( For Release of 90% Amount)

Andhra Pradesh Micro Irrigation Project (APMIP)


ANANTAPUR DISTRICT
FINAL INSPECTION REPORT OF MIAO / MIDC / MIE / MCO / APD

W. No.

HP121300104401303

MI Company NETAFIM
14

Drip / Sprinkler

Proc. No. ______ Date: 3.12.2013

Name of the Farmer : Sri / Smt. B Nelakantareddy


Contact No.

Village: Penkacharla

Area in Ha: 2.02

Crop :

Phase : XI th

Year: 2013-

S/o., W/o. B Pullareddy

Hamlet: Penkacharla

Batavia/Sweetorang

Mandal:Garladinne

No. of plants as per BMS

as per observation

__________________
Age of Plant ____ Row to Row spacing
Dripper Spacing:

0.40

Plant to Plant Spacing

No. of Drippers / Plant:

Lateral Single / Double :Singal

01

Source of Irrigation Drip: (Online / Inline)

Photo pertains to the Field : Yes / No. Date of Inspection : ___________ whether the farmer

received Administrative Sanctions : Yes / No.


S.No.

Item
1.

1.1

1.2
1.3

Filtration Unit
Screen Filter
Disc Fillter / Hydrocyclone filter
Sand Filter
Fertilizer tank / ventury
Non return valve

Quantity as per
BOQ
Head Control Unit
Size

Quantity observed in filed

Approved Brand or Not


Throttle valve
Approved brand or not
Air release & Vaccume braker valve
Pressure guage
Optional items
2. Water Carrier System
PVC for Main

1.4
1.5
1.6
1.7
2.1

2.2

PVC for Sub main

2.3

Control valve
Approved Brand or not
Flush Valve Approved brand or not
Water Distribution System
Lateral (16mm / 12 mm)
Drippers
Spaghetti

2.4
3.
3.1
3.2
3.3

No

Mtrs.

No.s

Mtrs.

No. of Bundles

No. of Mtrs.

No. of Bundles

No. of

Date of Installation : ________ Supplied a copy of Final Invoice / Field Design Map / Delivery Challan / Rythu
Dairy / Letter of Guarantee to farmer.
Remarks :
Amount Claimed : _________________
Amount Eligible : _________________
Signature of the FRepresentative of the farmer

Signature of the Inspecting Officer


Designation
Headquater :
(Seal)

<N>

LEG END

Name of the farmer :B Nelakantareddy


Spacing :
No. of Plants :
Age of Plants :
Actual area proposed :
Area Installed :
Signature of farmer: District Co-Ordinator: Inspecting Officer
M.I. Company.

PRIXIT INDUSTRIES LTD.


Annexure 10
IRRIGATION SYSTEM COMMISSIONING AND COMPLETION CERTIFICATE

1. Farmers Name & Aadhaar No.

2. Address

3. Name of Bank & Loan A/c. No.

4. Date of release of 10% 1st Installment & Amount

5. Location of Farm

6. Micro Irrigation System Details

MIS Supplier Name

M/s Parixit Industries Ltd.

Irrigation System Type

Inline / Online

Area Sanctioned in ha

Total Area Installed in ha

S.No.

Name of the Crop

Spacing

Area

Total
7. Material Supply Date

8. Installation Completion Date

9. Was the System Installed as per the Design Drawing

Yes / No

10. Was the Update Map handed over by MISS Supplier

Yes / No

11. Was entire material supplied as per Invoice / Estimate

Yes / No

It no, please provide details of short supply and / or discrepancies :


.
.
.
.
12. Was the System (Mains / Submains / Laterals) flushed before fixing the emitters : Yes / No
13. Was the system tested and found to be performing satisfactorily
14. Please provide following details of the system performance
Pressure at Head Control Inlet, kg / cm2

Pressure at Outlet of Head Control, kg/cm2

Pressure at Inlet of Submains, kg/cm2

Average Emitter Discharge, LPH

: Yes / No
:

lph

15. Please mention whether the following aspects of System Operations and Maintenance clearly
explained and demonstrated by the MIS Supplier to farmer
Flushing of Laterals
Flushing of Sub Mains
Cleaning the Filter element
Backwashing the sand filter
Operation of Fertigation Equipment
Procedure for Chemical Treatment
Procedure for Fertigation

Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No

Hereby certify that all the above information provided was true and complete to my knowledge.
1

Signature of farmer

Signature of MI Supplier

Signature of MIAO

Signature of Banker

Signature of inspecting officer nominated by

PD A.P.M.I.P
Date : ..

Location : ..
Acknowledgement

Received the copy of Commissioning & Completion Certificate on .. (date) from


M/s Parixit Industries Ltd.

Date:
Date :To, The Applicant and PD, APMIP.
Copy to the concerned Financing Agencyifany.

Signature of the farmer