Beruflich Dokumente
Kultur Dokumente
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 1 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 1
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
L
4m
20 kN
6m
D
G
6m
4m
J
4m
Fig. A
Top storey:
(i)
Column Shears:
Shear in columns of the top storey is obtained by considering the free body
diagram shown in Fig. A .1
Hinge
15 kN
L
2m
V1
Plane containing
points of contraflexure
Version II
2V1
2V1
V1
Fig. A.1
38 - 14
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 2 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example 1
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
V1 + 2V1 + 2V1 + V1
15 kN
2.5 kN
5.0 kN
[Assumption 3]
Shear (kN)
CB
FE
IH
LK
(ii)
2.5
5.0
5.0
2.5
Column moments:
Column moments are found by multiplying column shear and half the
height of column as shown below:
Column
Shear (kN)
CB
FE
IH
LK
(iii)
2.5
5.0
5.0
2.5
Moment (kN-m)
2.5 * 2
5.0 * 2
5.0 * 2
2.5 * 2
= 5.0
= 10.0
= 10.0
= 5.0
Girder Moments:
At any joint, sum of the girder moments is equal to the sum of the column
moments. Starting from left corner of the frame, C
Joint C:
MCB = MCF = 5 kN-m
Version II
38 - 15
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 3 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 1
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Joint F:
MFC + MFI = MFE
Girder shears:
Span/2 (m)
CF
FI
IL
(v)
Moment (kN-m)
2.0
3.0
2.0
5.0
5.0
5.0
Shear
2.50
1.67
2.50
Fy = 0
FCB = VCF = 2.5 kN
Joint F:
Fy = 0
FEF + VFC = VFI
FEF = VFI - VFC = 1.67-2.5
Version II
= - 0.83 kN
38 - 16
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 4 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 1
Made by
Date 24-1-2000
SSSR
Checked by-PU Date 30-4-2000
Joint I :
Fy = 0
VIF = FIH + VIL
FIH = VIF - VIL = 1.67-2.5 = - 0.83 kN
Joint L :
Fy = 0
FKL = VLI = 2.5 kN
Ground storey:
(i)
Column shears:
FH = 0
6V1 = 35 kN.
V1 = 35/6 = 5.8 kN.
Column Shears;
VAB = 5.8 kN
VJK = 5.8 kN
(ii)
;
;
VDE
VGH
= 11.7 kN
= 11.7 kN.
Column moments:
Column
AB
DE
GH
JK
Version II
Length/2 (m)
3.0
3.0
3.0
3.0
Shear (kN)
5.8
11.7
11.7
5.8
Moment (kN-m)
17.5
35.0
35.0
17.5
38-17
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
(iii)
Job No:
Sheet 5 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 1
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Girder moments:
Joint B:
MBE = MBC + MBA = 5.0 + 17.5 = 22.5 kN-m
Joint E:
MEH = MEF + MED - MEB
= 10 + 35.0 - 22.5 = 22.5 kN-m
Joint H:
MHK = MIH + MHG - MHE
= 10 + 35.0 - 22.5 = 22.5 kN-m
Joint K:
MKH = MKL + MJK = 5 + 17.5 = 22.5 kN-m
(iv)
(v)
Girder shears:
Beam
Span/2 (m)
Moment (kN-m)
BE
EH
HK
2.0
3.0
2.0
22.5
22.5
22.5
Shear (kN)
11.3
7.5
11.3
FV = 0
FAB = FBC + VBE = 2.5 + 11.3 = 13.8 kN
Version II
38-18
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 6 of 6
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 1
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
15 kN
Joint E: FED =
Joint H: FGH =
Joint K: FJK =
VKH + FLK
= 11.3 + 2.5
= 13.8 kN
C
M= 5.0
V = 2.5
F = 2.5
20 kN
B
M= 17.5
V = 5.8
F = 13.8
M= 5.0 F
V = 2.5
M= 10.0
V = 5.0
F = -0.83
M= 5.0
V = 1.67
M = 22.5
V = 7.5
M = 22.5
V =11.3
I
M= 10.0
V = 5.0
F = -0.83
M = 35.0
V = 11.7
F = -4.6
H
M = 35.0
V = 11.7
F = -4.6
A
4m
M= 5.0
V = 2.5
M= 5.0
V = 2.5
F = 2.5
M = 22.5
V = 11.3
4m
K
M= 17.5
V = 5.8
F = 13.8
G
6m
6m
J
4m
Fig. A. 2
Fig. A. 2. Axial forces in columns and shear forces in members
M Moment in kN-m
V Shear in kN
F Axial force in kN
Version II
38-19
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 1 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Problem 2:
Analyse the building frame shown in previous example (Fig. A) using
Cantilever method. Assume cross-sectional areas of all the columns as
equal.
Top storey:
(1) Location of centroidal line of columns of the storey:
Let the area of each column be A and x be distance to the centre of gavity
of columns shown in Fig. B.1
Girder shears
L
C
F
I
15 kN
A
A
x
A
A 2m
X1
6m
4m
4m
Fig. B.1
Axial forces in
columns
Take moments about column BC
x
0 A 4 A 10 A 14 A
28 A
7m
4A
4A
In cantilever method, it is assumed that the axial forces in the columns are
proportional to the horizontal distance from the center of gravity of the
columns in the storey.
Say, FBC = F
Version II
38-20
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 2 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
FBC 7
FEF
3
FHI
FEF
3
F
7
3
FBC 3 / 7 F
7
FKL F
3
3
F 4 10 F 14 F 0
7
7
18
F 14 F 0
7
116
30
F
7
210
F
1.81 kN
116
30
FBC 1.81 kN
FHI 0.78 kN
FEF 0.78 kN
FKL 1.81 kN
F y 0 VCF
Joint F:
Version II
FBC 1.81 kN
( VFC VCF )
38-21
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 3 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Joint I:
Joint L:
Shear (kN)
CF
FI
IL
Span /2 (m)
1.81
2.59
1.81
Moment (kN-m)
2.0
3.0
2.0
3.62
7.77
3.62
MCB
Joint F:
MFE
= MFC + MFI
= 3.62 + 7.77 = 16.3 kN-m
Joint I:
MIH
= MIF + MIL
= 7.77 + 3.62 = 16.3 kN-m
Joint L:
MLI
Version II
Moment (kN-m)
3.62
11.4
11.4
3.62
Length/2 (m)
2.0
2.0
2.0
2.0
Shear (kN)
1.81
5.70
5.70
1.81
38-22
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 4 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Ground storey:
(i)
15 kN
x
20 kN
B
A
X2
4m
FAB
6m
FDE
FGH
4m
FJK
Fig. B. 2
Let the area of each column be 'A' and x be the distance to the centre of
gravity of columns as shown in Fig. B.2
x
(ii)
0 A 4 A 10 A 14 A
7 m
4A
Say, FAB = F
Then, FDE = 3/7 F ; FGA = 3/7 F and FJK = F
Version II
38-23
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 5 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 2
Made by
Date 24-1-2000
SSSR
Checked by PU
Date 30-4-2000
12
30
F
F 14 F 0
7
7
165 7
10.0 kN
116
;
;
FDE = 4.3 kN
FJK = 10.0 kN.
Joint B:
Joint E:
Joint H:
Joint K:
(VHE = VEH)
Version II
38-24
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 6 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
(iv)
Girder Moments:
Span
BE
EH
HK
(v)
Length/2 (m)
2.0
3.0
2.0
Shear (kN)
Moment (kN-m)
8.2
11.7
8.2
16.4
35.1
16.4
Column moments:
Joint E:
Joint H:
Joint K:
(vi)
Column shears:
Span
AB
DE
GH
JK
Version II
Length/2 (m)
3.0
3.0
3.0
3.0
Moment (kN-m)
12.8
40.1
40.1
12.8
Shear (kN)
4.3
13.3
13.3
4.3
38-25
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 7 of 7
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example 2
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
15 kN
C
M= 3.6
V = 1.8
F = 1.8
20 kN
B
M= 12.8
V = 4.3
F = 10.0
M= 3.6 F
V = 1.8
M=11.4
V = 5.7
F = 0.78
M = 7.77
V = 2.59
M = 35.1
V = 11.7
M = 16.4
V = 8.2
I
M= 11.4
V = 5.7
F = 0.78
M = 40.1
V = 13.3
F = 4.3
H
M = 40.1
V = 13.3
F = 4.3
A
4m
M= 3.6
V = 1.8
M= 3.6
V = 1.8
F = 1.8
M = 16.4
V = 8.2
4m
K
M= 12.8
V = 4.3
F = 10.0
G
6m
6m
J
4m
Fig. A. 2
Fig. B. 3. Axial forces in columns and shear forces in members
M Moment in kN-m
V Shear in kN
F Axial force in kN
Version II
38-26
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 1 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Problem 3:
Determine the moments at the ends of columns and beams in the building
frame shown in Fig. C by factor method. The relative stiffness factors (k)
are mentioned in figure.
15 kN
2
20 kN
2
Relative stiffness
A
factors
L
2
6m
4m
4m
6m
4m
Fig. C
(1) Girder factors:
Girder factor, g = Sum of column relative stiffness factors at the joint
Sum of total relative stiffness factors at that joint.
Joint C:
Joint F:
Version II
gC
2
0.33
2 4
gF
2
0.25
42 2
38-27
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 2 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Joint I:
gI
Joint L:
Joint B:
Joint E:
2
0.286
223
gL
2
0. 4
23
gB
22
0 .5
224
gE
22
0.4
2224
gH
22
0.444
2223
gK
22
0.571
223
Joint H:
Joint K:
Version II
g
0.33
0.25
0.286
0.4
0.5
c = (1-g)
g/2
0.67
0.75
0.714
0.6
0.5
0.165
0.125
0.143
0.2
0.25
c/2
0.335
0.375
0.357
0.3
0.25
38-28
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 3 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Joint
E
H
K
A
D
G
J
g
0.4
0.444
0.571
0
0
0
0
c = (1-g)
0.6
0.556
0.429
1.0
1.0
1.0
1.0
g/2
c/2
0.2
0.222
0.285
0
0
0
0
0.3
0.278
0.215
0.5
0.5
0.5
0.5
Members
c or g
(1)
C
(2)
CF
CB
FE
FI
FC
IF
IH
IL
LI
LK
BE
BC
BA
EF
EB
EH
ED
(3)
0.33
0.67
0.75
0.25
0.25
0.286
0.714
0.286
0.4
0.6
0.5
0.5
0.5
0.6
0.4
0.4
0.6
F
I
L
B
E
Version II
Half values
of factors of
opposite end
(4)
0.125
0.25
0.3
0.143
0.165
0.125
0.278
0.2
0.143
0.215
0.2
0.335
0.5
0.375
0.25
0.222
0.5
(3) + (4)
C or G
(5)
0.455
0.92
1.05
0.393
0.415
0.411
0.992
0.486
0.543
0.815
0.7
0.835
1.0
0.975
0.65
0.622
1.1
(6)
4
2
2
2
4
2
2
3
3
2
4
2
2
2
4
2
2
(5) * (6)
1.82
1.84
2.1
0.786
1.66
0.822
1.984
1.458
1.629
1.63
2.8
1.67
2.0
1.95
2.6
1.244
2.2
38-29
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Joint
Members
c or g
(1)
H
(2)
HI
HE
HG
HK
KL
KH
KJ
AB
DE
GH
JK
(3)
0.556
0.444
0.556
0.444
0.429
0.571
0.429
1.0
1.0
1.0
1.0
K
A
D
G
J
Job No:
Sheet 4 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Half values
of factors of
opposite end
(4)
0.357
0.2
0.5
0.285
0.3
0.222
0.5
0.25
0.3
0.278
0.215
(3) + (4)
C or G
(5)
0.913
0.644
1.056
0.729
0.729
0.793
0.929
1.25
1.30
1.278
1.215
(6)
2
2
2
3
2
3
2
2
2
2
2
(5)* (6)
1.826
1.288
2.112
2.187
1.458
2.379
1.858
2.5
2.6
2.556
2.43
A1
35 6
11.5
18.256
= 18.256
Version II
38-30
MULTI-STOREY BUILDINGS - II
Version II
38-31
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 5 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
A2
15 4
4.15
14.458
Version II
38-31
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 6 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
= 8.72 kN-m
M BC M BA
6.93 23.0
10.69
G BE
2.8
BE
M EF M ED
8.09 25.3
8.69
G EB G EH
2.6 1.244
BH
M HI M HG
7.58 24.3
9.17
G HE G HK
1.288 2.187
BK
Version II
M KL M KJ
G KH
6.05 21.37
11.53
2.379
38-32
MULTI-STOREY BUILDINGS - II
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 7 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
M CB
7.64
4.20
GCF
1.82
BF
M FE
8.72
3.56
GFC GFI
1.66 0.786
BI
BL
M IH
8.23
3.61
G IF G IL
0.822 1.458
M LK
G LI
6.76
4.15
1.629
= 5.91 kN-m
= 2.97 kN-m
= 22.6 kN-m
= 11.8 kN-m
The values of girder factors and column factors are shown in Fig. C.2
Version II
38-33
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 8 of 8
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 3
Made by
Date 24-1-2000
SSSR
Checked by PU
Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
0.33
0.125
0.455
15 kN 0.67
20 kN
0.25
0.92
0.5
0.335
0.835
0.5
0.5
1.0
1.0
0.25
1.25
0.25
0.143
0.393
0.75
F
0.3
1.05
0.4
0.6
0.25
0.375
0.65
0.975
0.4
0.6 E
0.222
0.5
0.455
1.1
0.286 0.286
0.125 0.2
0.411 0.486
0.714 I
0.278
0.992
0.556 0.444
0.357 0.285
0.913 0.729
0.444 H 0.556
0.5
0.2
1.056
0.644
0.25
0.165
0.415
0.5
0.2
0.7
1.0
0.3
1.3
A
4m
G
6m
0.4
0.143
0.543
L 0.6
0.215
0.815
0.571 0.429
0.222 0.3
0.793 0.729
K 0.429
0.5
0.929
1.0
0.278
1.278
1.0
0.215
1.215
4m
Fig. C
Fig. C. 2 Girder factors and column factors of the frame
Factors presented in rectangular boxes are girder factors and column
factors are presented simply without any rectangular box.
Version II
38-34
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 1 of 2
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 4
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
Problem 4:
Determine the moments at the ends of columns and beams of the rigidly
jointed building frame shown in Fig. D for the gravity load applied.
4m
20 kN/ m
4m
4m
5m
5m
5m
Fig. D
Consider the following approximate model.
0.2 L
0.6 L
L=5m
Version II
0.2 L
Approximate model
38-35
MULTI-STOREY BUILDINGS - II
Job No:
Sheet 2 of 2
Rev
Job Title: MULTI-STOREYED BUILDINGS
Worked Example - 4
Made by
Date 24-1-2000
SSSR
Checked by PU Date 30-4-2000
Structural Steel
Design Project
Calculation Sheet
wL2
Maximum + ve B.M. at mid-span =
8
= 20 * 3/2 = 30 kN