Monthly PM
Surveillance Monitoring and Visual Inspection
Quarterly PM
Annual PM
Conduct visual inspection
Review wiring diagrams and Check that the redundant Incoming power supplies.
System Power quality check
Measure and register the system power supplies:
Voltage
AC ripple' content
Check for loss of redundancy where redundant components are provided,
Check for loss of output voltage on both system power supply in redundant pair.
Check each system power supply by visually inspecting if the cooling fans are working.
Also inspect status LED if available.
Tighten connection
Using Wiring Diagram, check for loose wire connections, Plugs, Sockets, etc.
Tighten all loose wires, cables, plugs, Sockets, etc.
Using Wiring Diagram, check for instrumentation cabling, including shields, terminated
within the ESSDS system panel.
Check for loose system module connection.
Tighten all loose System modules
Grounding checks
Verify that the ground connection within the ESSDS system/marshalling panel is
correctly connected to the appropriate grounding systems.
Verify that the DC returns (negative strapped to ground) is not floating.
Check that all connection to the AC ground bars and DC ground bar are tightly secured.
Verify that ground (earth), bonding and other connections are secured and free of
damage and corrosion. Record and report any unsecured and seriously corroded
connection.
Function testing
Software maintenance
Program backup
Identification of Forced Signals
Backup of HMI Hard Drive Image and Configuration Laptop Hard Drive Image.
Verify hard drive capacity/remove temporary and old irrelevant files
Close out the maintenance task
Prior to closeout, remove all tools, extra parts, and loose materials from the work area.
If the ESSDS System was shut down and locked out, remove the locks and tags and
then restore power to the unit, according to Lock-out/Tag-out guidelines.
Notify the Control Room Operator that maintenance is complete and the ESSDS System
is ready for service.
Verify that the ESSDS System is in service and that all associated emergency shutdown
initiators and the forced inputs/outputs are according with the actual operating
conditions.
Remove the temporary bypass from the safety system, as applicable
Close out the permits.
Update the records:
Review, update, and file the JSA.