Sehschlang TBT II / Bohr und Workoveranlagen & Gerte
Dr. Catalin Teodoriu, schriftl., 90 min., Aufpasser: Carlos (lockere
Arbeitsatmoshre;)),
6 pkt/aufgabe, daher genug schreiben wenn mglichhoffe habe alle
1. What are the rotary drilling parameters and their associated systems?
- Rotary system -> RPM (rotations/min)
- Circulation system -> GPM or bbl/min
- Hoisting system -> WOB (weight on bit)
2. Whats the difference b/w a mast and a derrick?
- Mast can support itself
- Derrick has 3-4 legs and anchors
3. Difference b/w Raised floor cantilever mast and Cantilever Mast with box
type substructure? Advantages/Disadvantages.
- 1. Installation of mast and substr., building mast, mast buildup
completed,substr. Buildup completed
- 2. Installation of mast and substructure, mast buildup completed
(Vorteile etc. aus online vorlesung, bilder im script 2)