Sie sind auf Seite 1von 2

PMS MDDR FOR

Rev.1
4/3/2012

AQP New 16" Pipelines At NAF Field


sequential number

Deliverable Type

Disc

Proj. Abbrev

Sub-Div

S.N

Sub-Div client

PMS DOCUMENT NUMBER

DOCUMENT TITLE

Rev.

Transmittal No:

Date Submitted to
Client

Comments
Returned

Resubmitted

Approved Date

code

Remarks
GL

MWS

Project M. Document
1

AQP PMS

NAF

PM

SC

0001

Master Schedule

FI

AQP PMS

NAF

PM

PRO

0001

Planning & Follow Up Procedure

FI

AQP PMS

NAF

PM

PRO

0002

Progress Measurement Procedure

AQP PMS

NAF

PM

PRO

0003

Risk Assessment

AQP PMS

NAF

PM

COS

0001

Control sheet

AQP PMS

NAF

PM

OR

0001

Organization Chart

FI
Review
FI
FI

Marine Studies Document

Review
Review

AQP PMS

NAF

ENG

AR

0100

Pipeline Laying Analysis Report

AQP PMS

NAF

ENG

DR

0100

Heads Design Report

10

AQP PMS

NAF

ENG

DR

0200

Sea Fastening Design Report For 16" Line pipes,Spools,Risers

11

AQP PMS

NAF

ENG

PRO

0100

Pipeline Installation Procedure

12

AQP PMS

NAF

ENG

PRO

0200

Spool pieces installation procedure

13

AQP PMS

NAF

ENG

PRO

0300

14

AQP PMS

NAF

ENG

PRO

0400

Anchor Handling Procedure

15

AQP PMS

NAF

ENG

PRO

0500

Risers Transportation Procedure

16

AQP PMS

NAF

ENG

PRO

0600

Pigging & Hydro-testing procedure

19

AQP PMS

NAF

ENG

PRO

0700

Pipes Transportation Procedure

20

AQP PMS

NAF

ENG

AR

0200

Mooring Analysis Report (during laying of 16" pl from NAQ PII & NAQ PIII )

Review

AQP PMS

NAF

ENG

AR

0300

Mooring Analysis Report (during laying of 16" pl from PII to piggable wye installed on the new
NAQ PII / AQ PI )

Review

22

AQP PMS

NAF

ENG

AR

0400

Mooring Analysis Report (during laying of 16" pl from NAQ PII & AQ PI )

Review

23

AQP PMS

NAF

ENG

AR

0500

Mooring Analysis Report (during riser installation from NAQ PII side)

Review

25

AQP PMS

NAF

ENG

AR

0600

Mooring Analysis Report (during riser installation at one end of AQPI )

Review

26

AQP PMS

NAF

ENG

AR

0700

Mooring Analysis Report (during riser installation at one end of NAQ PII )

Review

27

AQP PMS

NAF

ENG

AR

0800

Mooring Analysis Report (during modifications on NAQ PII platform)

Review

28

AQP PMS

NAF

ENG

AR

0900

Mooring Analysis Report (during modifications on AQ PI platform)

21

Ns.Rif.236.2009.FPS

Review
Review
Review
Review
Review
Review

Risers installation procedure

Review
0

T15

Review

3/18/2012

Review

Infill material Application procedure

T16

3/26/2012

FI

QA/QC Document
29

TQ001

TQR no 1 (painting)

T01

1/23/2012

3/1/2012

FI

30

TQ002

TQR no 2 (painting)

T01

1/23/2012

3/1/2012

FI

31

AQP PMS

NAF

QA

PR

007A Proposed Welding Procedures For 16 pipeline (Pipe To Pipe) Plan A

T02

1/24/2012

FI

canceled

32

AQP PMS

NAF

QA

PR

007B Proposed Welding Procedures For 16 pipeline (Pipe To Pipe) Plan B

T02

1/24/2012

FI

canceled

33

AQP PMS

NAF

QA

TQ

001

TQR (Qc)

T03

2/5/2012

34

AQP PMS

NAF

QA

ND

0001

NDT Scope for Pipelines, Spools & Risers

T17

3/27/2012

35

AQP PMS

NAF

QA

PR

0001

Visual Inspection Test Procedure for Pipelines, Spools & Risers

T10

2/26/2012

36

AQP PMS

NAF

QA

PR

0002

Magnetic Inspection Test Procedure for Pipelines, Spools & Risers

T14

2/26/2012

37

AQP PMS

NAF

QA

PR

0003

RADIOGRAPHY SAFETY PROCEDURE

T14

3/13/2012

FI

38

AQP PMS

NAF

QA

PR

0004

Ultrasonic Inspection Test Procedure for Pipelines, Spools & Risers

T17

3/27/2012

FI

Page 1 of 2

2/7/2012

FI
FI

3/13/2012

3/27/2012

FI

3/27/2012

FI

PMS MDDR FOR

Rev.1
4/3/2012

AQP New 16" Pipelines At NAF Field

Disc

Deliverable Type

sequential number

AQP PMS

NAF

QA

PR

0005

Radiographic Inspection Test Procedure for Pipelines, Spools & Risers

T14

2/22/2012

40

AQP PMS

NAF

QA

PR

0006

Consumable Handling Procedure

T17

3/27/2012

41

AQP PMS

NAF

QA

PR

0007

proposed Welding PROCEDUREs for 16" pipeline(pipe to pipe)

T07

2/19/2012

42

AQP PMS

NAF

QA

PR

0008

Field Joint Coating Heat Shrink Sleeve Procedure

T10

2/26/2012

43

AQP PMS

NAF

QA

WL

0001

Approved Welders List For 16" Pipelines, Spools, Riser Clamps and Risers

FI

44

AQP PMS

NAF

QA

ND

0002

NDT Scope for structural works

FI

45

AQP PMS

NAF

QA

PR

0009

Visual Inspection Test Procedure for structural works

FI

46

AQP PMS

NAF

QA

PR

0010

Magnetic Inspection Test Procedure for structural works

FI

47

AQP PMS

NAF

QA

PR

0011

Liquid Penetrant Test Procedure For Structural Works

FI

48

AQP PMS

NAF

QA

PR

0012

Ultrasonic Inspection Test Procedure for structural works

FI

49

AQP PMS

NAF

QA

PR

0013

Consumable Handling Procedure

FI

50

AQP PMS

NAF

QA

PR

0014

touch up painting procedure for structural works

FI

51

AQP PMS

NAF

QA

PR

0015

Welding Procedure for structural works

FI

52

AQP PMS

NAF

QA

WL

0002

Approved Welders List For structural works

53

AQP PMS

NAF

QA

QP

0001

Construction Quality Plan

T11

2/26/2012

54

AQP PMS

NAF

QA

TP

0001

Inspection and Test Plan for 16" Pipelines, Spool Pieces and Risers

T14

3/13/2012

55

AQP PMS

NAF

QA

TP

0002

Inspection and Test Plan for Structural Works

56

AQP PMS

NAF

QA

NP

0001

NDT Personnel For 16" Pipelines, Spool Pieces And Risers

T17

3/27/2012

57

AQP PMS

NAF

QA

NP

0002

NDT Personnel for Structural Works

58

AQP PMS

NAF

QA

PR

0016

Welding PROCEDUREs for 16" pipeline, (pipe to flange)

59

AQP PMS

NAF

QA

PR

0017

Welding PROCEDUREs for 16" pipeline, (pipe to bend)

0001

Pre-Survey Report for 16" pipelines

Sub-Div

39

S.N

Sub-Div client

Proj. Abbrev

PMS DOCUMENT NUMBER

DOCUMENT TITLE

Rev.

Transmittal No:

Date Submitted to
Client

Comments
Returned

Resubmitted

Approved Date

code

Remarks
GL

MWS

FI

3/13/2012

3/27/2012

2/13/2012

3/1/2012

FI

3/1/2012

FI

FI

FI
3/1/2012

FI
FI
FI
FI
FI
FI

T10

2/26/2012

3/1/2012

FI

SURVEY Document
60

AQP PMS

NAF

SUV

61

AQP PMS

NAF

SUV DWG

0001 Anchore Pattern For 16" pipelines

62

AQP PMS

NAF

SUV

MS

0001 SURVEY METHOD STATEMENT

63

AQP PMS

NAF

DIV

MS

0001 Pre-Crossing Concrete Support Installation Method Of Statement

RP

FI
Review
0

T04

Review

2/7/2012

Review

HSE Document
64

AQP PMS

NAF

HSE

HP

0001

HSE Management Plan For Onshore Activities

2/29/2012

3/11/2012

FI

65

AQP PMS

NAF

HSE

HP

0002

HSE Management Plan For offshore Activities

2/29/2012

3/11/2012

FI

66

AQP PMS

NAF

HSE

HP

0003

Emergency response plan

2/29/2012

3/11/2012

FI

Code 1 : Approved
Code 2 : Approved With Comments
Code 3 : Revise and submit
Code 4 : Not Approved
Code 5 : Noted
Page 2 of 2