Controlled Document
Scope of Work
Project
Document Title
Scope of Work
Document Number
SB-1000-VA-5793-0003
Document Revision
02
Document Status
Document Type
Scope of Work
Owner / Author
James Alexander
Issue Date
03-Feb-14
Expiry Date
None
ECCN
EAR 99
Security Classification
Restricted
Disclosure
None
SB-1000-VA-5793-0003
-2-
Restricted
Revision History
REVISION STATUS
APPROVAL
Rev.
Date
Description
Originator
Reviewer
Approver
01
02
16-Dec-13
3-Feb-04
J. Alexander
J. Alexander
See Below
R. Elston
R. Elston
All signed originals will be retained by the UA Document Control Center and an electronic copy will be stored in Livelink
Signature or electronic
reference (email)
Role
Name
Construction
Engineering
IM/IT
Quality
Wallace Hallum
HSSE/Technical Safety
Project Services
Operation Readiness/CSU
Environmental
APPROVER
Rob Elston
Summary
Scope of Work for Sierras Blancas/Cruz de Lorena Early Production Facility which is a subproject of
the SB/CdL Early Production System being executed by SHELL P&T Onshore Projects.
Keywords
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-3-
Restricted
Argentina, Sierras Blancas, Cruz de Lorena, Early Production Facility, EPF, Scope of Work
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-4-
Restricted
TABLE OF CONTENTS
EXECUTIVE SUMMARY .............................................................................................. 5
1.
2.
3.
4.
5.
6.
SCHEDULE...................................................................................................... 28
7.
8.
9.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-5-
Restricted
EXECUTIVE SUMMARY
The Early Production Facility is a centralized pilot facility handling production from
Sierras Blancas and Cruz de Lorena Blocks. Nameplate capacity is 10,000 barrels of oil
per day (bopd), 8MMSCFD gas, and 1,000 barrels of water per day (bwpd). Oil will be
separated, stabilized, stored, pumped, and metered prior to entering the oil export line.
Gas will be separated, compressed, dehydrated, and metered prior to entering the gas
export pipeline. Water will be separated, treated, filtered, and stored prior to being
injected into a nearby water disposal well. The scope of the EPF begins at the outlet of
the Gathering System and ends at the inlet of the export pipelines which will be a predefined surface flange near the edge of the EPF for oil and gas and at the flange of the
wing valve on the water disposal well.
Included in the scope of the EPF:
Civil Earthworks for EPF and access roads including civil engineering and design
Water disposal piping and instrumentation from EPF to Water Disposal Well
Firewater system
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-6-
Restricted
Onsite Communication Tower(s) for SCADA and IT from remote well pad facilities
Closed Circuit Televisions (CCTVs) for monitoring of remote well pad facilities
Operating procedures
Land Acquisition
Operations
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
1.
-7-
Restricted
PROJECT BACKGROUND
SHELL has interests in three onshore blocks in the Neuqun region of western Argentina as
shown in the figure 1 below:
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-8-
Restricted
2.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
-9-
Restricted
Define
ID #
Execute
ID #
Required for
Permit
Application
Document Name
Required for
HAZOP
Approved
by 1-Nov14
Issued for
Review by 1Nov-14
IFC
Project Management
338
1517
331
Constructability Report
179
346
1417
399
406
1258
395
462
Health, Safety, Security, Environment & Social Performance (HSSE & SP)
1615
1620
1613
457
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 10 -
Define
ID #
Execute
ID #
1616
1621
1413
449
Restricted
Required for
Permit
Application
Document Name
Required for
HAZOP
Approved
by 1-Nov14
Issued for
Review by 1Nov-14
IFC
x
Project Services
1387
1628
1404
1404.1
Quality Assurance
591
1433
355
1213
1497
1242
Equipment Listing
241
251
655
243
1214
x
x
249
1211
420
298.1
298.2
298.3
298.4
298.5
298.6
302
267
488
1219
487
1247
269
270
x
x
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
Define
ID #
Execute
ID #
1411
- 11 -
Restricted
Required for
Permit
Application
Document Name
Required for
HAZOP
Approved
by 1-Nov14
1411.1
1411.2
1411.3
1411.4
297
297.1
297.2
297.4
300
Issued for
Review by 1Nov-14
IFC
300.1
300.4
x
Electrical Engineering
238.1
1426.5.1
238.2
1525
238.3.2
1426.5.2
1426.5.4
1426.5.5
Grounding Layout
1426.7
1426.8
1426.9
1426.10
1426.11
Cable Schedule
1452.1
283
1426.3
278
1249
280
1426.1.2
245
1217
1399.1
x
x
1452
1641
1634
1639
1498
667
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 12 -
Restricted
Required for
Permit
Application
Define
ID #
Execute
ID #
257
1209
683
684
Document Name
Issued for
Review by 1Nov-14
IFC
Required for
HAZOP
Approved
by 1-Nov14
Rotating Equipment
1398.9
275
273
1435
1391
1449
1412
1220
238.504
238.505
Foundations design
238.506
238.509
238.512
Construction camps
238.513
Temporary facilities
238.514
238.516
288
x
Pipelines
1637
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
Define
ID #
Execute
ID #
- 13 -
Restricted
Required for
Permit
Application
Document Name
Required for
HAZOP
Approved
by 1-Nov14
Issued for
Review by 1Nov-14
IFC
Production Operations
414
1453
Alarm Catalogue
440
Operating Procedures
431
Miscellaneous
Vendor document requirement list
Drafting Standards
Containment Areas
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 14 -
Laydown areas
Major Equipment
Fencing
Restricted
Instrument transmitters and outlines of junction boxes, secure instrument air vessels;
panels and cabinets inclusive stands, safety critical sensors / switches
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 15 -
Restricted
o HSSE considerations
o Application of modules
o Procurement strategy
o Equipment inspection and release
o Logistics
o Draft plot plan
o Opportunities for modularization
o Equipment list and BOM with division of roles and responsibilities
o Contracting strategy
o Construction input for project execution strategy and project implementation
plans e.g. risks,
o Initial project schedule and estimate considerations
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 16 -
Restricted
o Develop project specific plot plan with equipment lay out, lay down area,
trailer area, muster area, smoking area
o Consider terrain and define special logistic requirements
o Division of shop and field activities
o Construction equipment consideration
Prior to construction mobilization and the execution of any field activities, CONTRACTOR
must be able to demonstrate that they are ready to proceed with construction. This
involves verification that management systems are in place, adequate planning has been
conducted, procedures and training requirements are completed, and that the
construction hazards have been adequately evaluated and controlled. These activities
should be accomplished through a series of formal Construction Readiness Reviews (CRR)
as outlined below.
Construction Readiness Review Schedule:
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 17 -
Restricted
Prior to HAZOP, the 60% design review should have occurred to eliminate the possibility
of the HAZOP becoming a design review.
2.2. Procurement
CONTRACTOR shall comply with all applicable local content legislation within the region
of Neuqun and in particular, Ley N2755: "Compre Neuquino".
CONTRACTOR is responsible to procure and pay for all requisite labor, material,
equipment, goods, and services required to perform all phases of work. CONTRACTOR
must have written approval from authorized COMPANY representative prior to placing
any Purchase Order (P.O.) to vendors or SUBCONTRACTORS.
Importation and associated customs payments of material, equipment, and/or services
procured from outside Argentina is the responsibility of CONTRACTOR
SUBCONTRACTORs are required to meet SHELLs Safety Requirements.
CONTRACTOR shall provide a complete Vendor Document Requirement List for approval
for major equipment prior to procurement. In the event CONTRACTOR does not have a
VDRL, SHELL can provide.
Although not mandated, Emerson is preferred for instrumentation.
2.3. Construction
Construction shall be in accordance with the approved Issued for Construction (IFC)
Drawings and Specifications.
CONTRACTOR is responsible to provide all labor, equipment, and supervision required
to perform work. This includes but is not limited to bull dozers, scrapers, cranes, forklifts,
onsite material storage, power tools, welding machines, welding rods, fuel, power, water,
toilets, trash bins, structural steel, rebar, concrete, silt fencing, geotextile fabric, gravel,
paint, consumables, etc.
In addition, CONTRACTOR is responsible for any temporary facilities and infrastructure
required to perform work, site security while under the care of CONTRACTOR, and waste
removal during construction. Site shall be kept clean and orderly during the course of
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 18 -
Restricted
construction and all debris and waste shall be removed prior to completing of Project.
Waste disposal shall be in accordance with all laws and regulations.
Contractor shall provide temporary service for cell phone and internet (WiFi)
connectability at location from beginning of construction until Handover to Operations.
2.3.1. Civil Earth Works
CONTRACTOR is responsible for
Tank Containment with 1000 micron thick HDPE liner & sump
Signage
Quarry Control, if required (Contractor shall provide all the Documentation that SHELL
requests concerning Quarry Permits)
2.3.2. Civil/Structural/Architectural
CONTRACTOR is responsible for
Perimeter fencing and gates with minimum standards as per ASTM requirements
2.3.3. Mechanical
CONTRACTOR is responsible for
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 19 -
Restricted
Painting
Inspection & testing of electrical equipment per NETA ATS or equivalent requirements
Calibration of instrumentation
Loop Testing
Non-Destructive examination
Hydrotesting
Continuity Checks
Loops Checks
As-Built drawings for P&IDs, One lines, wiring diagrams, Cause & Effect, Plot Plan
Welding reports
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 20 -
X-Ray Reports
Proctor testing
Restricted
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 21 -
Restricted
Shell has a Global Flawlist which has been developed based on the experiences from
previous projects and are to be used as input in developing the project-specific Flaws list
for this project.
CONTRACTOR shall incorporate FPD into their work plans by assigning focal person to
coordinate plans with the support of SHELL to develop and achieve delivery of a
flawless project.
CONTRACTOR shall schedule time and provide the resources to implement the following
5 Q-Area activities outlined in the table below.
QArea
Q-Area
Q-Area definition
Tightness
#
Q01
Q02
Cleanliness
&
Preservation
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
QArea
Q-Area
- 22 -
Restricted
Q-Area definition
#
different execution phases.
CONTRACTOR shall
1) Secure vessel and pipe openings
2) Installation methods for final internal inspection
3) ensure nothing is stored in pipe or equipment
Q3c
Mechanical
Rotating
Integrity
Q3d
Instrumentati
on Integrity
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
QArea
Q-Area
- 23 -
Restricted
Q-Area definition
#
1) Verification of processor
systems and packages
communication
between
Q3e
Electrical
Integrity
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 24 -
Restricted
To provide and facilitate the formation and identification of vendor resources for startup activities.
To provide guidance to address known and unknown project flaws that materialize
during pre-commissioning, commissioning and start-up.
To provide a notebook that will contain as-built P&ID's on a system by system basis,
partial commissioning check lists, instrument loop check list, rotating equipment
mechanical run log sheets, vibration and bearing temperature logs, PSV calibration
certification certificates and the control loop checks lists, operational pressure tests,
U1A forms, Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
documentation, instrument detail, electrical detail.
i. Mechanical Completion Definition and Scope
ii. Pre-Commissioning Scope
iii. Commissioning Scope (Safety Check, System Commissioning)
iv. System Boundary Limits (sub/system and discipline boundaries)
v. Electrical and Instrument circuit/loop Inspection and Test Plan
vi. Mechanical Completion and Pre-Commissioning Verification and Punch
Listing
vii. Punch list Management
viii. Mechanical Completion Files
ix. Commissioning Files
x. FAT Inspection Documentation:
xi. Initial start-up procedures
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 25 -
Restricted
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
3.
- 26 -
Restricted
SHELL will take the approach of utilizing CONTRACTORs standards for engineering and
construction with the following caveats to ensure Asset Integrity and Process Safety is
intrinsic to the design:
Hence, non-DEM1 SHELL Design Engineering Practices (DEPs) will not be provided to
CONTRACTOR to follow unless CONTRACTOR does not have a standard of their own to
follow. In that event, the DEP will be followed on an as convenient basis in which
variances to standards in those DEPs that are not followed are not documented. NonProcess Safety Shalls (i.e., lower case shalls) in DEM1 DEPs that are not followed will not
be formally varianced.
To ensure CONTRACTORs Standards meet SHELLs ALARP (As Low As Reasonably
Practicable) aspiration for technical safety, a gap analysis will be performed to identify
any potential gaps between CONTRACTORs Standards and SHELLs applicable DEM1
requirements. A list of applicable DEM1 and DEM2 requirements has been generated
and will be provided to short listed CONTRACTORs to identify potential gaps as well as
identify cost and schedule implications to implement.
Short listed CONTRACTORs will be requested to indicate if their standards meet the
DEM1 requirements which will be validated by the applicable Technical Authority (TA) in
SHELL.
In the event CONTRACTORs Standards do not comply with an applicable DEM1
requirement, the deficiency will be evaluated within the context of how else the risk may
be mitigated (i.e., other barriers such as operating procedures, different hardware, etc).
If an acceptable alternative risk mitigation is identified, the DEM1 requirement will be
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 27 -
Restricted
derogated with the approval of the applicable TA1. In the event an acceptable
alternative risk mitigation is not identified, CONTRACTOR will be required to meet the
DEM1 requirement and requested to provide a Cost and Schedule impact.
Only after the resolution of the gap analysis along with a full understanding of the cost
and schedule impacts associated with the mandated DEM1 requirements will the contract
with CONTRACTOR proceed.
Once finalized, any variation from the approved Specifications and Standards
(CONTRACTORs or SHELLs) will be required to go through the Project Change
Management Process for approval by the applicable Technical Authority to ensure Asset
Integrity and Process Safety is never inadvertently compromised.
4.
PROVIDED BY SHELL
ADDITIONAL REQUIREMENTS
5.1. Language
The primary language for this Project and its documents will be English with Spanish as
Secondary except for Permit Documents in Argentina which are required to be in
Spanish. Operating manuals are required to be translated into Spanish once approved.
In the event there is a conflict between English and Spanish, English will prevail unless
explicitly noted otherwise contractually. Notes and Comments on drawings will be noted
in English and Spanish.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 28 -
Restricted
5.2. Units
Units will be SI Units. Double notation with US Customary Units is not required and will
not be used unless absolutely necessary. Units typically expressed in US Customary Units
(i.e., nominal pipe size, flange ratings, etc) will not be converted to SI.
5.3. Software
SHELLs preferred software tools are listed below.
CONTRACTOR must be approved by SHELL.
Alternatives proposed by
Power Systems Analysis SKM Power Tools for Windows ver 7.0
6.
SCHEDULE
7.1. General
7.1.1. Introduction
It is the intent of SHELL that project controls (related to project estimating, reporting and
forecasting of cost and schedule and risk management) will be executed using
CONTRACTOR standard processes/procedures as documented in CONTRACTORS
Project Controls Plan (PCP) submitted by the CONTACTOR based on EXECUTION PLAN
and PROGRAMME. These systems, tools, processes and procedures must satisfy the
project control requirements and principles as specified in this Section. CONTRACTORS
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 29 -
Restricted
CONTRACTOR shall detail the Project Controls processes and procedures applicable
for the WORK in the Project Controls Plan (PCP). PCP is to set out CONTRACTORs
methodologies, processes (including interface and management of sub contractors),
staffing of the Project Controls organization (including number of positions and
equivalent number of people phased over time) and the systems that CONTRACTOR
shall implement consistent with the provisions of the CONTRACT.
In preparing the PCP, CONTRACTOR shall take account of and comply with SHELLs
project control requirements and principles as specified in this Section.
CONTRACTOR shall submit the proposed PCP for COMPANY review no later than
twenty (20) calendar days from the PO PLACEMENT. CONTRACTOR to submit for
COMPANY review the detailed procedures described in CONTRACTORs PCP no
later than thirty (30) calendar days, from the PO PLACEMENT, unless otherwise
agreed with COMPANY REPRESENTATIVE.
7.3. Reporting
7.3.1. General
CONTRACTOR shall provide the daily, weekly and monthly reports described in this
Section and all other reports required under the CONTRACT or as otherwise agreed
with COMPANY, at the times stated or as soon as possible (where no time is stated).
CONTRACTOR shall maintain detailed information to support the daily, weekly and
monthly reports and shall make such information available to SHELL as and when
required by SHELL.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 30 -
Restricted
CONTRACTOR shall prepare each report to such level and depth of content, details
and structure as agreed with SHELL in addition to the minimum content set out in this
Section. Each report shall provide sufficient content and details to meet SHELLs
reporting requirements.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 31 -
Restricted
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 32 -
Restricted
CONTRACTORs Management of Change Procedure shall address all changes from the
agreed baseline EXECUTION PLAN and PROGRAMME the WORK in relation to scope,
cost and schedule and as a minimum shall
i. Establish the baseline for Management of Change in relation to scope, cost
and schedule
ii. Recognize and communicate potential changes to the baseline in an effective
and timely manner to provide early warning of potential changes
iii. Where possible develop and present mitigation options to minimize impact
to quality, cost and schedule
iv. Assess the impacts of the change to quality, cost and schedule, ensuring all
impacted areas of the project are considered
v. Seek approval or instruction from SHELL as required
CONTRACTOR shall submit to SHELL for review, its detailed Management of Change
Procedure for implementing the provisions of the CONTRACT and specifically this clause.
CONTRACTORs detailed management of change procedure shall describe
CONTRACTORs methodology and systems for implementing the provisions of the
CONTRACT.
7.5. Project Calendar
SHELL will establish a Project Calendar for the WORK with CONTRACTOR.
CONTRACTOR shall develop and submit its Project Calendar for review by SHELL.
CONTRACTORs Project Calendar shall provide details and clarity on key dates, cutoff dates, meetings, submissions and any other required detail, documentation and
events that will occur on a regular basis.
CONTRACTOR shall maintain the Project Calendar so as to align with any agreed
changes agreed with SHELL and the updated Project Calendar shall be re-submitted
as changes occur. In any event, CONTRACTOR shall review and re-issue the Project
Calendar every (3) three months.
CONTRACTOR shall submit to SHELL for review, its detailed Project Calendar
procedure for implementing the provisions of the CONTRACT and specifically this
clause. CONTRACTORs detailed Project Calendar procedure shall describe
CONTRACTORs methodology and systems for implementing the provisions of the
CONTRACT.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 33 -
Restricted
CONTRACTORs planning and scheduling shall encompass all phases of the WORK,
including those performed by its SUBCONTRACTORS. CONTRACTOR shall structure
the schedules in such a way that status and progress can be aggregated in a precise
and transparent way from a lower level schedule to a higher level schedule.
Level III integrated baseline Schedule, once approved by COMPANY, shall be saved
as a Target or Primary Baseline schedule, and unless a formal re-baseline or a
formal change request is approved by COMPANY, updated Level III integrated
baseline can only be used after full substantiation of CONTRACTOR to COMPANY
and approval by COMPANY.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 34 -
Restricted
iii. Level III Integrated Baseline Schedule / Integrated Plan: Integrated Baseline
Schedule will be developed and is consistent with CONTRACT Management
Schedule and maintained as the Integrated Plan in alignment with the timely
aggregation and the project status, as per project calendar from more
detailed schedules as necessary and based on a robust precedence network
principle; sufficient detailed logic linked activities, resource loaded and
effective segregation between the different WORK by inclusion of interface
milestones. This schedule supports critical path analysis and comparison with
the baseline.
iv. Level IV / V Detailed schedules / Databases / Worklist / Workpacks for
Engineering, Procurement, Fabrication, Construction and Handover PreCommissioning / Commissioning and Start-up for the WORK. These
schedules will be completely managed by CONTRACTOR and form the basis
of the day to day management of the WORK and will be utilized to update
the progress and status of the Baseline plan (Level III).
7.6.3. Schedule Requirements
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 35 -
Restricted
iii. Activity descriptions for different types of work will be unique, explicit and
provide sufficient granularity to be self-explanatory.
iv. Activity Duration, Remaining Activity Duration, Early Start, Early Finish, (e.g.
Actual Start / Actual Finish), Total Float, Physical Progress %
Mandatory and Expected Finish constraints are not allowed in the schedule.
Open ends in the logic network, out of sequence, redundant logic and extensive lags
are not allowed and need to be resolved before submission.
The use of extensive activity durations must be limited e.g. engineering activities not
longer than 30 days, construction activities not longer than 60 days and
commissioning activities not longer 30 days.
Scheduling settings will be agreed upfront with COMPANY but otherwise should be
based on retained Logic and delinked Physical and Schedule progress.
Each month the updated Level III Integrated Plan shall be submitted to SHELL
electronically in native file format. Any problems with the schedule will be discussed
between SHELL and CONTRACTOR before amendment of the schedule by
CONTRACTOR.
Changes such as new, deleted or changed logic links, new or deleted activities,
modified descriptions, changed activity durations and assigned resource changes will
be documented and transmitted to SHELL along with the updated Baseline Schedule.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 36 -
Restricted
CONTRACTOR will provide reports showing the status of the discipline walkthrough,
punchlisting, handover of facilities, systems and subsystems and all documentation
needed to support the completion of the PERMANENT WORK.
CONTRACTOR shall after the approval of SHELL of the proposed changes and
amendments, reflect and describe the impact of all changes and amendments in the
planning and scheduling documents.
In case of any event or change having impact on the overall project completion
schedule, CONTRACTOR shall submit along with each change, a detailed evaluation
of the schedule impact if any, due to change in scope/sequence of work etc.
Justification for schedule impact should be accompanied by a logic network, clearly
highlighting the impact of such changes on the completion of intermediate milestones
as well as on the overall project completion.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 37 -
Restricted
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 38 -
Restricted
vi. CONTRACTOR shall submit to SHELL for review, its progress management
procedure for implementing the provisions of the CONTRACT and
specifically this clause. CONTRACTORs detailed progress management
procedure shall describe CONTRACTORs methodology and systems for
implementing the provisions of the CONTRACT.
7.7.2. Progress Monitoring and Measurement
Throughout the duration of the CONTRACT, CONTRACTOR shall monitor progress of the
WORK against the agreed progress measurement Baseline:
i. The progress shall be aggregated up to the Level 2 Contract Management
Schedules and the Level 1 Contract Master Schedule for reporting the total
progress of the WORK. Progress shall be assigned on the basis of physical
completion of detailed activity deliverables. CONTRACTOR shall promptly
notify SHELL of any matter concerning the WORK which if not resolved, is
likely to affect the achievement of the dates in the SCHEDULE OF KEY
DATES.
ii. Progress shall be measured based on earned man-hours for Engineering
and Construction (including Fabrication). For procurement progress shall be
measured based on appropriate milestones and weightings.
iii. All forecast dates are to be supported by observed rates of progress. If the
progress data does not support forecast dates then CONTRACTOR is to
either:
(a)
(b)
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 39 -
Restricted
CONTRACTOR shall execute cost control of the WORK during the term of the
CONTRACT in accordance with requirements of this Section. CONTRACTOR shall
establish a tiered level of cost control in accordance with COMPANY agreed coding
system and shall be fully consistent with agreed Work Breakdown Structure. The
coding system shall reflect the SCHEDULE OF KEY DATES. All labor and other costs
shall be effectively monitored and controlled by CONTRACTOR for any reimbursable
elements.
CONTRACTOR shall maintain and report the following cost information for
reimbursable elements of the WORK, if any.
i. Summary job-hour report by Discipline/Activity
ii. Summary Cost and Commitment Report
iii. Procurement Summary
CONTRACTOR shall provide an estimated monetary (Incurred Cost) value for the full
calendar month by the 25th of the month or the Friday before if the 25th is on the
weekend.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 40 -
Restricted
CONTRACTOR will strictly conform to the WBS structure as provided by SHELL for the
PROJECT. Should CONTRACTOR have the need to expand the WBS to lower levels,
this is acceptable, providing this structure rolls up to SHELL specified WBS.
SHELL will submit SHELL WBS to CONTRACTOR within seven (7) days of the PO
PLACEMENT.
CONTRACTOR shall submit within thirty (30) days of the PO PLACEMENT any
comments of the WBS for consideration by SHELL.
The WBS will be applied by CONTRACTOR to all reporting, planning, cost control,
forecasts, estimates and other relevant project processes.
CONTRACTOR shall provide a Contract baseline phased expenditure of weeklyplanned and defined milestone activities or against an agreed Contract activities
breakdown for carrying out the WORK. CONTRACTOR shall also provide a monthly
updated forecast phased expenditure including approved change orders, if any, that
will accurately represent the Estimate at Completion (EAC) of the WORK
CONTRACTOR shall submit to SHELL for review, its detailed procedure for Cost and
Forecasting Expenditures in accordance with the provisions of the CONTRACT and
specifically this clause. CONTRACTORs detailed procedure shall describe
CONTRACTORs methodology and systems for implementing the provisions of the
CONTRACT, this clause, and SHELL standard procedures.
This clause should be read in conjunction with the clause on Work Breakdown
Structure (WBS).
Where CONTRACTOR utilizes a CBS different to SHELL standard, the data provided
to COMPANY should then be mapped across to COMPANY standard. All reporting
and deliverables to SHELL from CONTRACTOR shall be provided with the conversion
of coding already completed. CONTRACTORs methodology for mapping and
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 41 -
Restricted
Upon successful award of Contract, all documents shall be transmitted to SHELL via
Document Control utilizing LiveLink with a transmittal sent to SEPCO-Argentina-ProjectIM@SHELL.com for subsequent distribution internal to SHELL. CONTRACTOR will be
provided a designated LiveLink space to submit documents along with instructions and
any requisite training to utilize the site.
Documents shall be numbered in accordance with Shells Design Document Numbering
Procedure (SAU-COM-MFPM-JA-6017-0001) which will be provided prior to award of
Contract. A representative of SHELL will coordinate with CONTRACTOR to ensure proper
numbering and submittal.
During project development, documents shall be sent to SHELL in PDF format. At the
completion of the Project, all documents shall be sent to SHELL updated to As-Built Status
in PDF (as part of the Final Handover Package) and native format All documents shall be
formatted to fit on A3 or A4 size paper.
To support SHELLs internal assurance tracking, CONTRACTOR shall reference applicable
Control ID numbers on transmittals and documents. When two Control IDs are provided,
both are to be used.
9.
INTERFACE MANAGEMENT
9.1. General
Amongst the Project Team, Microsoft Office Outlook will be the primary means for written
communication for typical day to day activities including minor clarifications, questions,
and general information sharing that does not impact scope, schedule, or budget. Issues
impacting scope, schedule, or budget shall be documented using the Project Change
Management Process.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 42 -
Restricted
Email shall not be relied upon as the only means of trying to work an issue and should
only be used to the point in which an issue is identified at which point real-time
interpersonal communication shall be utilized in the following order of preference:
Telephone Call
Documenting what was discussed, outcomes, and next steps via email is acceptable and
encouraged. Do not assume that people will action something in an email simply
because it was sent. These action items are to be documented in the most relevant
recurring meeting action item log to document and track action items.
9.2. Communication between SHELL and CONTRACTORs
All direction to CONTRACTOR that may potentially lead to a Change Order or Project
Change Notice must be channeled through the Project Delivery Focal.
CONTRACTOR processes and forms for Requests for Information, Technical Queries,
Change Orders, etc will be submitted to SHELL for approval and used to the greatest
extent possible. In the event none exist, templates will be provided by SHELL for use.
SHELL Document Control will be the conduit for communication between SHELL and
CONTRACTOR for:
Technical Queries
The Project Delivery Focal will be the primary conduit for communication between SHELL
and CONTRACTOR for:
Cost Updates
Schedule Updates
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 43 -
Restricted
9.4.
Meetings
9.4.1. General
Recurring, one off and ad hoc meetings are essential to align the SHELL Team and
CONTRACTOR Team. All formal CONTRACTOR and SHELL meetings will begin with a
safety topic and discussion. Teleconference, desk top sharing, and video conference
(when available) will be made available via LiveMeeting to facilitate participation from
remote participants. CONTRACTORs are expected to have their own internal meetings
without SHELL presence as they deem required to align themselves internally.
In meetings everyone is expected to speak their mind when they have something to add
relevant to the topic at hand, but not everyone needs to speak for the sake of saying
something within the meeting.
Common rules of courtesy will be abided by:
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 44 -
Restricted
Recognize that all ideas are potentially good ideas, dont rush to evaluate
suggestions; keep an open mind
The standard time period for SHELL Review and Comment or Approval will be 10 working
days as measured from the time the document has been issued from the issuing
organizations Document Control. Cycle times less than 10 working days require mutual
agreement between issuer and reviewers prior to being implemented.
SB/CdL Early Production Facility
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 45 -
Restricted
In the event no comments are submitted and no extension has been requested, it will be
treated as No Comment or Approved.
Use of clear and concise instructions and comments are required. Comments in the form
of questions are to be avoided. If a decision cannot be taken during review, clear
direction on how to proceed to conclusion shall be provided. Telephone conversations
with issuer may be required to establish a plan. Do not throw bombshells over the
fence. Inform the issuer in advance if there are major comments and/or concerns.
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas
SB-1000-VA-5793-0003
- 46 -
Restricted
Scope of Work
Revision 02
UA Upstream Americas
Proprietary Information: This document contains proprietary information and may not be partly or
wholly reproduced without prior written permission from SHELL Upstream Americas