CALCULATION SHEET
JOB:
TAIPING HEADWORK
PART OF WORK:
GROUP:
M&E
DATE:
1/12/2009
CONTRACT NO.:
MIG
CHECKED BY:
WNWA
ASSISTANT:
FILE:
To determine the air blower size for back washing of the filter.
No of filter to be backwashed at one time
Rate of air scour =
50
60
m3/m2/hr (Min)
m3/m2/hr (Max)
0.35
bar
Filter Length =
Filter Width =
Filter area =
5.5
7.3
40.15
m
m
m2
no
3.5 m
2409 m3/hr
=
2649.9 m3/hr
= 736.0833 l/s
1558.5 cfm
44.17 m3/min
= 2007.5 m3/hr
= 2208.25 m3/hr
= 613.4028 l/s
1298.7 cfm
36.80 m3/min
117.15 m
125.6 m
8.45 m
0.828431 bar
Pressure required min with 20% for losses and static loss
= 1.414118 bar
=
14.4 meter head
Air Blower Selected:
2649.9 m3/hr
14.4
20.5047 psi
meter head
PART OF WORK:
GROUP:
DATE:
1.0
CONTRACT NO.:
18/Mar/15
FILE:
CHECKED BY:
No.
50
m3/m2/hr
(Min)
60
m /m /hr
(Max)
=
=
Filter Area
5.5
7.3
bar
m
m
m
40.15 m2
2.0
= 2409.00 m3/hr
= 2649.9 m3/hr
= 736.0833 l/s
= 2007.50 m3/hr
= 2208.25 m3/hr
= 613.4028 l/s
2649.9 m3/hr
Blower Capacity
C
=
32
= 305.15 K
= 1013.25 milibar abs
3
= 2649.9 m /hr
1.160
kg/m3
0.00
m /s
Suction Pressure
* At operating condition
Discharge Pressure
C
=
71
= 344.15 K
= 1450.00 milibar abs
3
= 1930.48 m /hr
1.472
kg/m3
0.00
m /s
* Static condition
(Refer to the drawings)
Also,
Rw
Qs / Q1
where
Qs
Q1
Suction flow
Motive water flow
Hence,
Qs
Qs
#REF! m3/min
= ### l/s
Q1
#REF! m3/min
= ### l/s
V1
1.0
#REF! mm
.:
Let
Volume ratio
Q1
m/s
Q2
Q1 / n
Q2
#REF! m3/min
V2
1.0
#REF!
and
.:
Let
say
200 mm
3
+ Qs
= ### l/s
m/s
mm
say
150 mm (ID)
(2g (H1-Hs))0.5
m/s
at nozzle
.: Nozzle diameter
0.0
#REF!
m/s
mm
CHECK:
1 N/mm2
1 psi
10m head
1 psi
1 m of head
3.0
=
=
=
=
=
145 psi
0.006897 N/mm2
0.09807 N/mm2
0.703227 m head
1.422015 psi
Ejector Sizing
10.0
12.09 psi
10.0
39.0
m3/hr
11.0
m3/hr
17.0
44.0
m3/hr
m
50.0
2
m3/hr
m, the following
Hence,
4.0
100.0 m3/hr
56.0
m3/hr
Hf
(m)
(m/s)
Length
L
William
(m)
Hazen
Qty
a) Pipe Loss
0.028
0.2
0.89
Fitting Loss:
a) 90 deg bend
b)
c)
4.0
(m3/s)
(m)
(m/s)
0.028
0.2
0.89
90
Length
L
William
(m)
Hazen
90
Qty
#REF! l/s
#REF! l/s
25.10 l/s
0.00
61.5
Inlet pressure =
Let Pump Head =
psi
m
90.36 m3/hr
0.0
Check pipeworks
Length of mains =
Allow for 5% fitting losses =
Flow rate in l/sec =
Flow rate in m3/sec
Pipe diameter
Pipeline velocity
Hazen William C value
Head loss
Total back pressure
=
=
=
=
=
=
30
m
31.5 m
25.10 l/sec
0.0251
200
0.77
110
0.14
8.64
m3/sec
mm
m/sec
m
m
f.i.d=
204 mm
= 12.28451 psi
FAIL!