Sie sind auf Seite 1von 16

Syed Saqib Mehboob

06-CE-50

DESIGN OF A CANTILEVER WALL


GIVEN DATA:
Height of stem above G.L. =30
Bearing Capacity of soil = 5 ksf
fc = 5000psi &

fy = 60,000psi

= 30O AND Overburden pressure = 4 height


CALCULATIONS:
HEIGHT OF WALL:
Allowing 4 for the frost penetration to the bottom of the footing in front of
the wall, so total height becomes;
h = 30 + 4 = 34
THICKNESS OF BASE:
At this, it may be assumed 7 to 10% of the overall height of wall.
Assume a uniform thickness = t = 3.5

(i.e. 10% of h)

BASE LENGTH:
h =34 and
So,

h = 4

P= Cahwh (h+ 2h)


P =0.5(0.333)(120)(34)[34 + 2(4)]

where Cah=1-Sin/1+sin

P=28560 lb..(1)
And y= h/3 [(h+3h)/ (h+2h)] = 34/3 [(34+ 3X4)/(34+2X4)] = 12.41 ..(2)

Cantilever Retaining Wall

Page 1

Syed Saqib Mehboob

06-CE-50

Taking moment about point a


W=(120)(x)(34+8)=5040x lb.
So; W(x/2)=(P)(y)
2520x2 = (28560)(12.41)
x= 11.86
So the base length =1.5X11.86 =17.79
Use 17-9 with toe =4-4 and

x=13-5

STEM THICKNESS:
Prior computing stability factors, more accurate knowledge of the concrete dimensions is
necessary.
The thickness of the base of stem is selected with regard of the bending and shear requirement.
P for 30 height and h = 4
P= Cahwh (h+ 2h)
= 0.5(0.3333)(120)(30.5)[30.5 +2(4)]
=23,461.5 lb.

Cantilever Retaining Wall

Page 2

Syed Saqib Mehboob

06-CE-50

y= h/3 [(h+3h)/(h+2h)] = 30.5/3 [ (30.5+ 3X4)/(30.5+2X4)] = 11.22


and Mu =1.7(P)(y) =447504.65 lb.ft.
b = 0.85 fc/fy [87000/87000+fy] =

..
,




X 
 , = 0.0356

max = 0.75 b =0.0267


For adequqte deflection control, choose = max 0.01335
Then

Rn = fy [1- m]

And; m= fy/0.85fc

= (0.01335)(60,000) [1- (0.01335) 14.12]

= 60,000/(0.85)(5000)

= 726

=14.12

Required bd2 = Required Mn/ Rn


Or

/

bd2 =

d2 =


/




. 
.
 

= 26.17

Total thickness =26.17 + 0.5 +3 =29.7 30


Try 30 of base of stem and select 12 for top of the wall.
Note: By taking these calculated value, when we proceed for the shear atd and afterwards
For F.O.S. against overturning; F.O.S comes less than 2 (so its not ok).
Also for same values, the settlement check is also not ok.
So; by inspection/ by trial & error method.
Revise the following dimensions as given below:
.Total base length = 23

where; x=19 and toe= 4

.Thickness of stems base = 32


SHEAR AT d
d used now = 32-0.5-3 = 28.5 or 2.375

Cantilever Retaining Wall

Page 3

Syed Saqib Mehboob

06-CE-50

At 30.5 2.375 = 28.125 from top.


P = x 0.333 x120 x 28.125 [28.125+ 2(4)]
= 20,299.99 lb.
& Vu= 1.7P =34509.98 lb.
& Vu = 2bd = 0.85 x 2x 5000 x 12 x 28.5 = 41,111.18 lb.
Since, Vu > Vu; so no shear reinforcement is required.

FOS AGAINST OVERTURNING:

Cantilever Retaining Wall

Page 4

Syed Saqib Mehboob

Components
W1
W2
W3
W4
W5
W6
TOTAL

06-CE-50

Force (lb.)
(16.33)(30.5)(120) = 59767.8
(1.66)(30.5)(150) = 3797.25
(1)(30.5)(150) = 4575
(23)(3.5)(150) = 12075
(1.66)(30.5)(120)= 3037.8
(18)(4)(120) = 8640
F = 91892.85 lb

Arm(ft)
14.825
5.55
4.5
11.5
6.106
14

Moments(lb.ft)
886057.635
21074.7375
20587.5
138862.5
18548.80
120960
M=1206091.173 lb

From eq. (1) & (2); we have:


P = 28560 lb
y = 12.41
Overturning moment = 28560 x 12.41 = 354429.6 lb.ft
FOS against overturning =

 .173
$ .

= 3.4 > 2

so ok.

LOCATION OF RESULTANT AND FOOTING SOIL PRESSURE:


Distance of the resultant fro edge is:
a=

%&'()&*' +,+-*).,/-0)0*&*' +,+-*)


),)12 2,13 righting

1206091.
$.$ .
),)12 2,13 0&'()&*'

= 9.27

Middle third = 7.66; so resultant is within the middle third.

Cantilever Retaining Wall

Page 5

Syed Saqib Mehboob

06-CE-50

Therefore q1 = RV/l2 (4l 6a) =

91892.
 $ $

[4(23) 6(9.27)] = 6.31 > 5 ksf

so not ok..

So revise; Readjust the stem location over base


Now take toe length = 7 8
And length x = 15 4
Then recalculating the F & M for new values we get;
RV = 76752.65 lb.
& M = 112570.86 lb.
Now; FOS comes 3.1> 2.0

0k

Resultants location = a= 10.0


Thus;
q1 = RV/l2 (4l 6a) =


 .
 $ $

[4(23) 6(10.0)] = 4642.8 < 5 ksf

q2 = RV/l2 (6a 2l) = 2031.26 psf < 5 ksf

so ok.

FOS AGAINST SLIDING:


Force causing sliding = P = 28560 lb.
Frictional resistance= RV = (0.4)(76752.65) = 30701.06 lb.
Passive earth pressure against 3.5 height of footing = wh2 Cph = (120)(3.52)(3) = 2205 lb.
FOS =
REQUIRED.

$
 . 


= 1.2 < 1.5

SO KEY IS

The front of key is 5 in front of back face of stem. This will permit anchoring the stem
reinforcement in the key.
>
$.

 .
$

Cantilever Retaining Wall

Page 6

Syed Saqib Mehboob

06-CE-50

? = 1486.31 lb/ft
Total ordinate = 3517.57 lb/ ft

Frictional resistance b/w soil to soil = R = (tan) [

 . $
.

Frictional resistance b/w heel concrete to soil = R = (0.4) [

](9.91) = 23344.95 lb.

$
.
$ . 

](13.09) = 14526.84

lb.
Passive earth pressure = wh2 Cph = (120)(h2 )(3) = 180 h2 lb.
FOS against sliding = 1.5
1.5=

$$.  . @A




h= 5.25,

so key height = 53 3.5 = 1 9

And the heel height =


DESIGN OF HEEL CANTILEVER:
WU =
(1.7)(120)(4)+(1.4)(30.5X120+3.5X150)
= 6675 lb/ft
Cantilever Retaining Wall

Page 7

Syed Saqib Mehboob

06-CE-50

Mu = wl2/2
= (6.675)(12.673)2 = 536.0 k. ft

Vu = Factored shear at a joint of stem and heel ..(3)


Note: When the support reaction introduces compression into the end region, then critical
shear is at a distance d from the face of support. However, the support is not producing
compression; therefore critical shear is at a joint of stem and heel.
Now Vu = (12.673)(6675) = 84592.27 lb.
Vu = 2bd = 0.85x2x5000 x 12 x 39.5 = 56978.66 < Vu
So; depth is required to be increased.
d=

BC

EFGH3

 .

,.( )

= 58.6 60 (i.e. 5)

and d = 57.5

Now; Wu= 1.7(120)(4) + 1.4[(29)(120) + (5)(150)] = 6738 lb/ft


Mu = (6738)(12.673)2 = 541078.0 lb.ft
Required Rn =

H3A

= [1 N1
M

min =


EQ

IJ

MP
EQ

(541078.)( )

(.)( )(
.)A

= 181.83 psi.

] = 0.00309

= 0.00333

As= minbd = (0.00333)(12)(57.5) = 2.297 in2


Use # 8 @4 c/c (As = 2.36 in2)
Development length required:
Since in cantilever heel main bars are on top;
So;

Cantilever Retaining Wall

Page 8

Syed Saqib Mehboob

ld = (1.3)

.ER ST

06-CE-50

= (1.3)

EU

.,.



= 34.85

Available length = 152.07 -3 = 149.076

where;  V = r2 )
so ok

DESIGN OF TOE:
>
 .

15.$

? = 1741.79 lb/ft

Total ordinate = 1741.79 + 2031.26 = 3773.05 lb/ ft


Self load = (0.9)(1x3.5x150) = 472.5 lb/ ft
Wu= (1.7)(

 . $

$.

= 7153.47 lb/ ft

Wu= 7153.47- 472.5 = 6680.97 lb/ ft


Mu = wl2/2 = = (6680.97)(7.66)2 = 196004.96 lb. ft
Required Rn=

IJ

 . 

H3

. $.A

A=

= 139.58 psi

= 0.00236
min =



W

= 0.00333

(holds)

As= min bd = (0.00333)(12)(39.5) = 1.578 in2


Use # 8 @ 51X2 c/c (As = 1.71 in2)
Development length required:

Cantilever Retaining Wall

Page 9

Syed Saqib Mehboob

ld =

.04ER ST
EU

06-CE-50

= 26.80

Available length = 7.66-(

12

) = 7.41 or 88.92

At distance d= 39.5= 3.29 = 7.66 -3.29


= 4.37
>
 .

.$
$

? = 2115.36 lb/ft
Total ordinate = 4146.62
Earth pressure = Y

 .  . 

](4.37)(1.7) = 32648.30 lb.

Vu = 32648.30 (472.5 -4.37) =30583.47 lb.


Vc = 2bd = 0.85500012 (39.5) = 56978.66 lb.

Therefore; Vc > Vu.

so no shear reinforcement is required.

REINFORCEMENT FOR STEM:


P= Cahwh (h+ 2h)

Note: (30.5-1.5 = 29) As; 3.5+1.5 =5,

= 0.5(0.3333)(120)(29)[29 +2(4)]

which was new heel base thickness.

=21438.54 lb.
y= h/3 [(h+3h)/(h+2h)] = 10.71
Mu = (1.7)(21438.54)(10.71) = 390331.49 lb.ft
Rn =

IJ
H3A

$$$ . 
.  .A

= 533.95 psi.

= 0.00954
As= bd = (0.00954)(12)(28.5) = 3.26 in2
Use # 10 @ 41X2 c/c (As = 3.37 in2)
At 5 from top:
Cantilever Retaining Wall

Page 10

Syed Saqib Mehboob

P=1298.7 lb.

06-CE-50

y= 2.179

Mu=4.81 k.ft

y= 4.07

Mu=14.65 k.ft

y= 5.87

Mu=68.79 k.ft

At 10 from top:
P=3596.4 lb.
At 15 from top:
P=6893.1 lb.
At 20 from top:
P=11188.8 lb.

y= 7.62

Mu=144.9 k.ft

y= 9.34

Mu=261.72 k.ft

At 25 from top:
P=16483.5 lb.

Mu=390.33 k.ft

At base:
WITH FULL REINFORCEMENT:
C = 0.85fcba = 0.85 x 5000 x 12 x a =51000a
T = Asfy = 3.37 x 60,000 = 202200
a = 3.96 in.
At top of wall

(C=T)
d = 8.5
\

Mn = 0.9Asfy (d - ) = (0.9)(202200)(8.5 3.96/2) = 1186509.6 lb.in or 98.87 k.ft


At base of stem d = 28.5

Mn = 402.176 k.ft
WITH HALF REINFORCEMENT:
C = 0.85fcba = 0.85 x 5000 x 12 x a =51000a
T = Asfy = 1.685 x 60,000 = 101100
a = 1.98 in.
At top of wall

(C=T)
d = 8.5

Mn = 56.94 k.ft
Cantilever Retaining Wall

Page 11

Syed Saqib Mehboob

06-CE-50

At base of stem d = 28.5


Mn = 208.59 k.ft
WITH HALF REINFORCEMENT:
C = 0.85fcba = 0.85 x 5000 x 12 x a =51000a
T = Asfy = 0.8425 x 60,000 = 505500
a = 0.99 in.
At top of wall

(C=T)
d = 8.5

Mn = 30.34 k.ft
At base of stem d = 28.5
Mn = 106.17 k.ft
THEORATICAL CUT OFF POINTS:
Theoretical cutoff points should be cut off at 7 distance from bottom and further half bars
should be cut off at 14 theoretically from bottom.

Cantilever Retaining Wall

Page 12

Syed Saqib Mehboob

06-CE-50

The actual termination is found out by extending beyond the intersection of capacity moment
line with the factored moment diagram a distance of either the effective depth d or 12 bar
diameters, whichever is greater.
(a) Effective Depth:
>
Q 

?=

20
$.


$. 

xy

d at 7 from bottom (y=23.5)

where; y = 30.5 7 = 23.7

? = 15.4
Therefore; 8.5+15.4 = 23.9= 24
Also; ? =


x y = 10.81
$.

where; d at 14 from bottom

(y=16.5)
Therefore; 8.5+10.81 = 19.3= 24

(b) 12 bar diameters:


bar used #10 of diameter = 1.25
So; 12db = 15
Conclusions from (a) & (b):
Since; we have to use the greater value thus; add 24 in all termination point lengths.
Actual Cut off points:
Therefore half bars should be terminated actually at 7 + 2 = 9 from bottom.
And further half bars should be terminated actually at 14 + 2 = 16.
For tension bars to be terminated in the tension zone, one of the following conditions must be
satisfied:
(1) Vu at cut off points must not exceed two third of the shear strength Vn.

Cantilever Retaining Wall

Page 13

Syed Saqib Mehboob

06-CE-50

(2) Continuing bars must provide at least twice the area required for bending moment at the
cutoff point.
(3) Excess shear reinforcement is provided.
Condition No: 01. (Check whether theoretical cutoff point is enough or not).
At 23.5 from top (for half reinforcement)
Vc = 2bd = 0.855000(12) (24) x
]
^





= 25.14 kips .(4)

Vc = 2bd = 0.855000(12) (19.3) x


^

= 34.62 kips.

Vc = 23.08 kips.

& Vu = 1.7 [ Cah wh(h+ 2h) ] x



(Not Satisfied)

= 27.84 kips.

Vc = 18.56 kips.

Now; Vu = 1.7 [ Cahwh (h+ 2h) ] x



= 13.7 kips

( Satisfied)

Now; these bars can be terminated.


Stress concentration check:
Shear at bottom = Vu = (1.7)(21.43854) = 36.45 kips.
Vc = 2bd = 0.855000(12) (28.5) x
Vc > Vu ;

1000

= 41.11 kips.
so; no need of shear reinforcement.

Note: thus; from eq. (4) results we cannot cutoff the bars at 7 from bottom as the condition is
not satisfied. Thats why we had found out the actual cutoff points i.e. 9 & 16 respectively.
Check for :
The used should not be less than



W

at any point. This minimum limit, strictly speaking,

does not hold true for retaining walls. However; because the integrity of retaining wall depend
absolutely on the vertical walls, it appears to be suitable to use this limit in such cases:
First termination point is 9 from bottom where d = 22.59; As = 1.685 in2 (half case)
Cantilever Retaining Wall

Page 14

Syed Saqib Mehboob

06-CE-50

Since; As= bd
So; =0.0062 >

Consider fig. 1 and relation



EQ

= 0.0033

(ok)

?=


$.

x y ; here y= 30.5-9=21.5

Then; ? = 14.09 & d =8.5+ 14.09 = 22.59


= 0.0039 >


EQ

(ok)

Another requirement is that maximum spacing of the primary flexural reinforcement exceed
neither 3 times the wall thickness nor 18 in.
These restrictions are satisfied as well.
Splice lengths:
For the splice of deformed bars in tension; at sections where the ratio of steel provided to the
required is less than 2 and where no more than 50% of the steel is spliced; the ACI code
requirement, a class B splice of length 1.3 ld
ld for #10 bars = 42

(from table A.10.)

Splice Length = 1.3x42 = 54.6 or 4-6

(ok)

TEMPERATURE & SHRINKAGE REINFORCEMENT:


Total amount of horizontal bars (h is average thickness)
As = 0.002bh =0.002x 12 x

= 0.528 in2/ft

Since; front face is more exposed to temperature changes; therefore rd of this amount is
$

placed in front face and one third in rear.


Accordingly, As = 0.352 in2/ft


$

Also; As = 0.176 in2/ft


$

Use # 10 @ 61X2 c/c (As = 0.36 in2)


Use # 3 @ 18 c/c (As = 0.36 in2)

For vertical reinforcement on the front face; use any nominal amount; Use # 10 @ 18 c/c
Since; base is not subjected to extreme temperature changes, therefore; use 4@12c/c just for
spacers will be sufficient.
Cantilever Retaining Wall

Page 15

Syed Saqib Mehboob

Cantilever Retaining Wall

06-CE-50

Page 16

Das könnte Ihnen auch gefallen