Sie sind auf Seite 1von 2

HEISCO

STAFF REQUISITION FORM (SRF)


Cost Center No.

1 6 0 2 0 0 0 0 Cost Center Manager V. Hemanathan

Signature

Date

19.04.2011

Required by (Date)

Contact No.

3132

01 Aug 2011

REQUEST DETAILS
Job Title

Draftsman Pipeline/Piping
Number Required

New

Replacement

Years of
Experience

Age Limit

Tender / Budgeted
Salary

6 - 10

35

1
Remarks:

Classification No.

Recommended Salary Range


From

To

300

400

Experience in piping / pipeline is preferred.

REQUIRED ONLY IF CV ATTACHED


Applicant Name (s):

Recommended By:

Reason for Recommending to consider for


interview:

Functional Department Managers Consent

Authorized Managers Approval :

(for matrix reporting personnel e.g. Planning Engineers, QC Engineers, Storekeepers,


Timekeepers, etc.)

(if different from Cost Center Manager)

Name :

Name :

Signature :

Signature :

Date :

Date :

Original: PCSD for budget confirmation; Copy: HRD for advance information

FOR PCS DEPARTMENT USE ONLY


Budget available :

Yes

No

Remarks :

Name:

Signature :

Date :

Original: HRD if budget is available; Cost Center if budget is not available with copy to HRD

FOR HR DEPARTMENT USE ONLY


HR Job Ref.
Hired

For

SRF Cancelled

Internal Transfer :

Date of Joining

CV#

Reason :
Transferred Mr.

ID#

From

Remarks :
HR Manager :

CODE #

DWI 501 Att. 1 Rev. 1 21 Dec. 2009

Date :

EDUCATION DISCIPLINE

CODE #

FIELD OF EXPERIENCE
Page 1 of 2

HEISCO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Architect
Arts
AutoCAD
Chemical/Process
Chemistry
Civil
Commerce
Computer
Construction Management
Electrical
Electronics/Telecommunication
Finance
HRM/Personnel Mgmt.
Instrument
Marketing
Materials
Mechanical
Operations
Other Science Subject
Others
Production
Quantity Surveying
Refrigeration
Safety
Secretarial
Training

CODE #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

SECTOR / INDUSTRY
Consultants
Contracting
Corporations
Engineering
Fertilizers
Gas Plant
Marine
Ministries/Government
Offshore
Oil & Gas
Onshore
Others
Petrochemicals
Power Station
Refineries
Steel Industries
Tankers
Workshops

DWI 501 Att. 1 Rev. 1 21 Dec. 2009

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

Accountant
Administration
Assistant
Building
Camp Maintenance
Cathodic Protection
Computer Networking
Computer Software
Construction
Costing
DCS
Design
Drafting
Electronics
Equipment Maintenance
Finance & Accounts
Fire Fighting
Hardware
Heavy Equipment
Hr & Training
HVAC
Laboratory
Maintenance
Marketing
Others
Personnel
Pipeline
Piping
Planning
PLC
Plumbing
Pressure Vessel
Procurement
Production/Operations
Quality Assurance
Quality Control
Quantity Surveying
Rigging/Lifting
Rotating Equipment
Safety
Secretary
Sewage Treatment
Shutdown & Tie Inns
Stores
Static Equipment
Steel Structure
Stress Analysis
Tanks
Tendering
Turbo Machine
Water Injection
Water Treatment
Welding

Page 2 of 2

Das könnte Ihnen auch gefallen