Beruflich Dokumente
Kultur Dokumente
CONSULTANT
CONTRACTOR
Sampling Date:-01/09/2013
11295.0
SIEVE
(inch")
SIEVE
(mm)
75
63
50
Retained Wt.
Individual
Retained Wt.
Cumilative
Retained
Passing
(g)
(g)
0.00
0.00
0.0
100
37.5
2119.80
2119.80
18.8
81
28
1087.10
3206.90
28.4
72
3/4
19
661.20
3868.10
34.2
66
1/2
14
3/8
10
831.90
4700.00
41.6
58
1/4
6.3
No.4
1049.80
5749.80
50.9
49
No.8
2.36
877.40
6627.20
58.7
41
No.10
No.16
1.18
809.50
7436.70
65.8
34
No.20
850 um
414.70
7851.40
69.5
30
No.30
600 um
No.40
425 um
754.30
8605.70
76.2
24
No.50
300 um
No.100
150 um
666.60
9272.30
82.1
18
No.200
75 um
No.400
63um
591.10
9863.40
87.3
13
1431.60
11295.00
100.0
PAN
CONTRACTOR
CONSULTANT
Laboratory Technician
Material Inspector
Materials Engineer
Materials Engineer
CLIENT
CONSULTANT
CONTRACTOR
Testing
Date:-04/09/2013
% Water Content
Can Number
Weight of Wet Soil + Can
Weight of Dry Soil + Can
Weight of Water
Weight of Can
Weight of Dry Soil
Water Content
Number of Blows
L.L
22.00
1
S3
46.44
43.57
2.87
30.10
13.47
21.31
36
P.L 20.00
2
S4
47.52
44.68
2.84
32.00
12.68
22.40
24
3
S5
46.11
42.91
3.20
29.40
13.51
23.69
15
P.I 2.00
Liquid limit
24.00
23.50
23.00
22.50
22.00
21.50
21.00
20.50
20.00
10
20
25
30
40
No. of blow s
50
60
Natural
Water
Content
Can Number
Weight of Wet Soil + Can
Weight of Dry Soil + Can
Weight of Water
Weight of Can
Weight of Dry Soil
Water Content
Plastic Limit
S7
S8
35.12
32.64
34.61
32.09
0.51
0.55
32.00
29.30
2.61
2.79
19.54
19.71
19.63
CONTRACTOR
CONSULTANT
Laboratory Technician
Material Inspector
Materials Engineer
Materials Engineer
Materials Engineer
Materials Engineer
Embankment Material
Wadi Al Bia
Stock Pile @ 26+180
BS 1377 P4 CL 3.6.4.1
BS 1377 P4 CL 3.2.5.3
NIL
1
Wet Density
gr.
Volume of Mold
cc.
10425
10705
10610
4057
4467
4747
4652
2113
Mg/m.
1.92
B2
B9
B11
B7
662.1
686.2
704.3
632.1
636.5
647.7
653.6
579.4
gr.
2.11
2.25
2.20
25.6
38.5
50.7
52.7
Weight of Can
gr.
103.6
90.7
91.0
90.7
gr.
532.9
557
562.6
488.7
4.80
6.91
9.01
10.8
Mg/m.
1.83
1.98
2.06
1.99
Dry Density
M.D.D
2.06 Mg/m
O.M.C.
9.0 %
D R Y D E N S IT Y M g /m 3
Weight of Water
Water Content
3.00
REMARKS:
1/9/2013
4/9/2013
EMB-05
5
62
5958
Can No.
Moisture Content
10015
4.00
5.00
6.00
7.00
8.00
9.00
10.00
MOISTURE CONTENT %
11.00
12.00
13.00
14.00
ME/Contractor
MI/Consultant
ME/Consultant
SHIP
oad
1/9/2013
4/9/2013
EMB-05
5
62
12.00
13.00
14.00
ME/Consultant
CLIENT
CONSULTANT
CONTRACTOR
Materials Source :-
Wadi Al Bia
2.06
OMC:
soaking: 96 Hrs.
Factor:
9.0
0.0575
4915
kN
Moisture Determination
B
Sample
Top
Bottom
D7
D8
Mass of Soil+Mould
10460
Can No
Mass of Mould
5548
634.5
688.9
Mass of Soil
4912
584.5
630.1
cc
2304
Mass of Water
50.0
58.8
Mg/m
2.13
Mass of Can
121.8
123.0
Mg/m
1.96
462.7
507.1
95
Moisture Content
10.8
11.6
Volume of Mould
Compaction
PenetrationTest Data
Top
Bottom
Penetration
in mm
Dial Reading
Load
KN
0.5
CBR
%
Penetration
in mm
Dial Reading
Load KN
11.00
0.6
0.5
17.00
1.0
23.00
1.3
32.00
1.8
1.5
34.00
2.0
1.5
48.00
2.8
44.00
2.5
61.00
3.5
2.5
53.00
3.0
2.5
72.00
4.1
61.00
3.5
83.00
4.8
3.5
68.00
3.9
3.5
92.00
5.3
74.00
4.3
100.00
5.8
4.5
80.00
4.6
4.5
106.00
6.1
85.00
4.9
110.00
6.3
5.5
91.00
5.2
5.5
115.00
6.6
95.00
5.5
119.00
6.8
23
24
= 9562.4 g
= 26.5
CBR
%
31
32
ME/Contractor
MI/Consultant
ME/Consultant
R e s is ta nc e to P e ne tra tio n K N
8
7
6
5
4
3
2
1
0
Top
Bottom
Top
Bottom
CBR % at 2.5mm
23
31
CBR % at 5.0mm
24
32
Swell (%)
.02
32%
Remarks:-
ME/Contractor
MI/Consultant
ME/Consultant