Established : 2004
Capital : RM 1 million/350,000 USD
Employees : 7
Managing Director : Tharmarajah
Ramasamy
Stage 1
Stage 3
↓
Check diameter and No Good Reject
Shave to required diameter & → inspect roller for →
polishing of the bearing particles & bubbles Good
Send to CNC – final shaving
and surfacing
↓
→ →
Packaging Store Shipment and Delivery
REGROOVE MAIN ROLLER PROCESSING TIME
Total : 1 working day ( Subject to max. 3 sets per day )
2nd Process
Received Material 1st Process QC /
OD & Side cutting + Ready for Delivery
from Customer ID & Side cutting Packaging
Pitch
1 day 1 day
GUIDE ROLLER
PROCESS FLOW
CNC 1st side machining – I.D. & side shaving and surfacing
Check the I.D by using guide roller bearing
1) Using a lift to
unload the roller from
CNC machine
QC Process
continued
2) The roller is
transported to the
QC room for
inspection.
QC Process
continued
3) Contour graph
machine is calibrated
for roller inspection
QC Process
continued
4) Front point
inspection
QC Process
continued
5) Centre point
inspection
QC Control
continued
6) Rear point
inspection
QC Process
continued
7) All the data
accumulated from
the rollers inspection
is displayed to the
computer and
printed for inclusion
with the work when
it is returned to the
customer.
QC Process
continued
Checking of the
bearing taper
Bearing Taper
Repair