D E S C R I PT I O N
QTY
UNIT
Excavation
Excavation in unclassified ground including all hard and rock
layers, temporary earthwork supports, dewatering and any works
below the normal water table levels to : Pits and trenches for
foundations commencing from the site existing levels .
Necessary moving or transportation about the site of excavated
material including hauling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
557
FILL
Approved granular fill selected from excavated material and/or
imported clean sand fill according to site soil report
recommendation and subject to Engineer's approval in making up
levels, including compaction in layers 250mm to maximum in
field density as per standard .
221
1566
1566
RATE
AMOUNT
SR
A- LABOUR ACCOMMODATION
BILL 01 - STRUCTURAL
1
1.1
1.2
1.3
EARTH WORK:
1.4
TERMITE CONTROL
Soil treatment for termite control
To Bill Summary
SR
Page 1 of 18
D E S C R I PT I O N
QTY
UNIT
39
215
67
15
RATE
AMOUNT
SR
A- LABOUR ACCOMMODATION
BILL 01 - STRUCTURAL
CONCRETE
Plain insitu concrete, 2500PSI, with typeV cement
including formwork and all requirements
2.1
Blinding beds
2.2
To Bill Summary
SR
Page 2 of 18
D E S C R I PT I O N
QTY
UNIT
235
2.4.1 columns
17
34
2.50
283
M2
3.60
M2
RATE
AMOUNT
SR
A- LABOUR ACCOMMODATION
BILL 01 - STRUCTURAL
2.3
2.4
2.50
Sundries
To Bill Summary
SR
Page 3 of 18
D E S C R I PT I O N
QTY
UNIT
20736
KG
RATE
AMOUNT
SR
A- LABOUR ACCOMMODATION
BILL 01 - STRUCTURAL
3
3.1
3.1.1
H 250X250X9
3.1.2
8940
KG
3.1.3
L120x120x12
4689
KG
3.1.4
PLATES
950
KG
3.1.5
Rod20mm
1 MM CORREGATED SHEET
230
LM
1368
M2
1368
M2
3.1.6
3.1.7
3.1.8
160
NO
3.1.9
BOLT M 24-A325
200
NO
To Bill Summary
SR
Page 4 of 18
D E S C R I PT I O N
QTY
UNIT
970
2010
RATE
AMOUNT
SR
A- LABOUR ACCOMMODATION
BILL 01 - STRUCTURAL
4
4.1
4.2
To Bill Summary
SR
Page 5 of 18
D E S C R I PT I O N
QTY
UNIT
Excavation
Excavation in unclassified ground including all hard and rock
layers, temporary earthwork supports, dewatering and any works
below the normal water table levels to : Pits and trenches for
foundations commencing from the site existing levels .
Necessary moving or transportation about the site of excavated
material including hauling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
473
FILL
Approved granular fill selected from excavated material and/or
imported clean sand fill according to site soil report
recommendation and subject to Engineer's approval in making up
levels, including compaction in layers 250mm to maximum in
field density as per standard .
247
1151
1151
RATE
AMOUNT
SR
1
1.1
1.2
1.3
EARTH WORK:
1.4
TERMITE CONTROL
Soil treatment for termite control
To Bill Summary
SR
Page 6 of 18
D E S C R I PT I O N
QTY
UNIT
33
122
55
15
RATE
AMOUNT
SR
CONCRETE
Plain insitu concrete, 2500PSI, with typeV cement
including formwork and all requirements
2.1
Blinding beds
2.2
To Bill Summary
SR
Page 7 of 18
D E S C R I PT I O N
QTY
UNIT
167
2.4.1 columns
15
25
2.50
293
M2
2.50
M2
RATE
AMOUNT
SR
2.3
2.4
2.50
Sundries
To Bill Summary
SR
Page 8 of 18
D E S C R I PT I O N
QTY
UNIT
13382
KG
RATE
AMOUNT
SR
3
3.1
3.1.1
H 250X250X9
3.1.2
6334
KG
3.1.3
L120x120x12
4689
KG
3.1.4
plates
650
KG
3.1.5
Rod20mm
1 MM CORREGATED SHEET
213
LM
890
M2
3.1.6
3.1.7
890
M2
3.1.8
112
NO
3.1.9
BOLT M 24-A325
140
NO
To Bill Summary
SR
Page 9 of 18
D E S C R I PT I O N
QTY
UNIT
214
1600
RATE
AMOUNT
SR
4
4.1
4.2
To Bill Summary
SR
Page 10 of 18
D E S C R I PT I O N
QTY
UNIT
Excavation
Excavation in unclassified ground including all hard and rock
layers, temporary earthwork supports, dewatering and any works
below the normal water table levels to : Pits and trenches for
foundations commencing from the site existing levels .
Necessary moving or transportation about the site of excavated
material including hauling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
231
FILL
Approved granular fill selected from excavated material and/or
imported clean sand fill according to site soil report
recommendation and subject to Engineer's approval in making up
levels, including compaction in layers 250mm to maximum in
field density as per standard .
134
1200
1200
RATE
AMOUNT
SR
C- KITCHEN BUILDING
BILL 01 - STRUCTURAL
1
1.1
1.2
1.3
EARTH WORK:
1.4
TERMITE CONTROL
Soil treatment for termite control
To Bill Summary
SR
Page 11 of 18
D E S C R I PT I O N
QTY
UNIT
18
42
31
2.50
M2
180
RATE
AMOUNT
SR
C- KITCHEN BUILDING
BILL 01 - STRUCTURAL
CONCRETE
Plain insitu concrete, 2500PSI, with typeV cement
including formwork and all requirements
2.1
Blinding beds
2.2
2.2.5 Sundries
2.2.5.1 25 mm non-shrink grout under base plate
2.3
To Bill Summary
SR
Page 12 of 18
D E S C R I PT I O N
QTY
UNIT
18564
KG
RATE
AMOUNT
SR
C- KITCHEN BUILDING
BILL 01 - STRUCTURAL
3
3.1
3.1.1
IPE 450
3.1.2
H 250X250X9
8456
KG
3.1.3
9576
KG
3.1.4
L120x120x12
9663
KG
3.1.5
PLATES
1800
KG
3.1.6
Rod20mm
1 MM CORREGATED SHEET
202
LM
1209
M2
1209
M2
3.1.7
3.1.8
3.1.9
116
NO
3.1.10
BOLT M 24-A325
336
NO
To Bill Summary
SR
Page 13 of 18
D E S C R I PT I O N
QTY
UNIT
500
1391
RATE
AMOUNT
SR
C- KITCHEN BUILDING
BILL 01 - STRUCTURAL
4
4.1
4.2
To Bill Summary
SR
Page 14 of 18
D E S C R I PT I O N
QTY
UNIT
Excavation
Excavation in unclassified ground including all hard and rock
layers, temporary earthwork supports, dewatering and any works
below the normal water table levels to : Pits and trenches for
foundations commencing from the site existing levels .
Necessary moving or transportation about the site of excavated
material including hauling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
402
FILL
Approved granular fill selected from excavated material and/or
imported clean sand fill according to site soil report
recommendation and subject to Engineer's approval in making up
levels, including compaction in layers 250mm to maximum in
field density as per standard .
211
RATE
AMOUNT
SR
1
1.1
1.2
EARTH WORK:
To Bill Summary
SR
Page 15 of 18
D E S C R I PT I O N
QTY
UNIT
55
70
65
RATE
AMOUNT
SR
CONCRETE
Plain insitu concrete, 2500PSI, with typeV cement
including formwork and all requirements
2.1
Blinding beds
2.2
To Bill Summary
SR
Page 16 of 18
D E S C R I PT I O N
QTY
UNIT
2.5
2.4.1 columns
33
40
16
M2
RATE
AMOUNT
SR
2.3
2.4
To Bill Summary
SR
Page 17 of 18
D E S C R I PT I O N
QTY
UNIT
1200
215
RATE
AMOUNT
SR
3
3.1
3.20
To Bill Summary
SR
Page 18 of 18