity
columns, etc. Hazard / Conditions that could

Likelihood

Assessment location :

Ref No:

Consequenc
es

Project Name :

Materials shall not be accumulated o


walkways,to prevent trip hazards.
Unauthorised alterations on
scaffolding / platform - collapse,
9

workers

Concreting work for Overload on scaffold platform workers


walls and columns collapse, accident,injuries
mishandling / falling of vibrator
workers

No unauthorised ateration shall be don


work. It should be done by auth

Ensure no over loading of the scaffo


people,Control number of wo
The platform should have enough widt
stand and move vibrator on it. Handlin
operators oonly. Ensure toe- board prot
vibrator.

undesired movement of concrete workers


hose - whip Injuries, concrete fall
on head.

Continuous monitoring by supervisor


concrete hose. .Ensure workers take
Climbuing over shuttering for concreting

Contact with concrete - Skin workers


irritation, eye injuries,ill- health

Ensure the workers use safety helmet,g


Hand gloves, cove

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 15 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
1
2
3
4

10

Likelihood /
Remote /
Unlikely /
Likely /
Frequent /

Roof shutter
Installation

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:

Severity /
Minor /
Major /
Severe /
Fatality /

Likelihood
Severity
4
3
2
1

Substandard supporting structure


Workers, others in
for roof work-collapse
the vicinity

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Signature:
2

12

9
6
3

4
3

16
12
8
4

4
2

12

2
1

Ensure approved design for the sup


constructed with the right struc

Page 16 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity
SR #

10

Potable Water Works


Hazard / Conditions that could
develop hazard

Roof shutter
Installation


Initial Risk

Who Might be
Harmed

Incompetent workers /supervisors Worker,others


for structure installation - structure the vicinity
Collapse

12

in

Fall of structure materials while


installing - Injuries to people

workers, anybody
in the vicinity

Work at height during structure


installation

workers,anybody in
the vicinity

Assign trained and competent workers i


design under competent supervisor. En
installation and strngth o

Cordon the structure installation area


prevent unauthorised entry int
3

3
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Guide and monitor material handling. W


postures against probable falling of struc

Scaffold boards secuured by tying / clam


used as workingplatform during structure
used as working platform.Ensure the ins
is strong and stable to put scaffold

Page 17 of 9

10

Roof shutter
Installation

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
Work athazard
height during structure
develop

installation

SR #

Who Might be
workers,anybody
in
Harmed

the vicinity


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Involved workers should wear and hoo


working at heights.
Unauthorised entry into structure unauthorised
erection area- injuries
people

Barricade the work area and preve

*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
1
2
3
4

Likelihood /
Remote /
Unlikely /
Likely /
Frequent /

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:
:

Severity /
Minor /
Major /
Severe /
Fatality /

Likelihood
Severity
4
3
2
1

Signature:
2

12

9
6
3

4
3

16
12
8
4

4
2

2
1

Page 18 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

11

Uncertified support structure 0Collapse during concreting


Concreting roof
shutter

12

Unauthorised people under


structure during concreting injuries in case of collapse /
dislocation/fall of materials..

Workers

workers

Concreting work for


Unsafe access
roof
Overload on roof shuttering workers
collapse, accident,injuries
mishandling / falling of vibrator

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

workers


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

12

The support structure and shuttering for


inspected and certified for it's strength
concreting.

Barricade the underneath of roof sh


unauthorised entry; especially during con
assigned to ensure the sam

Provide safe acess / bridge to


3

Ensure no over loading of the roof sh


Control number of worke

. Handling / operate by competent op


board protection to prevent falling of vibr
Page 19 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

12

Potable Water Works

Concreting
work for Hazard / Conditions that could
Activity
develop hazard
roof

Who Might be
Harmed

SR #
/

undesired movement of concrete workers


hose - whip Injuries, concrete fall
on head.


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

Contact with concrete - Skin


irritation, eye injuries,ill- health
13

Deshuttering of roof
and removing support
structure

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Fall of shutter boards, structure


materials- Injuries

Continuous monitoring by supervisor


concrete hose. .Ensure workers take saf

Ensure the workers use safety helmet,g


Hand gloves, cove
Workers, anybody
in vicinity
3

Dismantling to be done by authorised


Provide supervision and guidamnce to p
shutyter materia

Barricade the work area and preven


*ALARP - As Low As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
Likelihood /
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:
:

Severity /

Likelihood
Severity

Signature:
4

1
Page 20 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #

1
2
3
4
15

16

Remote /
Unlikely /
Likely /
Frequent /

/

Minor /
Major /
Severe /
Fatality /


Likelihood

Severity
4
3
2
1

Unsafe access
Concreting work for
roof
Overload on roof shuttering workers
collapse, accident,injuries
mishandling / falling of vibrator
workers
undesired movement of concrete workers
hose - whip Injuries, concrete fall
on head.
Contact with concrete - Skin
irritation, eye injuries,ill- health
Deshuttering of roof
Fall of shutter boards, structure Workers, anybody
and removing support
materials- Injuries
in vicinity

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012


Initial Risk

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

16

12

12
8
4

9
6
3

4
2

Provide safe acess / bridge to


Ensure no over loading of the roof sh
Control number of worke
. Handling / operate by competent op
board protection
to prevent
of vibr
Continuous
monitoring
byfalling
supervisor
concrete hose. .Ensure workers take saf

Ensure the workers use safety helmet,g


Hand gloves, cove
Dismantling to be done by authorised
Provide supervision and guidamnce to p

Page 21 of 9

RISK ASSESSMENT FORM -


Date : 8/ 9 /2014

Activity

Potable Water Works


Hazard / Conditions that could
develop hazard

Who Might be
Harmed

SR #
/

Fall of shutter boards, structure


materials- Injuries

16

and removing support


structure
*ALARP - As Low
As Reasonably Practicable

Assessed By: Mr. V.Jacob (HSE Manager)


8/9/2014
Date:
Signature :
1
2
3
4

Likelihood /
Remote /
Unlikely /
Likely /
Frequent /

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Workers,
anybody
in vicinity


Initial Risk

Likelihood
Severity
4
3
2
1

Barricade the work area and preven

Reviewed by: Engr. Amir Iskander (Project Construc


Date: 8/9/2014

:
:
:

Severity /
Minor /
Major /
Severe /
Fatality /

Safety precautions needed to contro



Risk Rating

Description of work

Locations for attenuation tanks on site

Likelihood

Assessment location :

DN001-P01/CGC-SACYR/HSE/RKA/000

Roads and Infrastructure in Bani Hajer North. Phase 1 & 2

Consequenc
es

Project Name :

Ref No:

Signature:
2

12

9
6
3

4
2

16
12
8
4

Page 22 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Ensure applicable external excavation permit and permission from


concerned autority are received for the excavation and
construction of the Potable water works.
2

Task to be done by a trained and competent surveyor

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Construction Manager,
Site engineer

Ensure availability of updated as-built drawings of cable and other


underground utilities of the location .Refer the as-built drawing to
identify approximate location and depth of cables.
Use cable detectors to find out the route / location of cables.

person who is doing the task must be competent and must make use of
the correct equipment.

Responsible Person

Survey Engineer

Surveyer

Page 23 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

surveyor assistant should be provided with ladder or provide working


paltform while work at height

Likelihood

"

Surveyer

Site Engineer,
Gen.Foreman

Provide entry gate at one location of protection barrier around the


excavation; restricrted for construction equipments and trucks
involverd in the Potable water work . Post sign boards to prevent
unauthorised entry of vehicles, people. Assign gate keeper.
Provide access ramp of enough width and slope into the
excavation for construction equipments and vehicles to be
provided. Ensure edge protection for ramp as required.
Clear loose materials including stones from the edges excavation.
Install green mesh at the walls of excavation..
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Site Engineer, Foreman

Page 24 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

:
:
:

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 25 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *


Risk Rating

RESIDUAL
RISK

Responsible Person

Correct manual handling techniques,Use mechanical aids where


possible,Maintain control of loads when lifting & moving.Carry pipes close
to ground while moving

Provide safe access for trucks, equipments for bedding work.


Engage third party certified equipments and operators only.
Assign trained Flagmen to guide equipments and trucks

Site Engineer,
Foreman,Foreman

Ensure nobody inside trench while putting bedding material.

Foreman

Ensure nobody inside trench while putting bedding material.

Foreman

Reinstate edge protections of trenches every day after work.

Gen.Foreman, Foreman

Site Engr, Gen.Foreman,


Garage Foreman.

Select cranes of appropriate capacity. Ensure Third party


inspection
of cranes
and
HSEF 4.3.1-01-01 Issue:certificates
1 Rev: 2 Issue
Date: 20
Marlifting
2012slings and tackles. ,
License of operator, third party certificates of operators, riggers.

Page 26 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:
RESIDUAL
RISK

Risk Rating

Select cranes of appropriate capacity. Ensure Third party


inspection certificates of cranes and lifting slings and tackles. ,
License of operator, third party certificates of operators, riggers.

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

Pipes should be kept at least 1 mtr away from trench edges and
perendicular to the trench. Do not overstack pipes. Once a 1
fastening on a bundle of pipe is removed, pipes should be brought
down to ground level to prevent rolling and falling.
eviewed by: Engr. Amir Iskander (Project Construction Director)
8/9/2014

gnature:

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Responsible Person

Site Engr, Gen.Foreman,


Garage Foreman.
Gen.Foreman, Foreman

:
:
:

Page 27 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *


Risk Rating

RESIDUAL
RISK

Responsible Person

:
:
Page 28 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

gnature:

Responsible Person

:
1
4
3

2
1

2. The time for fixing pipe at the bottom and top section of deep
manholes inside the manhole will be high when considering the worker's
exposure to hazardous gases/lack of oxygen inside.

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Construction Manager,
Pipeline
Project
Engineer

Page 29 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

3.Hazard of not having a secured platform for the worker to do the above
said pipe fitting job inside the manhole at various heights shall be
avoided.
4. Pressure /leak proofness testing of the piping connected to the
manhole shall be completed before it become live.

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 30 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

gnature:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

:
:
:

1
4
3

2
1

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 31 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Ensure crame / lorry crane operators have valid license. Operators


and riggers should have valid third party certificate.
Out riggers of the crane should be fixed at least one meter away or
more from the excavation edges which should be decided as per
the ground condition against collapse of the edges. . Where
collapse of ground is suspected do not carry out lifting. Load
indicator should be checked at each location, as perload,boom
extension and boom angle.

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012


Risk Rating

Ensure crane / lorry crane of of appropriate lifting capacity and in


good working condiction. Ensure valid third party inspection
certificates of crane/lorry crane, slings and lifting tackles.

Likelihood

"

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Site Engineer, Garage


Foreman

Site Engineer, Foreman,


crane
operator,Rigger

Page 32 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Ensure nobody under lifting load,especially inside the excavation /


tank construction area. Barricade lifting area , Post NO ENTRY
signs and prevent unauthorised entry.
Use taglines to control the undesired movement of lifted up item
and to place it at desired location. .

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

gnature:


Risk Rating

Load indicator should be checked at each location, as per


load,boom extension and boom angle.Only safe load shall be lifted
at each position.

Likelihood

"

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Foreman,
Operator,Rogger

Foreman, Operator
Rigger

Foreman, operator,Rigger

:
:
:

1
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 33 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

4
3

2
1

Assign trained workers only to operate power tools.


Ensure safe condition of poweer tools , safety guard over roating /
reciprocating parts etc. c.
Electrical extensions to be done through safe routes to prevent
insulation damage, short circuit and electrical shocks.

Foreman, Electrician,
power tool operator

Electrical cables should not be put over stell / steel form work.
Provide temporary post to extend the cable.
Ensure ELCB at power source in working condition
Disconnect electrical extensions when not using power tools
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 34 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Ensure workers wear PPE - Safety Googles, dut mask, heavy duty
hand gloves, safety shoes helmet and cover all.
Ensure no combustibles in the vicinity.Keep stand by
extinguishers


Risk Rating

"

Responsible Person

Likelihood

Safety precautions needed to control the Risk to ALARP *

Consequenc
es

RESIDUAL
RISK

Foreman,

Fire

Foreman

Ensure safe and appropriate tools are used. No home made tools
allowed.Use PPE -Hand Gloves, safety googles, duct mask, safety
shoes,safety helmet,cover all.

Foreman

Conduct TBT and explain the hazards and precautions. Wood with
protruding nails should be segregated at a barricaded place during
work. Arrange for denailing of wood.

Foreman

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

:
:
Page 35 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

gnature:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

:
1
4
3

2
1

Ensure safe and suitable scaffolding as per the job. Scaffoldings


should have platforms without gaps, guard rails (top and mid rails) ,
at all sides, toe boards, access ladder etc.
The scaffolding should be inspected and tagged before work. No
work shall be done on red / Untagged scaffoldings...

Site Engineer,Scaffolding
Foreman, Foreman

Safety harness should be worn and hooked while working /


supervising at overhead platforms. .
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 36 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Likelihood


Risk Rating

"

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Foreman

Foreman

Foreman

Site Engineer,Scaffolding
Foreman, Foreman

Materials shall not be accumulated on the platform,obstructing


walkways,to prevent trip hazards.
No unauthorised ateration shall be done on scaffoldings during
work. It should be done by authorised scaffolder..
Ensure no over loading of the scaffold platform; with extra
people,Control number of workers needed.
The platform should have enough width for concrete workers to
stand and move vibrator on it. Handling / operate by competent
operators oonly. Ensure toe- board protection to prevent falling of
vibrator.
Continuous monitoring by supervisor for safe movement of
concrete hose. .Ensure workers take safe positions/postures.
Climbuing over shuttering for concreting shall not be allowed.

Ensure the workers use safety helmet,googles, gum boots, PVC workers
Hand gloves, cover all.
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 37 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

Responsible Person

:
:

gnature:

:
1
4
3

2
1

Ensure approved design for the support structue and it is


constructed with the right structure materials .

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Site Engr.Foreman

Page 38 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Assign trained and competent workers install the structure as per


design under competent supervisor. Engineer to ensure the right
installation and strngth of structure.

Likelihood

"

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Site Engineer,Foreman

Site Engineer, Foreman

Site Engineer,Foreman

Cordon the structure installation area. Post sign boards and


prevent unauthorised entry into erection area.
Guide and monitor material handling. Workers should take safe
postures against probable falling of structure material.
Scaffold boards secuured by tying / clamping on structure shall be
used as workingplatform during structure erection. boards shall be
used as working platform.Ensure the installed section of structure
is strong and stable to put scaffold boards as platform.

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 39 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Likelihood


Risk Rating

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Responsible Person

Site Engineer,Foreman

Foreman

Involved workers should wear and hook safety harnesses while


working at heights.
Barricade the work area and prevent unauthorised entry

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

gnature:

:
:
:

1
4
3

2
1

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 40 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Barricade the underneath of roof shuttering and prevent


unauthorised entry; especially during concreting. One person to be
assigned to ensure the same continually.

Responsible Person


Risk Rating

The support structure and shuttering for roof concreting should be


inspected and certified for it's strength against collapse during
concreting.

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Construction Manager,
Concerned Engineer

Site Engineer,Foreman
4

Provide safe acess / bridge to roof shuttering


Ensure no over loading of the roof shutter with extra people,
Control number of workers needed.
. Handling / operate by competent operators oonly. Ensure toeboard protection to prevent falling of vibrator.
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Foreman

Foreman
Page 41 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

Responsible Person


Risk Rating

Continuous monitoring by supervisor for safe movement of


concrete hose. .Ensure workers take safe positions/postures.

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Foreman

Site Engineer, Foreman

1
1

Ensure the workers use safety helmet,googles, gum boots, PVC


Hand gloves, cover all.
Dismantling to be done by authorised competent workers only.
Provide supervision and guidamnce to prevent undesired falling of
shutyter materials

Barricade the work area and prevent unauthorised entry.

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

gnature:

:
:
:

1
HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 42 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:


Risk Rating

Likelihood

"

Responsible Person

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Foreman

1
1

Foreman

Foreman

Site Engineer, Foreman

4
3

2
1

Provide safe acess / bridge to roof shuttering


Ensure no over loading of the roof shutter with extra people,
Control number of workers needed.
. Handling / operate by competent operators oonly. Ensure toeboard protection
to prevent
of vibrator.
Continuous
monitoring
byfalling
supervisor
for safe movement of
concrete hose. .Ensure workers take safe positions/postures.
Ensure the workers use safety helmet,googles, gum boots, PVC
Hand gloves, cover all.
Dismantling to be done by authorised competent workers only.
Provide supervision and guidamnce to prevent undesired falling of

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 43 of 9

SMENT FORM -
DN001-P01/CGC-SACYR/HSE/RKA/00053

:
:

:
:

eviewed by: Engr. Amir Iskander (Project Construction Director)


8/9/2014

gnature:


Risk Rating

Barricade the work area and prevent unauthorised entry.

Responsible Person

Likelihood

"

Consequenc
es

Safety precautions needed to control the Risk to ALARP *

RESIDUAL
RISK

Site Engineer, Foreman


:
:
:

1
4
3

2
1

HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012

Page 44 of 9

Das könnte Ihnen auch gefallen