BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 1
Contents
OVERVIEW................................................................................................................................................. 5
Business Process Description Overview.............................................................................................. 5
3(A): Breakdown Maintenance Internal processing (No external services)................................................8
1. Create Notification............................................................................................................................ 8
2. Assign Notification Assign to responsible person for maintenance..............................................11
3. Re-Assign to responsible person for maintenance.........................................................................15
4. Acknowledge Notification and Put in Process Notification:...........................................................18
5) Decision on Maintenance Order Requirement................................................................................20
6) Create Maintenance Order from Notification..................................................................................21
7. Material Planning Against Order..................................................................................................... 28
9) Check of material availability in storage location............................................................................34
10 A) Change in Material Requirement...............................................................................................44
11) Create Reservation for Return of Material to Store (if material issued is not consumed)..............45
12) Order Confirmation....................................................................................................................... 46
13) Complete Order............................................................................................................................ 50
14) Process Notification...................................................................................................................... 54
15) Process Notification...................................................................................................................... 57
16) Complete Notification................................................................................................................... 59
17) Maintenance Order Settlement..................................................................................................... 64
18) Business Completion of Maintenance Order................................................................................66
3(B): Breakdown Maintenance by Vendor (Warranty/AMC is Available)....................................................68
1. Create Notification.......................................................................................................................... 68
2. Assign Notification Assign to responsible person for maintenance..............................................71
3. Re-Assign to responsible person for maintenance.........................................................................75
4. Acknowledge Notification and Put in Process Notification:...........................................................78
5) Call the Warranty/AMC Vendor:...................................................................................................... 79
5) Decision on Maintenance Order Requirement................................................................................81
6) Create Maintenance Order from Notification..................................................................................82
9) Check of material availability in storage location............................................................................95
10) Change in Material Requirement................................................................................................104
11) Create Reservation for Return of Material to Store (if material issued is not consumed)...........107
12) Order Confirmation..................................................................................................................... 108
13) Complete Order.......................................................................................................................... 111
14) Process Notification.................................................................................................................... 115
15) Process Notification.................................................................................................................... 118
16) Complete Notification................................................................................................................. 120
17) Maintenance Order Settlement................................................................................................... 124
KO88................................................................................................................................................ 124
18) Business Completion of Maintenance Order..............................................................................126
3C: Breakdown Maintenance by Vendor (Need Based Service and APO is available)............................128
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 2
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 3
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 4
OVERVIEW
Page | 5
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 6
13. Entry of consumed quantity of external services in the service entry sheet and
acceptance of service entry sheet. If service level agreement is breached then penalty
is to be imposed as per agreed terms and conditions.
14. Technical Completion (TECO) of order.
15. Month-end settlement of Maint. Order by Accounts department.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 7
Purpose
A defect has occurred and you create a Breakdown Notification. You enter a brief
description of defect, technical object (Functional Location / Equipment) on which defect
has occurred, optionally the detail description in subject long text and task required to
be done.
Trigger
Perform this procedure when there is a need for Manpower and material requirement for
your Breakdown Maintenance Activities
Prerequisites
Technical Object ( Functional Location / Equipment)
Main Work Center
Cost Center
HR Employee List
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 8
Procedure
1. Access the transaction choosing one of the following navigation options:
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 9
SAP Menu
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 10
2.Enter Equipment
code (or)
Func.Location
3. Select
Breakdown
Note :
If known, the equipment no. can directly be entered or equipment can be selected from
Equipment field F4 help by giving proper selection criteria like equipment description,
Plant, plant section, planner group, Main work center etc. in selection option Equipment
by equipment list.
CLICK ON SAVE BUTTON
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 11
Page | 12
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 13
SAP Menu
T Code
User Menu
Click here
to change
the staus
5. Enter Partner
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 14
Select Assigned
and proceed.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 15
1. Status updated to
ASGD
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 16
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 17
New Person
Responsible is
assigned
Click here to
change the
status
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 18
2. Save
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 19
Open the Notification in change mode using any one navigation option shown below
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 20
SAP Menu
T Code
User Menu
2. Click here
to put the
Notification in
process
3. Click to
save the
Notification.
Information flow is triggered to Initiator and all Person Responsible about status
update.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 21
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 22
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 23
2. On the Create Breakdown order: Central Header Data will get copied from the
Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.
If any changes are required it can be done.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 24
3. According to the planning assign the operations which need to be carried out.
The first operation in the operations screen gets copied from the order header as default
by the system as shown below. It can be replaced with some other operation, or if some
similar operations are there in some task list then those operations can also be copied
directly to the order.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 25
1. First operation
get copied from the
order header, it can
be replaced if
required
2. After entering
the operation enter
the no of manpower in
No field and enter the no
of proposed duration in
the
duration field, Based on
these entries system will
calculate the duration
Page | 26
Click
You will get the list of Task lists fulfilling the above selection criteria.
Select your Task list and click
Page | 27
2. Click on this
button or double
click on the task
list group
1. Select
the task list
Now system will ask you weather you want to copy the work center from the task list or
some other work center you want to choose, if you want to change the work center
according to your notification then change it accordingly.
1. Enter your
work center if
required
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 28
2. Click on
all to
copy this
work
center
Now System will ask you weather you want to select all the operations of the task list or
only some selected operations you want to select, choose accordingly.
If you want to select all
the operations then click
on all, otherwise if you
want to select some
selected operations then
select those operations
Page | 29
Enter the material code no if known or select the material from the drop down, and enter
the required quantity as per the requirement. Then press enter; now system will ask you
for which operation you want to assign this material as shown below, either enter the
operation no or click on operation list and select the desired operation.
1. Select the
Operation and
proceed
2. Press after
selection of
operation
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 30
Click on
General
Data
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 31
Reservation
created
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 32
Open the Order in change mode using any one navigation option shown below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 33
SAP Menu
T Code
User Menu
Select
Enhancement
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 34
Select Note
sheet
1.Enter theSAP
ID of the
Approver
2.Enter the
text and
continue
Approver received sap mail, he approved/not approved and sent back
Responsible person receive sap mail &released the maintainance order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 35
Open the order in the change mode using Transaction code IW32 (or) as mentioned in
the earlier steps. Press
1. Release
the order
2. Save the
order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 36
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 37
SAP Menu
T Code
User Menu
2. Execute
1. Enter the Plant /
Storage Location, Etc
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 38
Material Issue against Reservation (if the material is available in storage location)
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 39
9A) Material Issue against Reservation (if the material is available in storage
location) Prerequisites - Reservation no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 40
SAP Menu
T Code
User Menu
Enter Reservation
no and press
ENTER
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 41
Click on Material
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 42
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 43
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 44
2. Click on
reservation tab to
check the details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 45
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 46
1.Click on
Check
2. Click on Post
After Posting the material will be posted and document no will be generated.
9B) if the material is not available in storage location
Please refer MM Script of Material Stock transfer or Material Procurement.
MB21- CREAT RESERVATION UNDER MOVEMENT 913
MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICH
GIVES MATERIAL DOCUMENT NO
MIGO-WITH RESPECT TO MATERIAL DOCUMENT FOR PLACE IN STORAGE
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 47
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 48
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 49
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 50
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 51
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 52
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 53
Number of confirmation is
displayed below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 54
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 55
SAP Menu
T Code
User Menu
Click on Flag
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 56
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 57
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 58
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 59
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 60
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 61
Information flow is triggered to Initiator and all Person Responsible about status
update via Email and SMS.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 62
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 63
If the user status is set as Rework (follow all the Steps from 3 to 15)
User Status Confirmed or Rework is set by Initiator.
Information flow is triggered to all Person Responsible about status update via
Email.
User Status Work Completed is set by Person Responsible.
AFTER USER STATUS CONFIRM BY INITIATOR, RESPONSIBLE PERSON WILL
COMPLETE THE NOTIFICATION i.e. WILL FILL CATALOG/END TIME etc.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 64
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 65
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 66
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 67
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 68
Status is updated to
NOCO. Check the same
and proceed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 69
SAP Menu
T Code
K088
User Menu
Controlling Area
Settlement Period
Fiscal Year
Processing Type
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 70
1. Enter
Controlling are
EXECUTE
TEST RUN OK
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 71
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 72
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 73
Status is updated to
CLSD
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 74
(Warranty/AMC is Available)
Pre-requisite: In case of Breakdown Maintenance by the Vendor through AMC Annual
Maintenance Contract/P.O which is procured through MM procurement are to be
referred
1. Create Notification
Purpose
A defect has occurred and you create a Breakdown Notification. You enter a brief
description of defect, technical object (Functional Location / Equipment) on which defect
has occurred, optionally the detail. description in subject long text and task required to
be done.
Trigger
Perform this pocedure when there is a need for Manpower and material requirement for
your Breakdown Maintenance Activities
Prerequisites
Technical Object ( Functional Location / Equipment)
Main Work Center
Cost Center
HR Employee List
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 75
Procedure
1. Access the transaction choosing one of the following navigation options:
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 76
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 77
2.Enter Equipment
code (or)
Func.Location
3. Select
Breakdown
Note :
If known, the equipment no. can directly be entered or equipment can be selected from
Equipment field F4 help by giving proper selection criteria like equipment description,
plant, plant section, planner group, Main work center etc. in selection option Equipment
by equipment list.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 78
Page | 79
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 80
SAP Menu
T Code
User Menu
Click here
to change
the staus
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 81
Select Assigned
and proceed.
2. Save
1. Status updated to
ASGD
SAVE &
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 82
Information flow is triggered and information is sent to Person Responsible via Email.
On saving a mail is
triggered in SAP system.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 83
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 84
New Person
Responsible is
assigned
Click here to
change the
status
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 85
2. Save
Page | 86
T Code
User Menu
1. Click to
change the staus
tp ACKD
2. Click here
to put the
Notif ication
process
3. Click to
save the
Notif.
Information flow is triggered to Initiator and all Person Responsible about status
update.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 87
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 88
3. Click here to
change the staus to
VEND
1. Enter
Purchasing
Doc. No
2. Communication
Details (Filled to
inform specific
person from
vendor side)
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 89
Select the
status to
VEND
SAVE & Information flow is triggered and information is sent to VENDER VIA MAIL.
Page | 90
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 91
2. On the Create Breakdown order: Central Header Data will get copied from the
Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.
If any changes are required it can be done.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 92
3. According to the planning assign the operations which need to be carried out.
The first operation in the operations screen gets copied from the order header as default
by the system as shown below. It can be replaced with some other operation, or if some
similar operations are there in some task list then those operations can also be copied
directly to the order.
1. First operation
get copied from the
order header, it can
be replaced if
required
2. After entering
the operation enter
the no of manpower in
No field and enter the no
of proposed duration in
the
duration field,Based on
these entries system will
calculate the duration
Page | 93
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 94
Click
You will get the list of Task lists fulfilling the above selection criteria.
Select your Task list and click
Page | 95
2. Click on this
button or double
click on the task
list group
1. Select
the task list
Now system will ask you weather you want to copy the work center from the task list or
some other work center you want to choose, if you want to change the work center
according to your notification then change it accordingly.
1. Enter your
work center if
required
2. Click on
all to
copy this
work
center
Now System will ask you weather you want to select all the operations of the task list or
only some selected operations you want to select, choose accordingly.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 96
Enter the material code no if known or select the material from the drop down, and enter
the required quantity as per the requirement. Then press enter; now system will ask you
for which operation you want to assign this material as shown below, either enter the
operation no or click on operation list and select the desired operation.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 97
Click on
General
Data
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 98
Reservation
created
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 99
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 100
SAP Menu
T Code
User Menu
Select
Enhancement
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 101
Select
Notesheet
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 102
1.Enter theSAP
ID of the
Approver
2.Enter the
text and
continue
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 103
SAP Menu
T Code
User Menu
Open the order in the change mode using any one navigation option shown below
Press
2. Save the
order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 104
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 105
SAP Menu
T Code
User Menu
2. Execute
1. Enter the Plant /
Storage Location, Etc
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 106
Material Issue against Reservation (if the material is available in storage location)
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 107
9A) Material Issue against Reservation (if the material is available in storage location)
Prerequisites - Reservation no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 108
SAP Menu
T Code
User Menu
Enter Reservation
no and press
ENTER
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 109
Click on Material
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 110
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 111
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 112
2. Click on
reservation tab to
check the details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 113
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 114
1.Click on
Check
2. Click on Post
After Posting the material will be posted and document no will be generated.
Page | 115
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 116
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 117
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 118
Select
Enhancement Tab
Select
Notesheet
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 119
1.Enter theSAP
ID of the
Approver
2.Enter the
text and
continue
SAVE& MAIL IS SENT TO APPROVER. HE WILL APPROVE/NOT APPROVE &SENT
BACK
10B) Material Requirement change
10C) Material Issue against Reservation
11) Create Reservation for Return of Material to Store (if material issued is not
consumed)
Please refer steps 10 to 10C. The quantity in the case of return will be negative.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 120
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 121
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 122
Number of confirmation is
displayed below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 123
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 124
SAP Menu
T Code
User Menu
Click on Flag
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 125
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 126
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 127
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 128
2. Click to
change the
user status
1. Maintain
Vendor Docket
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 129
Set the
status to
CNFR
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 130
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 131
If the user status is set as Rework (follow all the Steps from 3 to 15)
User Status Confirmed or Rework is set by Initiator.
Information flow is triggered to all Person Responsible about status update via
Email.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 132
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 133
Fiiup the all catalog data Object Parts & Damage / Causes / Activities etc.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 134
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 135
Status is updated to
NOCO. Check the same
and proceed
IW32
Maintenance order TECO
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 136
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 137
SAP Menu
T Code
User Menu
KO88
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 138
1. Enter
Controlling are
Page | 139
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 140
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 141
Status is updated to
CLSD
19) PO Process
20) Service Entry Sheet
21) Accounting entry verification
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 142
1. Create Notification
Purpose
A defect has occurred and you create a Breakdown Notification. You enter a brief
description of defect,
technical object (Functional Location / Equipment) on which defect has occurred,
optionally the detail
description in subject long text and task required to be done.
Trigger
Perform this procedure when there is a need for Manpower and material requirement for
your Breakdown
Maintenance Activities
Prerequisites
Technical Object ( Functional Location / Equipment)
Main Work Center
Cost Center
HR Employee List
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 143
Procedure
1. Access the transaction choosing one of the following navigation options:
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 144
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 145
2.Enter Equipment
code (or)
Func.Location
3. Select
Breakdown
Note :
If known, the equipment no. can directly be entered or equipment can be selected from
Equipment field F4 help by giving proper selection criteria like equipment description,
plant, plant section, planner group, Main work center etc. in selection option Equipment
by equipment list.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 146
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 147
SAP Menu
T Code
User Menu
5. Enter Partner
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 148
Click here
to change
the staus
Select Assigned
and proceed.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 149
2. Save
1. Status updated to
ASGD
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 150
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 151
New Person
Responsible is
assigned
Click here to
change the
status
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 152
2. Save
Page | 153
SAP Menu
T Code
User Menu
Note:
User Status ACKD is set by Person Responsible.
Notification is Put in Process by Person Responsible.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 154
1. Click to
change the staus
tp ACKD
2. Click here
to put the
Notif ication
process
3. Click to
save the
Notif.
Information flow is triggered to Initiator and all Person Responsible about status
update.
5) Decision on Maintenance Order Requirement
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 155
Click here to
create an order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 156
2. On the Create Breakdown order: Central Header Data will get copied from the
Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.
If any changes are required it can be done.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 157
3. According to the planning assign the operations which need to be carried out.
The first operation in the operations screen gets copied from the order header as default
by the system as shown below. It can be replaced with some other operation, or if some
similar operations are there in some task list then those operations can also be copied
directly to the order.
1. First operation
get copied from the
order header, it can
be replaced if
required
2. After entering
the operation enter
the no of manpower in
No field and enter the no
of proposed duration in
the
duration field,Based on
these entries system will
calculate the duration
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 158
Click
You will get the list of Task lists fulfilling the above selection criteria.
Select your Task list and click
Page | 159
2. Click on this
button or double
click on the task
list group
1. Select
the task list
Now system will ask you weather you want to copy the work center from the task list or
some other work center you want to choose, if you want to change the work center
according to your notification then change it accordingly.
1. Enter your
work center if
required
2. Click on
all to
copy this
work
center
Now System will ask you weather you want to select all the operations of the task list or
only some selected operations you want to select, choose accordingly.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 160
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 161
Enter the material code no if known or select the material from the drop down, and enter
the required quantity as per the requirement. Then press enter; now system will ask you
for which operation you want to assign this material as shown below, either enter the
operation no or click on operation list and select the desired operation.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 162
Click on
General
Data
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 163
Reservation
created
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 164
Select
operation Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 165
2. Click
External
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 166
Select the
control key
PM03
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 167
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 168
After pressing the Continue check button , following message will get displayed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 169
Select the Operation with ( PM03 ) contol key , and Go to EXTERNAL button.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 170
Select
EXTERNAL
BUTTON
Then select the Services available in the APO , from service selection button at
the bottom.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 171
Select Service
Selection
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 172
Select For
Adopt services
from APO
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 173
Select For
Entering the
cost centre
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 174
Continue for
service selection
Cost for the service will appear in the service , is PICKED from APO.
On saving the order a message will be displayed .
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 175
Open the Order in change mode using any one navigation shown below
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 176
SAP Menu
T Code
User Menu
Select
Enhancement
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 177
Select
Notesheet
1.Enter theSAP
ID of the
Approver
2.Enter the
text and
continue
APPROVER RECEIVED SAP MAIL.HE APPROVE/ NOTAPPROVE & SENT BACK
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 178
Open the order in the change mode using Transaction code IW32 (or) as mentioned in
the earlier steps. Press
1. Release
the order
2. Save the
order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 179
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 180
SAP Menu
T Code
User Menu
2. Execute
1. Enter the Plant /
Storage Location, Etc
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 181
Material Issue against Reservation (if the material is available in storage location)
9A) Material Issue against Reservation (if the material is available in storage
location)
Prerequisites - Reservation no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 182
SAP Menu
T Code
User Menu
Enter Reservation
no and press
ENTER
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 183
Click on Material
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 184
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 185
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 186
2. Click on
reservation tab to
check the details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 187
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 188
1.Click on
Check
2. Click on Post
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 189
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 190
SAP Menu
T Code
User Menu
Open the order in change mode using any navigation option shown below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 191
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 192
Select
Enhancement
Tab
Select
Notesheet
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 193
Open the order in change mode using any one navigation option shown below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 194
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 195
Purchase.
Requisition no can
be viewed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 196
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 197
SAP Menu
T Code
/n
Go to SAP Business
Workplace
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 198
SAP Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 199
T Code
ME21N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 200
2. Execute
1. Enter the
Purchase req. no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 201
PO CREATED
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 202
SAP Menu
T Code
ME22N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 203
Eneter the
relevant
Purch.Order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 204
Change the Description (or) details you want to change and Save.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 205
SAP Menu
T Code
ME23N - Display
User Menu
Click here to
enter the Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 206
Enter the
Purchase order
no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 207
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 208
SAP Menu
T Code
12E) Print PO
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 209
SAP Menu
T Code
User Menu
2. Execute
1. Enter the
Purchase Order no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 210
Select the no of
copies req.
Click Trial
Print Out
Press
here
Work Order is printed. Please click the icon to view the format.
2.xps
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 211
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 212
SAP Menu
T Code
User Menu
This step is optional. Follow the steps in case down payment is requested.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 213
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 214
Open the notification in change mode using any one of the Navigation option.
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 215
Click here to
change the status
to vend
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 216
Service vendor details will be updated . Information to Vendor is sent to Vendors Email
ID thru SAP as per the details maintained in Vendor Docket Screen.
Open the Order in change mode using any one navigation option below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 217
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 218
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 219
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 220
Number of confirmation is
displayed below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 221
Open the order in change mode using any navigation option shown below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 222
SAP Menu
T Code
User Menu
Click on Flag
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 223
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 224
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 225
Open the notification on change mode and set user status as Work Completed in
Notification
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 226
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 227
2. Click to
change the
user status
1. Maintain
Vendor Docket
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 228
Set the
status to
COMP
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 229
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 230
If the user status is set as rework (follow all the Steps from 3 to 15)
User Status Confirmed or Rework is set by Initiator.
Information flow is triggered to all Person Responsible about status update via
Email.
Open the Notification in the change mode using transaction code IW22 or from the SAP
menu as mentioned in the earlier steps.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 231
Fiiup the all catalog data Object Parts & Damage / Causes / Activities etc.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 232
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 233
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 234
Status is updated to
NOCO. Check the same
and proceed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 235
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 236
SAP Menu
T Code
ML81N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 237
Enter Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 238
Press
create.
2. Save
1. Enter the
service details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 239
Creation of Service
Entry Sheet triggers a
auto generated mail
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 240
23B) Release Service entry sheet Initiate SES release for next level.
Prerequisites
Service Entry Sheet no.
Use any one of the navigation mode to release the Service Entry Sheet.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 241
SAP Menu
T Code
ML81N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 242
2. Execute
1. Enter the
service Entry
Sheet no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 243
1.Select the
Relevant Doc.
3. Save
2. Release
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 244
2. Execute
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 245
3. Save
2. Release
1. Select the
Relevant Doc.
On saving, the following document is displayed.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 246
T Code
K088
User Menu
1. Enter
Controlling area
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 247
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 248
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 249
Status is updated to
CLSD
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 250
SAP Menu
T Code
ML81N
User Menu
Click here to
enter Service
sheet no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 251
Page | 252
SAP Menu
T Code
ML83
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 253
3. Execute
1. Enter Entry
sheet no
2. Enter
Purchase
order no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 254
2. Select
Trial Print
Out
1. Select the
relevant field
Select Print
The Doc. Gets printed. Printed copy can be viewed by clicking the icon.
3.xps
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 255
T Code
MIRO
User Menu
3. Enter Date
2. Enter Ref
no
1. Enter Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 256
SAP Menu
T Code
User Menu
Enter Amount
Select Invoice
Page | 257
SAP Menu
T Code
User Menu
3. Enter Date
2. Enter Ref
no
1. Enter Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 258
Purpose
A defect has occurred and you create a Breakdown Notification. You enter a brief
description of defect, technical object (Functional Location / Equipment) on which defect
has occurred, optionally the detail description in subject long text and task required to
be done.
Trigger
Perform this procedure when there is a need for Manpower and material requirement for
your Breakdown Maintenance Activities
Prerequisites
Technical Object ( Functional Location / Equipment)
Main Work Center
Cost Center
HR Employee List
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 259
Procedure
1. Access the transaction choosing one of the following navigation options:
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 260
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 261
2.Enter Equipment
code (or)
Func.Location
3. Select
Breakdown
Note :
If known, the equipment no. can directly be entered or equipment can be selected from
Equipment field F4 help by giving proper selection criteria like equipment description,
plant, plant section, planner group, Main work center etc. in selection option Equipment
by equipment list.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 262
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 263
SAP Menu
T Code
User Menu
5. Enter Partner
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 264
Click here
to change
the staus
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 265
Select Assigned
and proceed.
2. Save
1. Status updated to
ASGD
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 266
On saving a mail is
triggered in SAP system.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 267
New Person
Responsible is
assigned
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 268
Click here to
change the
status
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 269
2. Save
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 270
Note:
User Status ACKD is set by Person Responsible.
Notification is Put in Process by Person Responsible.
1. Click to
change the staus
tp ACKD
2. Click here
to put the
Notif ication
process
3. Click to
save the
Notif.
Information flow is triggered to Initiator and all Person Responsible about status
update.
Page | 271
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 272
Click here to
create an order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 273
2. On the Create Breakdown order: Central Header Data will get copied from the
Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.
If any changes are required it can be done.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 274
3. According to the planning assign the operations which need to be carried out.
The first operation in the operations screen gets copied from the order header as default
by the system as shown below. It can be replaced with some other operation, or if some
similar operations are there in some task list then those operations can also be copied
directly to the order.
1. First operation
get copied from the
order header, it can
be replaced if
required
2. After entering
the operation enter
the no of manpower in
No field and enter the no
of proposed duration in
the
duration field,Based on
these entries system will
calculate the duration
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 275
Click
You will get the list of Task lists fulfilling the above selection criteria.
Select your Task list and click
Page | 276
2. Click on this
button or double
click on the task
list group
1. Select
the task list
Now system will ask you weather you want to copy the work center from the task list or
some other work center you want to choose, if you want to change the work center
according to your notification then change it accordingly.
1. Enter your
work center if
required
2. Click on
all to
copy this
work
center
Now System will ask you weather you want to select all the operations of the task list or
only some selected operations you want to select, choose accordingly.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 277
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 278
Enter the material code no if known or select the material from the drop down, and enter
the required quantity as per the requirement. Then press enter; now system will ask you
for which operation you want to assign this material as shown below, either enter the
operation no or click on operation list and select the desired operation.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 279
Click on
General
Data
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 280
Reservation
created
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 281
Select
operation Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 282
2. Click
External
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 283
Select the
control key
PM03
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 284
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 285
Open the Order in change mode using any one navigation shown below
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 286
SAP Menu
T Code
User Menu
Select
Enhancement
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 287
Select
Notesheet
1.Enter theSAP
ID of the
Approver
2.Enter the
text and
continue
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 288
Open the order in the change mode using any one navigation option shown below
Press
2. Save the
order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 289
SAP Menu
T Code
User Menu
2. Execute
1. Enter the Plant /
Storage Location, Etc
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 290
Material Issue against Reservation (if the material is available in storage location)
9A) Material Issue against Reservation (if the material is available in storage
location)
Prerequisites - Reservation no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 291
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 292
SAP Menu
T Code
User Menu
Enter Reservation
no and press
ENTER
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 293
Click on Material
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 294
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 295
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 296
2. Click on
reservation tab to
check the details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 297
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 298
1.Click on
Check
2. Click on Post
After Posting the material will be posted and document no will be generated.
9B) If the material is not available in storage location
Please refer MM Script of Material Stock transfer or Material Procurement.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 299
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 300
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 301
SAP Menu
T Code
User Menu
Select
Enhancement
Tab
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 302
Select
Notesheet
1. Enter the
SAP ID of the
Approver
2. Enter the
text and
continue
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 303
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 304
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 305
Purchase.
Requisition no can
be viewed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 306
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 307
SAP Menu
T Code
/n
Go to SAP Business
Workplace
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 308
T Code
ME21N
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 309
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 310
2. Execute
1. Enter the
Purchase req. no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 311
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 312
SAP Menu
T Code
ME22N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 313
Eneter the
relevant
Purch.Order
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 314
Change the Description (or) details you want to change and Save.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 315
SAP Menu
T Code
ME23N - Display
User Menu
Click here to
enter the Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 316
Enter the
Purchase order
no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 317
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 318
SAP Menu
T Code
ME29N
User Menu
13E) Print PO
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 319
SAP Menu
T Code
User Menu
2. Execute
1. Enter the
Purchase Order no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 320
Select the no of
copies req.
Click Trial
Print Out
Press
here
Work Order is printed. Plz click the icon to view the format.
2.xps
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 321
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 322
SAP Menu
T Code
User Menu
This step is optional. Follow the steps in case down payment is requested.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 323
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 324
Open the notification in change mode using any one of the Navigation option.
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 325
Click here to
change the status
to vend
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 326
Service vendor details will be updated . Information to Vendor is sent to Vendors Email
ID thru SAP as per the details maintained in Vendor Docket Screen.
Open the Order in change mode using any one navigation option below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 327
SAP Menu
T Code
User Menu
Select
Operations
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 328
Maintain new
Operation with
Control Key
PM03.
operation and
click on
External.
1. Select the
Operation
2. Select External
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 329
Maintain APO no
and continue
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 330
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 331
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 332
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 333
Number of confirmation is
displayed below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 334
Open the order in change mode using any navigation option shown below.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 335
SAP Menu
T Code
User Menu
Click on Flag
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 336
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 337
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 338
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 339
Open the notification on change mode and set user status as Work Completed in
Notification
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 340
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 341
2. Click to
change the
user status
1. Maintain
Vendor Docket
Details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 342
Set the
status to
COMP
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 343
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 344
If the user status is set as rework (follow all the Steps from 3 to 15)
User Status Confirmed or Rework is set by Initiator.
Information flow is triggered to all Person Responsible about status update via
Email.
Open the Notification in the change mode using transaction code IW22 or from the SAP
menu as mentioned in the earlier steps.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 345
Fiiup the all catalog data Object Parts & Damage / Causes / Activities etc.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 346
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 347
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 348
Status is updated to
NOCO. Check the same
and proceed
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 349
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 350
SAP Menu
T Code
ML81N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 351
Enter Purchase
order no.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 352
Press
create.
2. Save
1. Enter the
service details
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 353
Creation of Service
Entry Sheet triggers a
auto generated mail
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 354
24B) Release Service entry sheet Initiate SES release for next level.
Prerequisites
Service Entry Sheet no.
Use any one of the navigation mode to release the Service Entry Sheet.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 355
SAP Menu
T Code
ML81N
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 356
2. Execute
1. Enter the
service Entry
Sheet no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 357
1.Select the
Relevant Doc.
3. Save
2. Release
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 358
2. Execute
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 359
3. Save
2. Release
1. Select the
Relevant Doc.
On saving, the following document is displayed.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 360
T Code
K088
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 361
1. Enter
Controlling area
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 362
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 363
Status is updated to
CLSD
Prerequisite
Service Entry Sheet no
Use any one of the Navigation option
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 364
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 365
SAP Menu
T Code
ML81N
User Menu
Click here to
enter Service
sheet no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 366
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 367
SAP Menu
T Code
ML83
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 368
3. Execute
1. Enter Entry
sheet no
2. Enter
Purchase
order no
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 369
2. Select
Trial Print
Out
1. Select the
relevant field
Select Print
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 370
The Doc. Gets printed. Printed copy can be viewed by clicking the icon.
3.xps
T Code
MIRO
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 371
3. Enter Date
2. Enter Ref
no
1. Enter Purchase
order no.
SAP Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 372
T Code
User Menu
Enter Amount
Select Invoice
SAP Menu
T Code
User Menu
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 373
3. Enter Date
2. Enter Ref
no
1. Enter Purchase
order no.
Note : In the Breakdown Maintenance process, there are processes related to other Modules
like FICO / MM. These processes are explained only in brief. For more details /
informations, respective module manuals to be referred.
For example: - Following are explained only in brief. Pl. refer the respective modules.
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 374
Note : For PO, RFQ, Contract, SES creation please refer MM User Manuals
BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0
Page | 375