Sie sind auf Seite 1von 2

Name of the Procuring Entity

Project Reference Number


Name of the Project
Location of the Project

Standard Form Number: SF-GOOD-48


Revised on: May 24, 2004

BAC Resolution Declaring LCRB and Recommending Approval


RESOLUTION NO. ___
WHEREAS, the __(Name of the Procuring Entity)__ advertised the Invitation to Apply for
Eligibility and to Bid of the __(Name of the Project)__ in two newspapers of nationwide
general circulation and posted the same in the __(Name of the Procuring Entity)__ website,
the G-EPS and a conspicuous place at the premises of the __(Name of the Procuring Entity)__
continuously for 14 days;
WHEREAS, in response to the said advertisements, __(number of LOIs received)___
contractors submitted letters of intent and applications for eligibility but only __(number of
eligible bidders)__ were found eligible on __(date of Eligibility Check)__ and out of this
number of eligible bidders, __(number of bidders that purchased bid docs)__ purchased bid
documents;
WHEREAS, __(number of bids submitted)__ were submitted on __(date of Bid Opening)__ but
only __(number of bids rated passed)__ passed the preliminary examination of bids;
WHEREAS, the bid proposals of the following bidders were found to be substantially
complying:
Name of Bidder

Bid Amount
(As Read)

% Variance
from ABC

WHEREAS, the detailed evaluation of bids conducted on __(date of Bid Evaluation)__ resulted
in the following:
Name of Bidder

Bid Amount (As


Calculated)

% Variance
from ABC

WHEREAS, upon careful examination, validation and verification of all the eligibility, technical
and financial requirements submitted by the Bidder with the Lowest Calculated Bid, its bid has
been found to be responsive;
NOW, THEREFORE, We, the Members of the Bids and Awards Committee, hereby
RESOLVE as it is hereby RESOLVED:
a)

To declare __(Name of the Bidder with the LCRB)__ as the Bidder with the
Lowest Calculated and Responsive Bid for the __(Name of Project)__;

If the BAC determines that the bidder with the Lowest Calculated Bid passes all the criteria for postqualification, it shall declare the said bidder as the bidder with the Lowest Calculated Responsive Bid, and
the head of the Procuring Entity concerned shall award the contract to the said bidder. (IRR-A Section
34.3) The TWG, with the assistance of the Secretariat, if necessary, shall prepare the BAC Resolution
declaring the LCRB.

Name of the Procuring Entity

b)

Project Reference Number


Name of the Project
Location of the Project

To recommend for approval by the __(position of the head of the Procuring


Entity)__ of the __(Name of the Procuring Entity)__ the foregoing findings.

RESOLVED, at the __(venue of meeting)__ , this ___ day of _________, 20__.

(Name of BAC Chairman)


BAC Chairman

(Name of BAC Member)


BAC Member

(Name of BAC Member)


BAC Member

(Name of BAC Member)


BAC Member

(Name of BAC Member)


BAC Member

(Name of the Head of the Procuring Entity)


Head of Procuring Entity
Approved on __(date of approval)__

If the BAC determines that the bidder with the Lowest Calculated Bid passes all the criteria for postqualification, it shall declare the said bidder as the bidder with the Lowest Calculated Responsive Bid, and
the head of the Procuring Entity concerned shall award the contract to the said bidder. (IRR-A Section
34.3) The TWG, with the assistance of the Secretariat, if necessary, shall prepare the BAC Resolution
declaring the LCRB.