Sie sind auf Seite 1von 3

M.P.POORVA KSHTRA VIDYUT VITARAN CO. LTD.

NO. EE/STC/BILL

BINA, DATED

To,
M/S DINESH KUMAR PARASHAR
SUB
CONSTRUCTION OF 11 KV/ LT LINE THROUGH LAVOUR CONTRACT
REF
LITTER FROM A.E. STC BINA DATED
Dear Sir,
With reference to above, we have pleasre in awarding a labour contract to your for the following works at the rate
mentioned agaist each construction acitivities on the terms and condition indicated in enclosed annexure.

(I) 11 kv LINE 0.16 Km (ii) 0.9 Km


(ii) LT Line 0.03 Km
(ii) 0.00 Km
(iii) S/S 1X25 Kva (ii) 1X25 Kva
(i) Name of Work Estt for PS to 1x3 Hp Pump connection at village Kokalwara Under Khurai RDC
(ii) Name of Work Estt for PS to 2x6 Hp Pump connection at village BAGHORA Under Khurai RDC
(i) Estt No. and dt 78-168-5542-14-458 Date 21.10.2014
(ii) Estt No. and dt 78-168-5542-14-461 Date 25.10.2014
(i) Work Order No. and Date 467 1.11.2014 (STC) 696 Dt. 11.11.2014
(ii) Work Order No. and Date 470 1.11.2014 (STC) 699 Dt. 11.11.2014
(i) Amount Rs. 139110.00 (ii) Rs. 290303.00 Employee Name _ RAJKUMAR NAMDEO LH

S.No.

Particulars of Works ot be carried

Unit

Rate

Qty 1

Grand
Amount Qmount
Total
1
2
Amount

Qty 2

1 Pole pit digging for P.C.c. Pole/ R.S. Joint


(a) Normal Soil

Per pit

126

504

1008

1512

(b) Hard soil

Per pit

303

606

1818

2424

2 Transportation of P.C.C. Pole


(a) 0 to 1 Km

Pe pole

91

14

546

1274

1820

(b) to Km @21/- Per km

Pe pole

42

14

252

588

840

Transporation of RS Joist

Per Pole

79

3 Stay pit digging (4x2x3x2)


(A) Normal Soil

Per Stay

96

192

192

384

(b) Soft Rock

Per Stay

152

456

608

1064

4 Stay errection complete with binding of stay

Per Stay

(a) Labour charge for stay errection

Per Stay

107

535

642

1177

(b) Cost of stay concreting (0.2 cmt)

Per Stay

788

3940

4728

8668

Labour charge for stay concreting

Per Stay

63

315

378

693

5 Pole errection including earthing and back filling with boulder Per Loc

406

14

2436

5684

8120

6 Errection of 175x85 mm R.S. Joist

Per Pole

312

6 Concerting of PCC Pole @ 3 cmt per clamp

Per Loc

1181

Per Loc

105

7 Fixing of 11 Ky VX Arms with top clmap

Per Loc

42

12

126

504

630

8 fixing of LT x arm/ though bolt u clmap with insulator

Per Loc

35

70

70

9 11 KV pin insulator fixin with G.I. Pin

No.

36

81

324

405

Per Km

1816

0.48

Pe Km

3631

0.03

Per Spa

781

Labour charges for conreting

10 (a) Striging of rabbit conductor complete


(b) Striging of L.T. Line with 6 sq 4 mm PVC cable
11 Carpet guarding with lacing in 11 Kv line

2.7 871.68 4903.2 5774.88


0 108.93

108.93

DC X arm fixing along with strainplates and no. dics


12 insulators complete

Per set

387

774

774

1548

13 Fixing of lightening arrestors

Set of

107

107

107

214

14 Fixing of D.O. Set including channel

Set of

107

107

107

214

Fixing of x mer mounting stracture complete with supporting


15 clamp and trun buckle

Per set

312

312

312

624

16 Earthing of sub station


(a) Diggingfor eath pit

Per pit

(i) Normal

Per pit

138

(ii) Hard Soil

Per pit

343

1029

1029

2058

(b) Laying of earth pipe connection of earth wire from


supports

per pole

35

105

105

210

Labor charge for back filling by salt charcoal and


excabated earth

Per set

35

105

105

210

(e) Cost of 10 kg salt

Per set

44

132

132

264

(f) cost of 5 kg charcoal

Per set

107

321

321

642

Per Pole

1969

3938

3938

7876

Per pit

172

344

344

688

18 Survey for 11 KV/ Lt line

Per Km

932

19 Base padding of pole 0.05 cmt

Per Loc

197

20 Labor chage for base padding

Per Loc

16

478

478

478

956

242

242

242

484

17 (a) Concreting for transformer DP @ 0.5 cmt/ pole


(b) Labor charge for concreting

21 Handling and installation of dist X mer


25kva

No.

22 Handing and installation of distt. Baxes


(a) 25 kva

No.

Total

19034

30645 49678.8

RUPEES FOURTY NINE THOUSAND SIX HUNDRED SEVENTY NINE ONLY

Each construction activity shall be performed in Norten and as specification laid in enclosed annexurs and
layout all other terms and conditions by which is this contact be government has been indicated in annexure
II specimen copies of agreement frorm is also enclosed here with which shall be executed on non judicial
stamp paper of Rs. Hundred i.e. submitted to this office through A.E. STC sagar concern duly signed by you
and your withess before commencement of work in respect of awards billing more than 5000/- balance
security deposit of 2.5% of the value of award shall be deduced from contractor in first bill this shall be
encovered by AE STC SAgar
The rates fixed as per CMD/ EZ jablapur vide CMD/EZ/WS 6507 dated 24/7/2012 As above 4 No.

JE ( STC)
M.P.P.K.V.V.Co.Ltd. Sagar

AE ( STC)
M.P.P.K.V.V.Co.Ltd. Sagar

EE ( STC)
M.P.P.K.V.V.Co
.Ltd. Sagar

No./ EE/ STC Bill


Copy
1 The senior Accounts Officer M.P.K.V.V. Co. Ltd. Sagar
2 The assistant Engineer STC, M.P.P.K.V.V. Co. Ltd
3 Bill Section (Work section) STC Dn. Sagar

EE ( STC)
M.P.P.K.V.V.Co
.Ltd. Sagar

EE ( STC)
M.P.P.K.V.V.Co
.Ltd. Sagar

Das könnte Ihnen auch gefallen