Ref Page
No.
Pg 5/ 20
Comments
Pg 5/ 20
Pg 5/ 20
Pg 5/ 20
Pg 5/ 20
Pg 5/ 20
Pg 5/ 20
Pg 5/ 20
Response
Noted. However, please note that we have the BMS panel is
a local control panel with ON/ OFF push buttons and Pilot
Lights only. We have done the FAT on the panel.
We can ONLY check its integrity with the whole once it has
been connected to Topaz PMCS and SIS. To be done during
pre-commissioning at site.
Noted. However, please note that we will only LIGHT up the
burner to confirm it is functional for 5 minutes. We do not
have glycol in the heater and continuous firing without a
medium will damage the firetube.
We will describe on the procedures in Rev B (Boss, please
help)
Kindly note that pump performance test have been carried
out in factory with BV as witness (See attached BV report).
We will NOT be carrying out another set of pump functional
testing during FAT as we DO NOT have the test medium.
(Boss, please help)
Please be advised that we have DONE the test when drum
cable arrived. However, as a standard procedure, we will
perform another set of testing after lay out and termination
for final confirmation.
Noted. To be incorporated in Rev B. Please see item 2
response.
Please refer to item 3 response.
We will NOT carry out pump running tests.
(Boss, please help)
(Boss, please help)
Pg 5/ 20
10
Pg 7/ 20
11
Pg 8/ 20
12
Pg 8/ 20
13
Pg 8/ 20
14
Pg 9/ 20
Noted.
15
Pg 9/ 20
16
Pg 9/ 20
17
Pg 9/ 20
Pg 9/ 20
19
Pg 10/ 20
20
Pg 10/ 20
21
Pg 10/ 20
22
Pg 11/ 20
23
Pg 11/ 20
24
Pg 11/ 20
25
Pg 12/ 20
26
Pg 13/ 20
27
Pg 13/ 20
28
Pg 13/ 20
Noted
To be confirmed
Noted
(Boss please help and advice)
Pg 13/ 20
30
Pg 14/ 20
31
Pg 15/ 20
32
Pg 16/ 20
33
Pg 16/ 20
34
Pg 17/ 20
35
Pg 17/ 20
36
Pg 18/ 20
37
Pg 19/ 20
38
Pg 19/ 20
DP Transmitter Testing
j. Why do we need to remove the pressure source and
reinstall the transmitter?
Instrument Tubing/ Pneumatic Tubing Leak Test
j. Release the applied pressure to where? Atm?
Instrument Tubing/ Pneumatic Tubing Leak Test
k. Blow the impulse line with what?
Instrument Cable Test
Test cable before installation. Provide check
sheet, no need witness during FAT.
Partial Loop Check Procedures
j. Connect a source to instrument
> Use real source or just 4-20 mA simulator? How
bout digital signal?
How to observe the reading at JB termination?
39
Pg 20/ 20
Noted.
40
RCU
Check
Noted.
Sheet
41
42
43
44
45
46
47
48
49
50
Actuator
Check
Sheet
Earthing
Check
Sheet
Pipe Work
After Test