Design-Built Permanent Soil

Nail Retaining Wall and Building


Foundations at the University of
Connecticut Health Center
Ulrich La Fosse, P.E.
GeoDesign, Inc.
Middlebury, CT
New York, NY
Windsor, VT

September 13, 2013

SITE

Site Locus

Bridging Documents
Foundations and Wall Types

ACC Building Drilled Shafts

Garage Spread Footings

Site Wall Behind Garage


Temporary SOE
Buttress Type Concrete Gravity Wall
Heights up to 55 feet & 450 feet long

GRAVITY WALL
24-Ft

Section

15-Ft
500-Ft

Bridging Docs Retaining Wall - Plan

GRAVITY WALL

Bridging Docs Retaining Wall - Section

TEMPORARY
SOE WALL

CONCRETE
GRAVITY
WALL

Bridging Docs Temporary SOE & Wall

Alternate Design Goals

Accelerate Construction

Eliminate work

Achieve economies

Meet Owner Criteria

Alternate Design Concept

Combine Temporary & Permanent


Support of Excavation
Replace Drilled Shafts with shallow
Foundations (ACC)
Maximize Foundation Pressures
(Garage & ACC)

Retaining Wall
Design Considerations

Sparse Subsurface Data


Very Tight Schedule for Design
Tall Wall (up to 55 feet High)
Wall Surcharge (1.5H:1V slope and
Road)
Bridge Abutment Loading
Combine Temporary & Permanent
Support of Excavation

SITE

Surficial Geology

Retaining Wall
Construction Considerations

Sparse Subsurface Data


Tall Wall (up to 55 feet)
Wall Surcharge (1.5H:1V slope and
Road)
Bridge Abutment Loading
Combine Temporary & Permanent
Support of Excavation

EXISTING 2H:1V SLOPE

Main Road and Traffic Surcharge

STEEP SLOPE ABOVE WALL

Retaining Wall
Performance Considerations

Must Limit Movement

Permanent Wall Considerations

Wall Finish Varying Opinions

Alternate Design Considerations


ACC Building

High Bearing Pressures Desirable


Variable Soil Conditions
Unsuitable Fill, over
Moderately dense Glacial Till, over
Dense to very Dense Till

Reworked Site Possible unexpected


variations and organics

10

Permanent Soil Nail Wall


Design

Partial Soil Wall Nail Plan

11

Typical Soil Nail Wall - Section

Typical Soil Nail Wall - Section

12

Typical Soil Nail Wall - Section

Typical Soil Nail Wall - Section

13

Typical Soil Nail Wall - Section

Partial Soil Nail Wall Elevation

14

CAPACITY OF TEMPORARY
FACING IS NEGLECTED IN FINAL DESIGN

Soil Nail Wall Detailed Section

Start of Wall Construction

15

16

17

DCP Soil Nails


and Temporary Shotcrete
Wall Facing

18

19

20

SLOUGHING SOILS

IT IS IMPERATIVE TO BE ABLE TO CONTROL WATER and SOILS


MUST BE ABLE TO STAND UNTIL SHOTCRETE HAS BEEN APPLIED

DRAINAGE, DRAINAGE, AND MORE DRAINAGE!

21

A DCP SURPRISE!

A SIMPLE SOLUTION TO THE VEXING


PROBLEM OF LACK OF DCP AT TOP OF NAIL

22

ANOTHER SURPRISE
AN UNEXPECTED STUMP DUMP!

23

Installation of Reinforcement for


Final Shotcrete Wall Facing

24

25

26

27

Application of Final Shotcrete


Wall Facing

28

Night Work to Meet


Project Schedule

29

Completed Wall

30

31

32

33

34

35

Micropile-Supported
Bridge Abutment
Directly Behind
Permanent Soil Nail Wall

36

37

38

Footing Preparation
at ACC Building

39

40

Thank You!
Questions?

41