WELL TIME PROPOSAL ESTIMATE

OPERATOR
CONTRACT AREA
CONTRACT AREA NO

PT. PERTAMINA EP
INDONESIA
ASSET 4

NO AFE
DATE
PROJECT TYPE
WELL NAME
LOCATION
FIELD STRUCTURE
WELL TYPE
KOP
OVERLAP LINER 7"
OVERLAP LINER 4.1/2"
INCLINATE & AZIMUTH
BASIN
ELEVASI
SURFACE COORDINATE
TARGET COORDINATE

14 -XXXX
09 April 2015
Development / Exploitation
SEMANGGI INFILL
SEMANGGI INFILL
Semanggi
Vertical
at 0 m
70 m
0m
Cekungan
0m
E = xxxx.xxx M
N = xxxx.xxx
E = xxxx.xxx M
N = xxxx.xxx
E = xxxx.xxx M
N = xxxx.xxx
E = xxxx.xxx M
N = xxxx.xxx
550 HP
5.00 m from Ground Level

RIG / OWNER
TINGGI RIG FLOOR
WELL TIME ESTIMATE

DRILLING JOB DESC


Rig Move
Rig Up
Rig up Top Drive
Drilling 36"
Drilling 26"
Drilling 17.5"
Drilling 12.25"
Drilling 8.5"
Drilling 6"
Cement Production Casing
Completion Session
Production Test
Rig Down

M
M
M
M

Main Target : Lap III (Utama)


Main Target : XXX

OH SIZE
(inch)

CSG SIZE
(inch)

36
26
17 1/2
12 1/4
8 1/2
6

30
20
13 3/8
9 5/8
7
4 1/2

DEPTH
(meter)

70.0
350.0
533.0

Drilling RATE
(m/days)

200
200
150

Top of Liner
(mMD)

Drilling

280.0
0.0

0.00
0.00
0.88
2.59
2.19
0.00

TOTAL DRILLING DAYS


TOTAL RIG DAYS

17.66
34.66

POOH & RIH Rate


For BHA and Tubing
For Running Casing
For Stand-Up

OH SIZE
36
26
17 1/2
12 1/4
8 1/2
6

5
7
10

TYPE

POUNDER

K-55
K-55
K-55
N-80

94
54.5
40
26

min/stds
min/jts
min/jts
CASING PROPERTIES
THREAD
RANGE
BTC
BTC
BTC
BTC

R-3
R-3
R-3
R-3

DEPTH

70.0
350.0
533.0

MUD PROPERTIES
TYPE
SG
30" at 0 mMD
Spud Mud
1.04 1.04 20", K-55, 94 ppf, BTC, R-3 at 0 mM KCL Polimer
Spud Mud
1.07 13 3/8", K-55, 54.5 ppf, BTC, R-3 a
KCL Polimer
1.06 9 5/8", K-55, 40 ppf, BTC, R-3 at 3
KCL Polimer
1.10 7", N-80, 26 ppf, BTC, R-3 at 533
LINK REFERENCE

4 1/2", , ppf, , at 0 mMD

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOL 7" at 280 mMD


xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOL 4 1/2" at 0 mMD
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxKOP at 0 mMD
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxTOTAL DEPTH at 533 mMD

Key Point
Specified Well

yes

266147808.xlsx

DRILLING TIME (days)


Non Drilling
TOTAL
7
7
5
5
2
2
0.00
0.00
0.00
0.00
2.33
3.20
1.68
4.27
0.54
2.73
0.00
0.00
1.32
1.32
3.13
3.13
3.00
3.00
3
3

Do you plan to use some equipment below ??


Top Drive
yes
MWD + Motor
LWD + Motor
GVR
Other Directional
Whipstock
Well Logged
yes

1.07
1.07
1.07
1.07
1.15

RENCANA WELL PROFILE


LOCATION
WELL
RKB relative to GL

:
:
:

SEMANGGI INFILL
SEMANGGI INFILL
5.00 m

Gel Water 1,07 Sg


13 3/8", K-55, 54.5 ppf,
BTC, R-3

Spud Mud, Sg 1.07

KCL Polimer, Sg 1.06

KCL Polimer, Sg 1.10

266147808.xlsx

Total Depth 533 mMD

13 3/8", K-55, 54.5 ppf, BTC, R-3 at 70 mMD

TOL 7" at 280 m

9 5/8", K-55, 40 ppf, BTC, R-3 at 350 mMD

7", N-80, 26 ppf, BTC, R-3 at 533 mMD

DRILLING TIME ESTIMATION


NO
1
2

JOB DESCRIPTION

CODE

1a
1a

Rig Up, including Stand-up 5" DP and 8" DC.


Rig Up Top Drive M/U BHA dan Bit 26".

PRE SPUD SESSION


36" DRILLING SESSION
3
4
5
6
7
8
9
10
11
12
13
14
15
16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

HOURS

DAYS

PLAN
CUMM DAYS

120
48

5.00
2.00

XXXXXX
XXXXXX

RIG DAYS
0.00
5.00
7.00

DEPTH
0.00
0.00
0.00

168.0
0.0

7.00
0.00

0.00
0.00

7.00
7.00

0.00
0.00

0.0
0.0
0.0
0.0
0.0
-0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
-0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02

7.00
7.00
7.00
7.00
7.00
6.98
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-0.5

-0.02

0.00

7.00

0.00

0.0
2.0
0.0
0.0
0.0
13.4
2.0
1.4
2.0
0.2
1.0
0.9
2.0
2.0
4.0
8.0
6.0
22.0
8.0
2.0

0.00
0.08
0.00
0.00
0.00
0.56
0.08
0.06
0.08
0.01
0.04
0.04
0.08
0.08
0.17
0.33
0.25
0.92
0.33
0.08

0.00
0.08
0.08
0.08
0.08
0.64
0.73
0.78
0.87
0.88
0.92
0.95
1.04
1.12
1.29
1.62
1.87
2.79
3.12
3.20

7.00
7.08
7.08
7.08
7.08
7.64
7.73
7.78
7.87
7.88
7.92
7.95
8.04
8.12
8.29
8.62
8.87
9.79
10.12
10.20

0.00
0.00
0.00
0.00
0.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00
70.00

76.9

3.20

3.20

10.20

70.00

1.7
2.0
0.2
8.0
2.0
1.0
39.6
2.0
2.7
2.0
1.0
1.0
4.3
2.0
2.0
5.0
8.0
4.0
4.0
8.0
2.0

0.07
0.08
0.01
0.33
0.08
0.04
1.65
0.08
0.11
0.08
0.04
0.04
0.18
0.08
0.08
0.21
0.33
0.17
0.17
0.33
0.08

3.27
3.36
3.36
3.70
3.78
3.82
5.47
5.56
5.67
5.75
5.79
5.84
6.02
6.10
6.18
6.39
6.72
6.89
7.06
7.39
7.47

10.27
10.36
10.36
10.70
10.78
10.82
12.47
12.56
12.67
12.75
12.79
12.84
13.02
13.10
13.18
13.39
13.72
13.89
14.06
14.39
14.47

70.00
70.00
70.00
70.00
70.00
70.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00

102.5

4.27

7.47

14.47

350.00

1.1
2.0
1.0
8.0
2.0
1.0
29.3
2.0
2.5
2.0
1.6
1.0
6.0
6.0
6.0

0.05
0.08
0.04
0.33
0.08
0.04
1.22
0.08
0.10
0.08
0.07
0.04
0.25
0.25
0.25

7.52
7.60
7.65
7.98
8.06
8.10
9.32
9.41
9.51
9.59
9.66
9.70
9.95
10.20
10.20

14.52
14.60
14.65
14.98
15.06
15.10
16.32
16.41
16.51
16.59
16.66
16.70
16.95
17.20
17.20

350.00
350.00
350.00
350.00
350.00
350.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00

71.5
0.0

2.98
0.00

10.20
10.20

17.20
17.20

533.00
533.00

0.0
0.0
1.6
2.0
1.6
2.0
6.5
2.0
2.0
6.0
8.0
4.0
6.0
6.0
5.5
2.0
1.5
24.0
0.0
0.0
0.0
0.0
3.1
4.0
1.5
1.0
6.0
2.0
6.0
2.5
6.0
6.0
60.0

0.00
0.00
0.07
0.08
0.07
0.08
0.27
0.08
0.08
0.25
0.33
0.17
0.25
0.25
0.23
0.08
0.06
1.00
0.00
0.00
0.00
0.00
0.13
0.17
0.06
0.04
0.25
0.08
0.25
0.11
0.25
0.25
2.50

10.20
10.20
10.27
10.35
10.42
10.50
10.77
10.86
10.94
11.19
11.52
11.69
11.94
12.19
12.42
12.50
12.57
13.57
13.57
13.57
13.57
13.57
13.70
13.86
13.93
13.97
14.22
14.30
14.55
14.66
14.91
15.16
17.66

17.20
17.20
17.27
17.35
17.42
17.50
17.77
17.86
17.94
18.19
18.52
18.69
18.94
19.19
19.42
19.50
19.57
20.57
20.57
20.57
20.57
20.57
20.70
20.86
20.93
20.97
21.22
21.30
21.55
21.66
21.91
22.16
24.66

533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00
533.00

178.9

7.45

17.66

24.66

533.00

72.0

3.00

XXXXXX

27.66

533.00

CLASSIFIED DRILLING TIME


SESSION
DAYS
Rig-Up Rig Equipment
Rig-Up Top Drive

5.00
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

26" DRILLING SESSION


17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Prepare Non Directional BHA + 17 1/2" Bit

Drilling Formation 17 1/2" to Csg Point at 70 m, ROP 200 m/days


Circulate hole clean at bottom
Short Trip condition hole for 17.5" Drilling
Circulate hole clean and drop Survey.
POOH 17 1/2" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 13 3/8" Casing
RIH Casing 13 3/8", rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 13.3/8" Casing
Wait On Cement
Cut 20" casing and N/D Diverter 20"
Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, )
Nipple Up BOP 13.5/8" x 5.000 psi
Pressure Test BOP 13.5/8" x 5.000 psi

0
6a
0
0
0
2a
5a
6a
5a
6a
12a
12b
5b
13a
13b
14
15a
16a
15a
15b

Drilling 17.5"

Non Drilling 17.5"

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.33

17.1/2" DRILLING SESSION


37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

Stand up 10 stands DP ( 280 m), Prepare for RIH 12.1/4", Rate 10 mnt/std
Prepare Directional BHA + 12 1/4" Bit
RIH Bit 12 1/4" to tag TOC, rate 5 mnt/std
Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.
Circulate conditioning mud
Mud Off Test
Drilling Formation 12.25" to Csg Point at 350 m, ROP 200 m/days
Circulate hole clean at bottom
Short Trip condition hole for 12.25" Drilling
Circulate hole clean at bottom
POOH 12 1/4" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 9 5/8" Casing
RIH Casing 9 5/8", rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 9.5/8" Casing
Wait On Cement
Nipple Down BOP 13 5/8" x 5.000 psi
Nipple Up Casing Head Spool 11"
Nipple Up BOP 13.5/8" x 5.000 psi
Pressure Test BOP 13.5/8" x 5.000 psi

6d
6a
6a
2a
5b
2c
2a
5a
6a
5a
6a
12a
12b
5b
13a
13b
14
15a
16a
15a
15b

Drilling 12.25"

Non Drilling 12.25"

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.68

12.1/4" DRILLING SESSION


58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Stand up 7 stands DP ( 183 m), Prepare for RIH 8.1/2", Rate 10 mnt/std
Prepare Non Directional BHA + 8 1/2" Bit
RIH Bit 8 1/2" to tag TOC, rate 5 mnt/std
Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.
Circulate conditioning mud
Mud Off Test
Drilling Formation 8.5" to Csg Point at 533 m, ROP 150 m/days
Circulate hole clean at bottom
Short Trip condition hole for 8.5" Drilling
Circulate hole clean at bottom
POOH 8 1/2" Bit from Csg Point & L/D BHA
Prepare logging tools
Run Logs : DSI-GR
Run Logs : LDL-CNL-GR
Run Logs : HALS-MSFL-BHC-GR-SP

6d
6a
6a
2a
5b
2c
2a
5a
6a
5a
6a
11a
11b
11b
11b

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Drilling 8.5"

Non Drilling 8.5"

2.19
0.00
0.00
0.00
0.54

8.1/2" DRILLING SESSION


6" DRILLING SESSION
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105

RIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/std


Circulate hole clean
POOH 8 1/2" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 7" Casing/Liner
RIH Casing 7", rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 7" Casing.
Wait On Cement
Nipple Down BOP 13 5/8" x 5.000 psi
Nipple Up Tubing Head Spool 11" x 7-1/16"
Nipple Up BOP 7-1/16" x 5.000 psi
RIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/std
Circulate hole clean
POOH 6" Bit from Landing Collar 7" & L/D BHA
Rig Down Top Drive

RIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt
Circulate and change over to Completion Fluid
POOH 7" Scrapper from Landing Collar 7" & L/D BHA
Prepare logging tools
Run Logs : CBL-VDL-CET-CCL-GR
Prepare Perforation Tools
Perforation
RIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packer
Nipple Down BOP 7-1/16" x 5.000 psi
Nipple Up X-masstree
Production Test

0
0
6a
5a
6a
12a
12b
5b
13a
13b
14
15a
16a
15a
6a
5a
6a
6b
0
0
0
0
6d
5b
6b
11a
11b
11a
11b
17a
15a
16a
17b

Production Test

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.13
0.00
0.00
3.00

Rig Down

3.00

Cement Production Casing

Completion Session

COMPLETION
106

Rig Release & R/D Rig

TOTAL DRILLING TIME (DAYS)


TOTAL RIG TIME OPERATION (DAYS)

17.7
27.7

Remarks

DRILLING TIME CHART - WELL SEMANGGI INFILL


DRILLING DEPARTMENT

13.375

20

30

CASING DESIGN

FORMATION

13 3/8" at 70 m

WONOCOLO

9.625

100

BULU

TOL 7" at 280 m

200
DEPTH (mMD)

300

9 5/8" at 350 m
NGRAYONG

4.5

400

500
G
7" at 533 m

I
2

266147808.xlsx

26

28

600
0

DATA TEKNIS
No. AFE
Well Name
Location
Field Structure
Surface Coordinate

:
:
:
:
:

Elevation
Well Type
Project Type
Total Depth
Rig / Owner
Tinggi Rig Floor

:
:
:
:
:
:

14 -XXXX
SEMANGGI INFILL
SEMANGGI INFILL
Semanggi
E = xxxx.xxx M
N = xxxx.xxx M
0.000
Vertical
Development / Exploitation
533.0 m
550 HP
5.00 m

10

12

14

16

18

20

22

24

30

DAYS
KETERANGAN

Duration

Drill'g
Days

Rig Days

Dry Hole Basis


A - B : Rig-up, termasuk R/U Top Drive dan stand-up DP & DC.
0
B - C : Drilling 17.5" OH to 70 m, Circulation, Trip, POOH & L/D BHA
#NAME?
C - D : RIH & 13.3/8" Casing Cementing job, WOC, N/U WellHead, N/U BOP & Pressure Test
#NAME?
D - E : Drilling 12.25" OH to 350 m, Circulation, Trip, POOH & L/D BHA
#NAME?
E - F : RIH & Cement Casing 12.1/4", TSK, N/U WellHead, N/U & Tes BOP
#NAME?
F - G : Drilling 8.5" OH to 533 m, Circulation, Trip, POOH & L/D BHA
#NAME?
G - H : RIH & Cement Casing 7", TSK, N/U WellHead, N/U & Tes BOP
#NAME?
H - 0 :
0
PLEAZE HIDDEN THIS ROW ONLY BY CLICK ROW HEADER and THEN CLICK HIDE
0 - 0 :
0
PLEAZE HIDDEN THIS ROW ONLY BY CLICK ROW HEADER and THEN CLICK HIDE
Completion
H - I : RIH Scrapper to Liner depth interval, RIH and perform production casing cementing job
I - J : RIH Casing Scrapper to perforated zone interval. Cased Hole Logging & Perforation. RIH Production String
J - K : N/D BOP Stack. N/U X-masstree. Production Test
K - L : Rig Down
TOTAL OPERASIONAL DAYS

Kum
7.0
0.88
2.33
2.59
1.68
2.19
0.54
0.00
0.00

Hari
0.88
3.20
5.79
7.47
9.66
10.20
10.20
10.20

Kum
7
7.88
10.20
12.79
14.47
16.66
17.20
17.20
17.20

1.32
3.13
3.00
3.00

11.52
14.66
17.66
17.66

18.52
21.66
24.66
27.66
27.66

DATA
(NOTE : Coloured Cell on this column was
formulated to make reading easier)

----------------------------- RIP UP/DOWN -------------------------Rig Up, including Stand-up 5" DP and 8" DC.
Rig Up Top Drive M/U BHA dan Bit 26".

--------------- DRILLING FORMATION & CEMENT ------------Drilling Formation 36" to Csg Point at 0 m, ROP 0 m/days
Drilling Formation 26" to Csg Point at 0 m, ROP 0 m/days
No KOP at 17.5"in
Drilling Formation 17 1/2" to Csg Point at 70 m, ROP 200 m/days
No KOP at 12.25"
Drilling Formation 12.25" to Csg Point at 350 m, ROP 200 m/days
No KOP at 8.5"
Drilling Formation 8.5" to Csg Point at 533 m, ROP 150 m/days
Drilling Formation by GVR to Csg Point at m, ROP m/days
Drilling Formation 6" to Csg Point at 0 m, ROP 0 m/days
Drill Out cement to top liner 7"
Drill Out cement to top liner 6"
Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.

---------------------------- CIRCULATING ----------------------------Circulate conditioning mud


Circulate conditioning mud Sg in=out
Circulate hole clean
Circulate hole clean at bottom
Circulate hole clean and drop Survey.
Circulate and change over to Completion Fluid

------------------------ BOP EQUIPMENT --------------------------Cut 30" casing and N/D Diverter 30"
Cut 20" casing and N/D Diverter 20"
Nipple Down BOP 13 5/8" x 5.000 psi
Nipple Down BOP 7-1/16" x 5.000 psi
Nipple Up Diverter 30"
Nipple Up Diverter 20". (incl : Welded & inspection)
Nipple Up BOP 13.5/8" x 5.000 psi
Nipple Up BOP 7-1/16" x 5.000 psi
Pressure Test Diverter 30"
Pressure Test Diverter 20"

Pressure Test BOP 13.5/8" x 5.000 psi


Pressure Test BOP 7-1/16" x 5.000 psi
Function Test Diverter 30"
Function Test Diverter 20"

------------------ WELLHEAD & X-MASSTREE------------------Nipple Up Bottom Flange 20", (incl : welded & inspection)
Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, )
Nipple Up Casing Head Spool 11"
Nipple Up Tubing Head Spool 11" x 7-1/16"
Nipple Up X-masstree

---------------------------PULL OUT of HOLE ------------------------POOH 36" Bit from Csg Point & L/D BHA
POOH 26" Bit from Csg Point & L/D BHA
POOH 17 1/2" Bit from Csg Point & L/D BHA
POOH 12 1/4" Bit from Csg Point & L/D BHA
POOH 8 1/2" Bit from Csg Point & L/D BHA
POOH 6" Bit from Csg Point & L/D BHA
POOH 9 5/8" Scrapper from TOL 7" & L/D BHA
POOH 7" Scrapper from TOL 4.5" & L/D BHA
POOH 7" Scrapper from Landing Collar 7" & L/D BHA
POOH 4 1/2" Scrapper from Landing Collar 4.5" & L/D BHA
POOH 8 1/2" Bit from TOL 7" & L/D BHA
POOH 6" Bit from TOL 4.5" & L/D BHA
POOH 6" Bit from Landing Collar 7" & L/D BHA
POOH 3.3/4" Bit from Landing Collar 4.5" & L/D BHA
POOH and L/D 7" Liner setting tool
POOH and L/D 4.1/2" Liner setting tool

-------------------------------- PREPARE ----------------------------Prepare casing handling tools to run 30" Stove Pipe
Prepare casing handling tools to run 20" Conductor Casing
Prepare casing handling tools to run 13 3/8" Casing
Prepare casing handling tools to run 9 5/8" Casing
Prepare casing handling tools to run 7" Casing/Liner
Prepare Non Directional BHA + 26" Bit
Prepare Non Directional BHA + 17 1/2" Bit
Prepare Non Directional BHA + 12 1/4" Bit
Prepare Non Directional BHA + 8 1/2" Bit
Prepare Non Directional BHA + 6" Bit
Prepare Directional BHA + 17 1/2" Bit
Prepare Directional BHA + 12 1/4" Bit
Prepare Directional BHA + 8 1/2" Bit
Prepare Directional BHA + 6" Bit
Prepare logging tools
Prepare Perforation Tools

------------------------- RIH BIT & SCRAPPER -------------------RIH Bit 36" to tag TOC at 0 m, rate 5 mnt/std
RIH Bit 26" to tag TOC, rate 5 mnt/std

RIH Bit 17 1/2" to tag TOC, rate 5 mnt/std


RIH Bit 12 1/4" to tag TOC, rate 5 mnt/std
RIH Bit 8 1/2" to tag TOC, rate 5 mnt/std
RIH Bit 6" to tag TOC, rate 5 mnt/std
RIH Bit 8 1/2" to tag Top Liner 7", rate 5 mnt/std
RIH Bit 6" to tag Top Liner 4.1/2", rate 5 mnt/std
RIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/std
RIH Bit 3.3/4" to tag Landing Collar 4.5", rate 5 mnt/std
RIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/std
RIH Bit 6" to condition hole to Bottom, rate 5 mnt/std
RIH 9-5/8" Scrapper to tag TOL 7"
RIH 7" Scrapper to tag TOL 4.1/2"
RIH 7" Scrapper to tag Landing Collar
RIH 4-1/2" Scrapper to tag Landing Collar
RIH 9-5/8" Scrapper w/ Tubing jts/jts to tag TOL 7", Rate 10 min/jt
RIH 7" Scrapper w/ Tubing jts/jts to tag TOL 4.1/2", Rate 10 min/jt
RIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt
RIH 4.1/2" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt
RIH 7" & 4.1/2" Scrapper Tandem w/ Tubing jts/jts
RIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packer
RIH Production String Tubing 2.7/8" joint/joint, incl. set packer, rate 10 min/std
RIH Prod String 2.7/8" & 2.3/8" Tubing to 4.1/2" Prod Csg, not joint/joint, incl. se
RIH Production String Tubing 2.7/8" & 2.3/8" joint/joint, incl. set packer, rate 10 m

-------------------------------- RIH CASING --------------------------RIH Casing 30", rate 7 mnt/std


RIH Casing 20", rate 7 mnt/std
RIH Casing 20", incl. RIH Tubing, rate 7 mnt/std
RIH Casing 13 3/8", rate 7 mnt/std
RIH Casing 9 5/8", rate 7 mnt/std
RIH Casing 7", rate 7 mnt/std
RIH Liner 7" with DP, rate 7 mnt/std
RIH Liner 4 1/2 with DP, rate 7 mnt/std

-------------------------- CEMENTING JOB -------------------------Cement 30" casing / Stove Pipe


Cement 20" casing
Cement 20" casing (include POOH Tubing 2 7/8")
Cement 13.3/8" Casing
Cement 9.5/8" Casing
Cement 7" Casing.
Cement 7" Liner & Set Liner.

--------------------- RUN LOGGING & SURVEY ------------------Run Logs : HALS-MSFL-BHC-GR-SP


Run Logs : DLL-MSFL-BHC-GR-SP
Run Logs : BHC-GR-SP
Run Logs : CBL-VDL-CCL-GR (Not CET included)
Run Logs : CBL-VDL-CET-CCL-GR

Run Logs : LDL-CNL-GR


Run Logs : CNL-GR
Run Logs : DSI-GR
Run Totco Survey

----------------------------------- TRIP -----------------------------------Round Trip and clean the bit


Short Trip condition hole for 26" Drilling
Short Trip condition hole for 17.5" Drilling
Short Trip condition hole for 12.25" Drilling
Short Trip condition hole for 8.5" Drilling
Short Trip condition hole for 6" Drilling
Wiper Trip condition hole

------------------------------- STAND UP ------------------------------Stand up -5 stands DP ( -50 m), Prepare for RIH 17.1/2", Rate 10 mnt/std
Stand up 10 stands DP ( 280 m), Prepare for RIH 12.1/4", Rate 10 mnt/std
Stand up 7 stands DP ( 183 m), Prepare for RIH 8.1/2", Rate 10 mnt/std

--------------------------- DAN LAIN-LAIN ---------------------------Wait On Cement


Wait On Cement (incl : L/D over flow dan flow line)
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Mud Off Test
Production Test
Perforation
Rig Down Top Drive
Rig Release & R/D Rig
Coring Job
Fishing Job

DATA REFERENCE
ACTIVITY
SESSION

CODE

OH SIZE
(INCH)

CASING SIZE
(INCH)

DEPTH (MMD)

#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A

#N/A
30
20
#N/A
13 3/8
13 3/8
#N/A
9 5/8
9 5/8
#N/A
7
7

0
0
#N/A
0
70
#N/A
0
350
#N/A
0
533

4 1/2
7
4 1/2
#N/A

0
533
0
#N/A

Not Specific
Not Specific

1a
1a

36" OH
26" OH

2a
2a

36
26

17.1/2" OH
17.1/2" OH

2a
2a

17 1/2
17 1/2

12.1/4" OH
12.1/4" OH

2a
2a

12 1/4
12 1/4

8.1/2" OH
8.1/2" OH

2a
2a
2a

8 1/2
8 1/2

6" OH
Completion
Completion
Not Specific

2a
2a
2a
2a

6
8 1/2
6

Not Specific
Not Specific
Not Specific
Not Specific
Not Specific
Completion

5b
5b
5a
5a
5a
5b

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

15a
15a
15a
15a
15a
15a
15a
15a
15b
15b

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

36" OH
26" OH
Not Specific
Completion
36" OH
26" OH
Not Specific
Completion
26" OH
17.1/2" OH

Not Specific
Completion
36" OH
26" OH

15b
15b
15b
15b

#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A

26" OH
17.1/2" OH
12.1/4" OH
Completion
Completion

16a
16a
16a
16a
16a

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

36" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
8.1/2" OH
6" OH

6a
6a
6a
6a
6a
6a
6b
6b
6b
6b
6a
6a
6a
6a
13b
13b

#N/A
30
20
13 3/8
9 5/8
7
4 1/2
9 5/8
7
7
4 1/2
7
4 1/2
7
4 1/2
7
4 1/2

#N/A
0
0
70
350
533
0
350
533
533
0
533
0
533
0
533
0

36" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH
Not Specific
Completion

12a
12a
12a
12a
12a
6a
6a
6a
6a
6a
6a
6a
6a
6a
11a
11a

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

36" OH
26" OH

6a
6a

#N/A
30
20

#N/A
0
0

36
26
17 1/2
12 1/4
8 1/2
6
12 1/4
8 1/2
8 1/2
6
8 1/2
6
8 1/2
6
8 1/2
6

36
26

17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH
Completion
Completion
Completion
Completion
Completion
Completion

6a
6a
6a
6a
6a
6a
6a
6a
6a
6a

17 1/2
12 1/4
8 1/2
6
8 1/2
6
8 1/2
6
8 1/2
6

13 3/8
9 5/8
7
4 1/2
7
4 1/2
7
4 1/2
7
4 1/2

70
350
533
0
533
0
533
0
533
0

8.1/2" OH
6" OH
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion
Completion

6d
6d
6d
6d
6d
6d
6d
6d
6d
17a
17a
17a
17a

12 1/4
8 1/2
8 1/2
6
12 1/4
8 1/2
8 1/2
6
6
8 1/2
8 1/2
6
6

9 5/8
7
7
4 1/2
9 5/8
7
7
4 1/2
4 1/2
7
7
4 1/2
4 1/2

350
533
533
0
350
533
533
0
0
533
533
0
0

36
26
26
17 1/2
12 1/4
8 1/2
8 1/2
6

#N/A
30
20
20
13 3/8
9 5/8
7
7
4 1/2

#N/A
0
0
0
70
350
533
533
0

36" OH
26" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
8.1/2" OH
6" OH

12b
12b
12b
12b
12b
12b
12b
12b

36" OH
26" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
8.1/2" OH

13b
13b
13b
13b
13b
13b
13b

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

11b
11b
11b
11b
11b

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

Not Specific
Not Specific
Not Specific
Not Specific
Not Specific

Not Specific
Not Specific
Not Specific
Not Specific

11b
11b
11b
2a

#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A

36" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH

6a
6a
6a
6a
6a
6a
6a

36
26
17 1/2
12 1/4
8 1/2
6

#N/A
30
20
13 3/8
9 5/8
7
4 1/2
#N/A
#N/A

#N/A
0
0
70
350
533
0
#N/A
#N/A

6d

17 1/2

13 3/8

70

6d

12 1/4

9 5/8

350

6d

8 1/2

7
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

533
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

17.1/2" OH
12.1/4" OH
8.1/2" OH

Not Specific
Not Specific
Not Specific
Not Specific
Not Specific
Completion
Completion
Completion
Completion
8.1/2" OH
8.1/2" OH

14
14
5b
13a
2c
17b
11b
6b

20

NCE

DRILLING TIME
DRILLING RATE
(M/DAYS)

#N/A
#N/A
#N/A
#N/A

STANDARD

ADJUSTING

TOTAL

DEPTH for
'Drilling Time'

120.00
48.00

0.00
120.00
48.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
8.40

5.00

0.00
13.40

0.00
70.00

0.00
33.60

6.00

0.00
39.60

0.00
350.00

0.00
29.28
10.00

0.00
29.28
10.00

0.00
533.00
0.00

0
150
0
#N/A

0.00
1.00
1.00
8.00

0.00
1.00
1.00
8.00

0.00

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

2.00
2.00
2.00
2.00
2.00
4.00

0.00
2.00
2.00
2.00
2.00
2.00
4.00

6.00
6.00
4.00
6.00
6.00
5.00
8.00
6.00
1.00
1.00

0.00
6.00
6.00
4.00
6.00
6.00
5.00
8.00
6.00
1.00
1.00

#N/A
0
0
#N/A
200
200
#N/A
200
200
#N/A
150
150

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A

2.00
2.00
1.00
1.00

2.00
2.00
1.00
1.00

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

5.00
10.00
4.00
6.00
6.00

0.00
5.00
22.00
4.00
6.00
6.00

#N/A
0
0
200
200
150
0
200
150
150
0
150
0
150
0
150
0

0.00
0.00
0.21
1.04
1.59
0.00
0.83
1.38
1.53
-0.06
0.83
1.38
1.53
-0.06
1.38
-0.21

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

1.50
1.50
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00

0.00
1.50
1.50
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
2.00

#N/A
0
0

0.00
0.00

0.00
0.00
0.00

12.00

3.50

0.00
0.00
0.00
0.21
1.04
1.59
0.00
0.83
1.38
1.53
-0.06
0.83
1.38
1.53
-0.06
1.38
3.29

200
200
150
0
150
0
150
0
150
0

0.00
0.21
1.04
1.59
0.83
1.38
5.53
-0.06
1.59
0.00

200
150
150
0
200
150
150
0
0
150
150
0
0

0.83
1.38
1.53
-0.06
1.67
2.76
3.05
-0.12
-0.12
2.53
4.05
0.94
0.88

0.83
1.38
1.53
-0.06
1.67
2.76
3.05
-0.12
-0.12
2.53
4.05
0.94
0.88

#N/A
0
0
0
200
200
150
150
0

0.00
0.00
1.50
0.86
4.30
6.55
3.94
-4.31

0.00
0.00
0.00
1.50
0.86
4.30
6.55
3.94
-4.31

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

3.00
3.00
4.00
4.00
5.00
6.00
6.00

0.00
3.00
3.00
4.00
4.00
5.00
6.00
6.00

5.00
5.00
5.00
6.00
6.00

0.00
5.00
5.00
5.00
6.00
6.00

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

1.00

1.00
0.21
1.04
1.59
0.83
1.38
5.53
-0.06
1.59
0.00

#N/A
#N/A
#N/A
#N/A

5.00
5.00
8.00
0.50

5.00
5.00
8.00
0.50

#N/A
0
0
200
200
150
0
#N/A
#N/A

2.00
0.00
0.42
1.67
1.09
-3.17
2.38

0.00
2.00
0.00
1.42
2.67
2.50
-3.17
2.38
0.00

200

-0.77

-0.77

200

1.67

1.67

150
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

1.09

1.09

8.00
12.00
2.00
2.00
1.00
24.00
5.00
24.00
72.00

8.00
12.00
2.00
2.00
1.00
24.00
6.00
24.00
72.00
0.00
0.00
120.00
0.00
0.00
0.00
0.00

120.00

1.00
1.00
1.41

1.00

FORMULA

V
V
V
V
V
V
V
V
V
V

Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick
Rate 75 m/day karena sudah termasuk perhitungan loss time akibat atasi loss dan kick

V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V

V
V

Include L/D some DP 5"

V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V

V
V
V
V
V
V

V
V
V

DATA CHARACTER : database3


Drilling 36"
Non Drilling 36"
Drilling 26"
Non Drilling 26"
Drilling 17.5"
Non Drilling 17.5"
Drilling 12.25"
Non Drilling 12.25"
Drilling 8.5"

Non Drilling 36"

Non Drilling 8.5"


Drilling 6"
Non Drilling 6"
Cement Production Casing
Completion Session
Production Test

DATA CHARACTER : database4


PRE SPUD SESSION
36" DRILLING SESSION
26" DRILLING SESSION
17.1/2" DRILLING SESSION
12.1/4" DRILLING SESSION
8.1/2" DRILLING SESSION
6" DRILLING SESSION
COMPLETION
DATA CHARACTER :
36
26
17 1/2
12 1/4
8 1/2
6

DATA CHARACTER :
36" OH
26" OH
17.1/2" OH
12.1/4" OH
8.1/2" OH
6" OH
Completion
Not Specific

si loss dan kick


si loss dan kick

PERTAMINA DRILLING ACTIVITIES CODE DESCRIPTION


IADC Code

Description

Rig Up and Tear Down

Drilling Actual

3
4

Reaming
Coring

Circulation

Trips

7
8
9
10
11

Lubricate Rig
Repair Rig
Cut off Drilling Line
Deviation Survey
Wireline Logs

12

Run Casing

13

Cement

14
15

Wait on Cement
N/U BOP & N/D BOP

16

N/U Well Head

Sub code

Description

a
b
a
b
c

Rig Up
Tear Down
Drill actual
SPR
MOT or LOT

a
b
a
b
a
b
c
d

Persiapan
Coring Job
Circulate Hole Clean
Condition Mud
Drilling BHA
Others BHA
Prepare BHA
Stand Up or L/D

Status

NPT

NPT

a
b
a
b
a
b

Persiapan
Logs
Persiapan
Run casing job
Persiapan
Cementing jobs

a
b
a

N/U BOP & N/D BOP


BOP TEST
N/U Wellhead

17

DRIL STEM TEST

18
19
20

Cement Plug Back


Squeeze Cement
Down hole Problem

21

Surface Problem

22
22

Drills
Others

a
b

Persiapan
DST Job

a
b
c
d
e
a
b
c
d
e
f
g
h

combating loss
Gumbo problems
pipe sticking
Fishing job
well control situation
Mud company
Cementing company
Logging Company
Directional company
Top Drive
Operator Material/tools
weather
location repair

NPT starts whenever normal operation cease and there is no drilling progress
REFERENCE : IADC CODE

NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT
NPT

LING ACTIVITIES CODE DESCRIPTION


Details

Bor formasi, Bor semen, Bor collar


start from pressure testing line until job done
at depth bit start taking weight until actial drilling depth
M/U tools
RIH coring tools, circulate, Coring Job, POOH, Job completed
condition mud before cementing, increase SG
circulate before POOH
for RIH and POOH BHA drilling only
for others BHA example : scrapper, Open end, etc

Rig repair (include Pull out BHA to shoe waiting for repair)
RIH totco or GYRO and POOH survey by sand line
M/U logging tools, wheels, PCE and pressure test
RIH logging tools, Log Up and POOH
M/U casing running gears
RIH Casing to bottom
M/U cementing line, R/U cementing head, mixing additives, pressure test
start pumping spacer until bumping and bleed off.
No other job done in this phase

Cut off casing, welding, test etc

M/U DST tools


RIH DST tools, set packer, DST Job, POOH, Job completed
start pumping spacer until before POOH.
start pumping spacer until before POOH.
start pumping LCM pills, wait on reaction, etc. (if Using OE start from POOH bit and RIH OE)
circulate gumbo out
start pumping pipe freeing agent, wait on reaction, until pipe free
start running fishing tools until POOH (not incuded in trips because NPT)
start closing BOP, killing process unttil open BOP
wait on material, tools, etc
wait on material, tools, rig up tools too long, pressure test not success
wait on material, tools, rig up tools too long, pressure test not success
wait on material, tools, rig up tools too long, shallow test not success
wait on material, tools, rig up tools too long, running test not success
wait on Pertamina's material, tools, employee or labour
wait due to bad weather
wait due to bad location
Fire drill, H2S drill, safety drill, BOP drill

Rig Up, including Stand-up 5" DP and 8" DC.


Rig Up Top Drive M/U BHA dan Bit 26".
36" DRILLING SESSION
Drilling Formation 26" to Csg Point at 80 m, ROP 75 m/days
Circulate hole clean
Round Trip and clean the bit
Circulate hole clean and drop Survey.
POOH 26" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 20" Conductor Casing
RIH Casing 20", incl. RIH Tubing, rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 20" casing (include POOH Tubing 2 7/8")
Wait On Cement
Nipple Up Bottom Flange 20", (incl : welded & inspection)
Nipple Up Diverter 20". (incl : Welded & inspection)
Function Test Diverter 20"

1a
1a

120
48
0
2a
25.6
5a
2
6a
2
5a
2
6a 0.2380952381
12a
1.5
12b 2.4824561404
5b
2
13a
2
13b
4
14
8
16a
5
15a
5
15b
1

26" DRILLING SESSION


Drilling Formation 26" to Csg Point at 80 m, ROP 75 m/days
Prepare Non Directional BHA + 17 1/2" Bit
RIH Bit 17 1/2" to tag TOC, rate 5 mnt/std
Circulate conditioning mud
Pressure Test Diverter 20"
Drilling Formation 17 1/2" to KOP at 110 m, ROP 200 m/days
Drilling Formation 17 1/2" to Csg Point at 656 m, ROP 200 m/days
Circulate hole clean at bottom
Short Trip condition hole for 17.5" Drilling
Circulate hole clean and drop Survey.
POOH 17 1/2" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 13 3/8" Casing
RIH Casing 13 3/8", rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 13.3/8" Casing
Wait On Cement
Cut 20" casing and N/D Diverter 20"
Nipple Up Bottom Flange 13-5/8" (incl: cut excess casing, )
Nipple Up BOP 13.5/8" x 5.000 psi
Pressure Test BOP 13.5/8" x 5.000 psi

2a 2.7142857143
6a
2
6a
1
5b
2
15b
1
2a
3.6
2a
65.52
5a
2
6a 3.4285714286
5a
2
6a 1.9523809524
12a
1
12b 8.0561403509
5b
2
13a
2
13b
4
14
8
15a
6
16a
10
15a
8
15b
2

17.1/2" DRILLING SESSION


Stand up 13 stands DP ( 361 m), Prepare for RIH 12.1/4", Rate 10 mnt/std
Prepare Directional BHA + 12 1/4" Bit
RIH Bit 12 1/4" to tag TOC, rate 5 mnt/std
Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.
Circulate conditioning mud
Mud Off Test
Drilling Formation 12.25" to Csg Point at 1013 m, ROP 200 m/days

6d
6a
6a
2a
5b
2c
2a

2.125
2
1.9523809524
8
2
1
48.84

Circulate hole clean at bottom


Short Trip condition hole for 12.25" Drilling
Circulate hole clean at bottom
POOH 12 1/4" Bit from Csg Point & L/D BHA
Prepare casing handling tools to run 9 5/8" Casing
RIH Casing 9 5/8", rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 9.5/8" Casing
Wait On Cement
Nipple Down BOP 13 5/8" x 5.000 psi
Nipple Up Casing Head Spool 11"
Nipple Up BOP 13.5/8" x 5.000 psi
Pressure Test BOP 13.5/8" x 5.000 psi

5a
2
6a
2.125
5a
2
6a 3.0148809524
12a
1
12b 12.440350877
5b
2
13a
2
13b
5
14
8
15a
4
16a
4
15a
8
15b
2

12.1/4" DRILLING SESSION


Stand up 13 stands DP ( 361 m), Prepare for RIH 8.1/2", Rate 10 mnt/std
Prepare Non Directional BHA + 8 1/2" Bit
RIH Bit 8 1/2" to tag TOC, rate 5 mnt/std
Drill out Plug, collar, cement, shoe and 2 mtrs of new formation.
Circulate conditioning mud
Mud Off Test
Drilling Formation 8.5" to Csg Point at 1374 m, ROP 200 m/days
Circulate hole clean at bottom
Short Trip condition hole for 8.5" Drilling
Circulate hole clean at bottom
POOH 8 1/2" Bit from Csg Point & L/D BHA
Prepare logging tools
Run Logs : DSI-GR
Run Logs : LDL-CNL-GR
Run Logs : LDL-CNL-GR

6d 2.1488095238
6a
2
6a 3.0148809524
2a
8
5b
2
2c
1
2a
67.32
5a
2
6a
2.5
5a
2
6a 4.0892857143
11a
1
11b
8
11b
5
11b
5

8.1/2" DRILLING SESSION


0
0
0
0
0
0
0
0
0
0
0
0
0
6" DRILLING SESSION
RIH 9-5/8" Scrapper to tag TOL 7"
POOH 9 5/8" Scrapper from TOL 7" & L/D BHA
RIH Bit 8 1/2" to condition hole to Bottom, rate 5 mnt/std
Circulate hole clean
POOH 8 1/2" Bit from Csg Point & L/D BHA

6d
6b
6a
5a
6a

0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.806547619
2.806547619
4.0892857143
2
4.0892857143

Prepare casing handling tools to run 7" Casing/Liner


RIH Liner 7" with DP, rate 7 mnt/std
M/U Cementing Head. Circulate Condition Mud using Rig Pump
M/U Cementing Line. Continue mixing cement additives
Cement 7" Liner & Set Liner.
POOH and L/D 7" Liner setting tool
RIH Bit 8 1/2" to tag Top Liner 7", rate 5 mnt/std
Drill Out cement to top liner 7"
Circulate hole clean
POOH 8 1/2" Bit from TOL 7" & L/D BHA
RIH Bit 6" + DP 3.1/2" to tag Landing Collar 7", rate 5 mnt/std
Circulate hole clean
POOH 6" Bit from Landing Collar 7" & L/D BHA
Rig Down Top Drive
Nipple Down BOP 13 5/8" x 5.000 psi
Nipple Up Tubing Head Spool 11" x 7-1/16"
Nipple Up BOP 7-1/16" x 5.000 psi
RIH 7" Scrapper w/ Tubing jts/jts to tag Landing Collar, Rate 10 min/jt
Circulate and change over to Completion Fluid
POOH 7" Scrapper from Landing Collar 7" & L/D BHA
Prepare logging tools
Run Logs : CBL-VDL-CET-CCL-GR
Prepare Perforation Tools
Perforation
RIH Prod String 2.7/8" Tubing to 7" Prod Csg, not joint/joint, incl. set packer
Nipple Down BOP 7-1/16" x 5.000 psi
Nipple Up X-masstree
Production Test
COMPLETION
Rig Release & R/D Rig

12a
12b
5b
13a
13b
13b
6a
2a
5a
6a
6a
5a
6a
6b
15a
16a
15a
6d
5b
6b
11a
11b
11a
11b
17a
15a
16a
17b

2
8.0995300752
2
2
6
3.880952381
2.806547619
1
2
2.806547619
8.0297619048
2
4.0297619048
24
4
6
6
8.0595238095
4
4.0297619048
1
6
2
5
5.0297619048
6
6
24

72

31.00
TOTAL
5
5
2
7
0
7
1.0666666667 8.0666666667
0.0833333333
8.15
0.0833333333 8.2333333333
0.0833333333 8.3166666667
0.0099206349 8.3265873016
0.0625 8.3890873016
0.1034356725 8.4925229741
0.0833333333 8.5758563074
0.0833333333 8.6591896408
0.1666666667 8.8258563074
0.3333333333 9.1591896408
0.2083333333 9.3675229741
0.2083333333 9.5758563074
0.0416666667 9.6175229741
9.6175229741
9.6175229741
0.1130952381 9.7306182122
0.0833333333 9.8139515455
0.0416666667 9.8556182122
0.0833333333 9.9389515455
0.0416666667 9.9806182122
0.15 10.130618212
2.73 12.860618212
0.0833333333 12.943951546
0.1428571429 13.086808688
0.0833333333 13.170142022
0.0813492063 13.251491228
0.0416666667 13.293157895
0.3356725146 13.628830409
0.0833333333 13.712163743
0.0833333333 13.795497076
0.1666666667 13.962163743
0.3333333333 14.295497076
0.25 14.545497076
0.4166666667 14.962163743
0.3333333333 15.295497076
0.0833333333 15.378830409
15.378830409
15.378830409
0.0885416667 15.467372076
0.0833333333 15.550705409
0.0813492063 15.632054616
0.3333333333 15.965387949
0.0833333333 16.048721282
0.0416666667 16.090387949
2.035 18.125387949

842,011.00
842,011.00
842,011.00
905,544.13
909,990.08
914,436.02
918,881.97
919,411.25
922,745.71
989,987.21
994,433.15
998,879.10
1,038,844.16
1,056,627.95
1,067,742.82
1,078,857.69
1,081,080.66
1,081,080.66
1,081,080.66
1,087,114.45
1,091,560.40
1,110,757.37
1,115,203.32
1,117,426.29
1,125,429.00
1,305,787.64
1,310,233.59
1,317,855.21
1,322,301.16
1,326,641.25
1,328,864.22
1,474,447.11
1,478,893.06
1,483,339.01
1,582,043.50
1,599,827.29
1,613,165.13
1,660,218.87
1,678,002.66
1,682,448.60
1,682,448.60
1,682,448.60
1,687,172.42
1,691,618.37
1,710,573.46
1,728,357.25
1,732,803.20
1,735,026.17
1,901,891.81

842,011.00
63,533.13
4,445.95
4,445.95
4,445.95
529.28
3,334.46
67,241.49
4,445.95
4,445.95
39,965.06
17,783.79
11,114.87
11,114.87
2,222.97
6,033.79
4,445.95
19,196.97
4,445.95
2,222.97
8,002.71
180,358.64
4,445.95
7,621.62
4,445.95
4,340.09
2,222.97
145,582.89
4,445.95
4,445.95
98,704.49
17,783.79
13,337.84
47,053.74
17,783.79
4,445.95
4,723.82
4,445.95
18,955.09
17,783.79
4,445.95
2,222.97
166,865.64

CSG

CSG ACCSTBG

58,503

3,220

123,742

3,932

WH

24,824

0.0833333333 18.208721282
0.0885416667 18.297262949
0.0833333333 18.380596282
0.1256200397 18.506216322
0.0416666667 18.547882989
0.5183479532 19.066230942
0.0833333333 19.149564275
0.0833333333 19.232897609
0.2083333333 19.441230942
0.3333333333 19.774564275
0.1666666667 19.941230942
0.1666666667 20.107897609
0.3333333333 20.441230942
0.0833333333 20.524564275
20.524564275
20.524564275
0.0895337302 20.614098005
0.0833333333 20.697431339
0.1256200397 20.823051378
0.3333333333 21.156384712
0.0833333333 21.239718045
0.0416666667 21.281384712
2.805 24.086384712
0.0833333333 24.169718045
0.1041666667 24.273884712
0.0833333333 24.357218045
0.1703869048 24.52760495
0.0416666667 24.569271617
0.3333333333 24.90260495
0.2083333333 25.110938283
0.2083333333 25.319271617
25.319271617
25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
0 25.319271617
25.319271617
0 25.319271617
0.1169394841 25.436211101
0.1169394841 25.553150585
0.1703869048 25.72353749
0.0833333333 25.806870823
0.1703869048 25.977257728

1,906,337.76
1,911,061.58
1,915,507.53
1,922,209.53
1,924,432.50
2,114,245.54
2,118,691.49
2,123,137.44
2,245,073.96
2,262,857.75
2,271,749.65
2,280,641.54
2,298,425.33
2,302,871.28
2,302,871.28
2,302,871.28
2,307,648.03
2,312,093.98
2,329,576.98
2,347,360.77
2,351,806.71
2,354,029.69
2,549,183.98
2,553,629.93
2,559,187.36
2,563,633.31
2,572,723.68
2,574,946.66
2,592,730.45
2,603,845.32
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,684,512.03
2,690,750.91
2,696,989.79
2,706,080.16
2,710,526.11
2,719,616.49

4,445.95
4,723.82
4,445.95
6,702.00
2,222.97
189,813.04
4,445.95
4,445.95
121,936.53
17,783.79
8,891.89
8,891.89
17,783.79
4,445.95
4,776.75
4,445.95
17,483.00
17,783.79
4,445.95
2,222.97
195,154.29
4,445.95
5,557.43
4,445.95
9,090.37
2,222.97
17,783.79
11,114.87
80,666.71
6,238.88
6,238.88
9,090.37
4,445.95
9,090.37

128,132

34,026

0.0833333333 26.060591061
0.3374804198 26.398071481
0.0833333333 26.481404814
0.0833333333 26.564738147
0.25 26.814738147
0.1617063492 26.976444497
0.1169394841 27.093383981
0.0416666667 27.135050647
0.0833333333 27.218383981
0.1169394841 27.335323465
0.3345734127 27.669896878
0.0833333333 27.753230211
0.167906746 27.921136957
1 28.921136957
0.1666666667 29.087803624
0.25 29.337803624
0.25 29.587803624
0.3358134921 29.923617116
0.1666666667 30.090283782
0.167906746 30.258190528
0.0416666667 30.299857195
0.25 30.549857195
0.0833333333 30.633190528
0.2083333333 30.841523862
0.2095734127 31.051097274
0.25 31.301097274
0.25 31.551097274
1 32.551097274
32.551097274
32.551097274
3 35.551097274

2,724,062.43
2,836,702.19
2,841,148.14
2,845,594.08
2,924,968.17
2,933,595.43
2,939,834.31
2,942,057.29
2,946,503.23
2,952,742.11
2,973,337.06
2,977,783.01
2,986,741.07
3,040,092.44
3,048,984.33
3,062,322.17
3,075,660.02
3,093,576.13
3,102,468.02
3,111,426.08
3,113,649.05
3,144,855.32
3,149,301.27
3,200,336.14
3,247,524.41
3,260,862.25
3,293,551.10
3,719,526.70
3,719,526.70
3,719,526.70
4,144,558.00

4,445.95
112,639.76
4,445.95
4,445.95
79,374.09
8,627.26
6,238.88
2,222.97
4,445.95
6,238.88
20,594.95
4,445.95
8,958.05
53,351.37
8,891.89
13,337.84
13,337.84
17,916.11
8,891.89
8,958.05
2,222.97
31,206.27
4,445.95
51,034.87
47,188.27
13,337.84
32,688.84
425,975.60
425,031.30
4,144,558.00
4,144,558.00
0.00

68,135

26,500

29,109

X-TREE

SS

SURVEY LOKASI
1,623

5,687
TELKOM WS

494,000

109,496

195.6757
15.28716
15.28716
15.28716
1.8199
11.46537
18.97486
15.28716
15.28716
30.57432
61.14865
38.21791
38.21791
7.643581
0
0
20.74686
15.28716
7.643581
15.28716
7.643581
27.51689
500.8074
15.28716
26.20656
15.28716
14.92318
7.643581
61.57776
15.28716
15.28716
30.57432
61.14865
45.86149
76.43581
61.14865
15.28716
0
0
16.24261
15.28716
14.92318
61.14865
15.28716
7.643581
373.3125

MIRU

715,105
339,661
RIG
MUD
PAHAT

193,875

24605.7634
1922.32527
1922.32527
1922.32527
228.848246
1441.74395
2386.04408
1922.32527
1922.32527
3844.65054
7689.30108
4805.81317
4805.81317
961.162634
0
0
2608.87001
1922.32527
961.162634
1922.32527
961.162634
3460.18548
62975.3758
1922.32527
3295.41475
1922.32527
1876.55562
961.162634
7743.26108
1922.32527
1922.32527
3844.65054
7689.30108
5766.97581
9611.62634
7689.30108
1922.32527
0
0
2042.4706
1922.32527
1876.55562
7689.30108
1922.32527
961.162634
46943.1831

11687.27
913.067972
913.067972
913.067972
108.698568
684.800979
1133.3256
913.067972
913.067972
1826.13594
3652.27189
2282.66993
2282.66993
456.533986
0
0
1239.16368
913.067972
456.533986
913.067972
456.533986
1643.52235
29912.1068
913.067972
1565.25938
913.067972
891.328258
456.533986
3677.90187
913.067972
913.067972
1826.13594
3652.27189
2739.20392
4565.33986
3652.27189
913.067972
0
0
970.13472
913.067972
891.328258
3652.27189
913.067972
456.533986
22297.1199

6,625

16,974

14,615

15.28716
16.24261
15.28716
23.04449
7.643581
95.08883
15.28716
15.28716
38.21791
61.14865
30.57432
30.57432
61.14865
15.28716
0
0
16.4246
15.28716
23.04449
61.14865
15.28716
7.643581
514.5659
15.28716
19.10895
15.28716
31.25679
7.643581
61.14865
38.21791
38.21791
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
21.45207
21.45207
31.25679
15.28716
31.25679

1922.32527
2042.4706
1922.32527
2897.79092
961.162634
11957.2004
1922.32527
1922.32527
4805.81317
7689.30108
3844.65054
3844.65054
7689.30108
1922.32527
0
0
2065.35542
1922.32527
2897.79092
7689.30108
1922.32527
961.162634
64705.4685
1922.32527
2402.90659
1922.32527
3930.46863
961.162634
7689.30108
4805.81317
4805.81317
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2697.5487
2697.5487
3930.46863
1922.32527
3930.46863

913.067972
970.13472
913.067972
1376.39562
456.533986
5679.44297
913.067972
913.067972
2282.66993
3652.27189
1826.13594
1826.13594
3652.27189
913.067972
0
0
981.004577
913.067972
1376.39562
3652.27189
913.067972
456.533986
30733.8679
913.067972
1141.33496
913.067972
1866.89791
456.533986
3652.27189
2282.66993
2282.66993
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1281.28437
1281.28437
1866.89791
913.067972
1866.89791

10,781

6,898
19,351

15.28716
61.90942
15.28716
15.28716
45.86149
29.66437
21.45207
7.643581
15.28716
21.45207
61.37614
15.28716
30.80181
183.4459
30.57432
45.86149
45.86149
61.60363
30.57432
30.80181
7.643581
45.86149
15.28716
38.21791
38.44539
45.86149
45.86149
183.4459
0

1922.32527
7784.96566
1922.32527
1922.32527
5766.97581
3730.22641
2697.5487
961.162634
1922.32527
2697.5487
7717.90711
1922.32527
3873.25657
23067.9032
3844.65054
5766.97581
5766.97581
7746.51314
3844.65054
3873.25657
961.162634
5766.97581
1922.32527
4805.81317
4834.4192
5766.97581
5766.97581
23067.9032

913.067972
3697.71075
913.067972
913.067972
2739.20392
1771.78666
1281.28437
456.533986
913.067972
1281.28437
3665.85921
913.067972
1839.72326
10956.8157
1826.13594
2739.20392
2739.20392
3679.44653
1826.13594
1839.72326
456.533986
2739.20392
913.067972
2282.66993
2296.25725
2739.20392
2739.20392
10956.8157

2,745

273,319
eq rent
dd

22,463
ceent

mlu

30,812
oh

cmt

csh

spv
33,889

9404.52346
734.728395
734.728395
734.728395
87.4676661
551.046296
911.965508
734.728395
734.728395
1469.45679
2938.91358
1836.82099
1836.82099
367.364198
0
0
997.131393
734.728395
367.364198
734.728395
367.364198
1322.51111
24069.7022
734.728395
1259.53439
734.728395
717.234862
367.364198
2959.53754
734.728395
734.728395
1469.45679
2938.91358
2204.18519
3673.64198
2938.91358
734.728395
0
0
780.64892
734.728395
717.234862
2938.91358
734.728395
367.364198
17942.0674

31,073

34,709

89,813

58,296

772.92
60.38
60.38
60.38
7.19
45.29
74.95
60.38
60.38
120.77
241.54
150.96
150.96
30.19
81.95
60.38
30.19
60.38
30.19
108.69
1,978.19
60.38
103.52
60.38
58.95
30.19
243.23
60.38
60.38
120.77
241.54
181.15
301.92
241.54
60.38
64.16
60.38
58.95
241.54
60.38
30.19
1,474.59

1,060.20
82.83
82.83
82.83
9.86
62.12
102.81
82.83
82.83
165.66
331.31
207.07
207.07
41.41
112.41
82.83
41.41
82.83
41.41
149.09
2,713.45
82.83
141.99
82.83
80.86
41.41
333.64
82.83
82.83
165.66
331.31
248.48
414.14
331.31
82.83
88.00
82.83
80.86
331.31
82.83
41.41
2,022.67

734.728395
780.64892
734.728395
1107.55932
367.364198
4570.13952
734.728395
734.728395
1836.82099
2938.91358
1469.45679
1469.45679
2938.91358
734.728395
0
0
789.395686
734.728395
1107.55932
2938.91358
734.728395
367.364198
24730.9578
734.728395
918.410494
734.728395
1502.25716
367.364198
2938.91358
1836.82099
1836.82099
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1031.02511
1031.02511
1502.25716
734.728395
1502.25716

110,822

45,504

60.38
64.16
60.38
91.03
30.19
375.60
60.38
60.38
150.96
241.54
120.77
120.77
241.54
60.38
64.88
60.38
91.03
241.54
60.38
30.19
2,032.54
60.38
75.48
60.38
123.46
30.19
241.54
150.96
150.96
84.74
84.74
123.46
60.38
123.46

69,552

82.83
88.00
82.83
124.86
41.41
515.21
82.83
82.83
207.07
331.31
165.66
165.66
331.31
82.83
88.99
82.83
124.86
331.31
82.83
41.41
2,788.00
82.83
103.54
82.83
169.35
41.41
331.31
207.07
207.07
116.23
116.23
169.35
82.83
169.35

734.728395
2975.47737
734.728395
734.728395
2204.18519
1425.72296
1031.02511
367.364198
734.728395
1031.02511
2949.84704
734.728395
1480.39025
8816.74074
1469.45679
2204.18519
2204.18519
2960.7805
1469.45679
1480.39025
367.364198
2204.18519
734.728395
1836.82099
1847.75445
2204.18519
2204.18519
8816.74074

60.38
244.54
60.38
60.38
181.15
117.17
84.74
30.19
60.38
84.74
242.44
60.38
121.67
724.61
120.77
181.15
181.15
243.33
120.77
121.67
30.19
181.15
60.38
150.96
151.86
181.15
181.15
724.61

66,036

17,868
39,920

414,784

82.83
335.43
82.83
82.83
248.48
160.73
116.23
41.41
82.83
116.23
332.55
82.83
166.89
993.94
165.66
248.48
248.48
333.78
165.66
166.89
41.41
248.48
82.83
207.07
208.30
248.48
248.48
993.94

2,678

266,845
solar
9,129

9,181.77
717.33
717.33
717.33
85.40
537.99
890.37
717.33
717.33
1,434.65
2,869.30
1,793.32
1,793.32
358.66
973.51
717.33
358.66
717.33
358.66
1,291.19
23,499.60
717.33
1,229.70
717.33
700.25
358.66
2,889.44
717.33
717.33
1,434.65
2,869.30
2,151.98
3,586.63
2,869.30
717.33
762.16
717.33
700.25
2,869.30
717.33
358.66
17,517.10

717.33
762.16
717.33
1,081.33
358.66
4,461.89
717.33
717.33
1,793.32
2,869.30
1,434.65
1,434.65
2,869.30
717.33
770.70
717.33
1,081.33
2,869.30
717.33
358.66
24,145.20
717.33
896.66
717.33
1,466.68
358.66
2,869.30
1,793.32
1,793.32
1,006.60
1,006.60
1,466.68
717.33
1,466.68

717.33
2,905.00
717.33
717.33
2,151.98
1,391.95
1,006.60
358.66
717.33
1,006.60
2,879.98
717.33
1,445.33
8,607.91
1,434.65
2,151.98
2,151.98
2,890.65
1,434.65
1,445.33
358.66
2,151.98
717.33
1,793.32
1,803.99
2,151.98
2,151.98
8,607.91

89,488