PLANILLA DE METRADOS DE OBRA

MEJORAMIENTO DE LA I.E. INICIAL SANTA FELICITA - BARRIO PROGRESO


PROPIETARIO: MUNICIPALIDAD DISTRITAL DE HUANCAN
CONSULTOR: ING. ANGEL TOMAS CANCHANYA PEA
DISTRITO: HUANCAN
PART.

FECHA: HUANCAYO - JUNIO 2013

PROVINCIA: HUANCAYO

DESCRIPCION

UNID.

DEPARTAMENTO: JUNIN
DIMENSIONES

# VECES

METRADO

LARGO

ANCHO

ALTO

PARCIAL

1.00
1.00
1.00
1.00

_
_
127.10
_

_
_

_
_

1.00
1.00
127.10
1.00

1.00

1.00

1.00

Area=

299.28

299.28

1.00

Area=

299.28

299.28

1.00

1.00

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

1.20
1.20
1.20

9.60
13.82
18.43

4.00
2.00
2.00
1.00
1.00
1.00
1.00

4.30
3.80
18.35
5.10
2.25
0.95
5.55

0.50
0.50
0.50
0.40
0.40
0.40
0.40

1.10
1.10
1.10
0.65
0.65
0.65
0.65

9.46
4.18
20.19
1.33
0.59
0.25
1.44

2.00
2.00
1.00
1.00
1.00
1.00
2.00
8.00

4.30
3.80
5.10
2.25
0.95
5.55
18.35
Area=

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.73

0.40
0.40
0.15
0.15
0.15
0.15
0.40
0.40

0.86
0.76
0.19
0.08
0.04
0.21
3.67
2.34

4.00
2.00

Area=
Area=

1.55
1.38

0.40
0.40

2.48
1.10

4.00
2.00

Area=
Area=

2.12
1.97

0.40
0.40

3.39
1.58

1.00

78.24

2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.65
2.90
1.20
1.20
7.50
32.05
5.90
0.50
32.05

MODULO AULA - SS.HH


01.00 OBRAS PROVISIONALES
01.01 Almacen y guardiania
01.02 Cartel de obra de 3.60 X 2.40
01.03 Cerco Perimetrico Provicional
01.04 Movilizacion y desmovilizacion de Equipos

GBL
UND
M
GLB

02.00 ESTRUCTURAS
02.01 TRABAJOS PRELIMINARES
02.01.01 Demolicion de Construccion Existente
Losa deportiva
02.01.02 Limpieza de terreno manual

GBL
M2

02.01.03 Trazo niveles y replanteo

M2

02.01.04 Eliminacion Desmonte de Demolicion

GLB

02.02 MOVIMIENTO DE TIERRAS


02.02.01
Excavacin de zanjas para zapatas
Z-1
Z-2
Z-3
02.02.02

02.02.03

02.02.04
02.02.05

M3

Excavacin de zanjas para cimientos


M3
Eje 1,5,6,10
Eje 3,8
Eje A,B (Largo=18.35 m.)
Exc. Cimiento vert. Entre eje 3-4
Exc. Cimiento vert. Entre eje 4-5
Exc. Cimiento Horiz.Entre amb.SSHH Comedor.y dep.
Exc. Cimiento Horiz. En SS.HH (nios y nias)
Relleno con material propio
M3
Eje 1,5,6,10
Eje 3,8
Eje A,B (Largo=18.35 m.)
Exc. Cimiento vert. Entre eje 3-4
Exc. Cimiento vert. Entre eje 4-5
Exc. Cimiento Horiz. Entre amb.SS.HH direc.y dep.
Exc. Cimiento Horiz. En SS.HH. (nios y nias)
Z1(1.00*1.00)
Z2(1.60*1.20)
Tipo 1 (2 encuentros con viga de ciment).
Tipo 2 (3 encuentros con viga de ciment).
Z3(1.60*1.60)
Tipo 1 (2 encuentros con viga de ciment).
Tipo 2 (3 encuentros con viga de ciment).

Eliminacin de material excedente con equi


Nivelacin y compactacin interior c/equipo
Aulas A-1,A,2
SS.HH (nios y nias)
SS.HH (Direccion)
Deposito
Direccion
Vereda elevacion principal
Vereda pegado a los Ss.Hh. (nios y nias)
Vereda pegado a la direccion (lateral)
Vereda hacia la calle

02.03 OBRAS DE CONCRETO SIMPLE


02.03.01 Cimientos
02.03.01.01
Cimientos corridos mezcla 1:10 cemento-h

M3
M2

M3

78.24
5.50
3.35
2.65
2.70
5.50
2.00
2.25
6.00
1.20

_
_
_
_
_
_
_
_
_

84.15
19.43
3.18
3.24
41.25
64.10
13.28
3.00
38.46

PART.

DESCRIPCION

UNID.

ANCHO

ALTO

PARCIAL

4.30
3.80
18.35
5.50
3.20
1.10
5.55

0.50
0.50
0.50
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.50
0.50
0.50
0.50

6.02
2.66
12.85
1.10
0.64
0.22
1.11

5.00
1.00
1.00
1.00

5.20
4.30
7.65
13.80

0.25
0.25
0.15
0.25

0.30
0.30
0.40
0.30

1.95
0.32
0.46
1.04

1.00
1.00
1.00
1.00
1.00
1.00

22.10
7.00
4.70
3.35
1.20
4.10

0.15
0.15
0.15
0.15
0.15
0.15

0.40
0.30
0.55
0.55
0.55
0.55

1.33
0.32
0.39
0.28
0.10
0.34

10.00
2.00
2.00
2.00

5.20
4.30
7.65
13.18

0.30
0.30
0.40
0.30

15.60
2.58
6.12
7.91

2.00
2.00
2.00
2.00
2.00
2.00

22.10
7.00
4.70
3.35
1.20
4.10

0.40
0.30
0.55
0.55
0.55
0.55

17.68
4.20
5.17
3.69
1.32
4.51

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

8.00
11.52
15.36

2.00
1.00
1.00
1.00

2.90
1.20
1.20
7.50

3.35
2.65
2.80
5.70

19.43
3.18
3.36
42.75

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

1.00

446.78

6.00
2.00

5.20
29.00

0.25
0.25

12.00
4.00

5.20
29.00

0.40
0.40

1.00

1362.75

20.00

0.25

1.00

1027.32

M3

Eje B espesor 0.15 cm2(L=3.65+2.65+1.35 )=7.65


Eje Bespesor 0.25 cm(L=2.65+3.75+3.75+3.65 )=13.80
Eje A espesor 0.15 cm2
(L=3.65+3.65+3.65+0.00+3.75+3.75+3.65 )=22.10
Eje A espesor 0.25 (L=3.50+3.50)=7
Sobrecimientovert. Entre eje 3,4
Sobrecimiemto vert entre eje 4,5
Sobrecimiento horiz.entre amb.SS.HH direc.y dep
Sobrecimiento horiz. del SS.HH (nios y nias)
02.03.02.02

Encofrado Y Desencofrado Para Sobrecimien


Eje 1,5,6,8,10
Eje 3 (largo=5.20-0.90)

M2

Eje B espesor 0.15 cm2(L=3.65+2.65+1.35)=7.65


Eje Bespesor 0.25 cm(L=2.65+3.75+3.75+3.65)=13.80
Eje A espesor 0.15 cm2
(L=3.65+3.65+3.65+0.00+3.75+3.75+3.65 )=22.10
Eje A espesor 0.25 (L=3.50+3.50)=7
Sobrecimientovert. Entre eje 3,4
Sobrecimiemto vert entre eje 4,5
Sobrecimientohoriz.entre amb.SS.HH direc.y dep
Sobrecimiento horiz. del SS.HH (nios y nias)
02.03.03 Solado
02.03.03.01
Solados Para Zapatas E=4" 1:12 C:A
Z-1
Z-2
Z-3
02.03.04 Falso Piso
02.03.04.01
Falso piso de 4" de concreto 1:10 + 30% p.g
SS.HH (nios y nias)
SS.HH de la direccion
Deposito
Direccion
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 Zapatas
02.04.01.01
Concreto En Zapatas F'c = 210 Kg/Cm2
Z-1
Z-2
Z-3
02.04.01.02

Acero en zapatas f'y=4200 kg/cm2.

02.04.02 Vigas de Cimentacin


02.04.02.01 Concretos en vigas de cimentacion fc'=210 kg/
ejes 1,3,5,6,8,10
ejes A y B (L=31.53-(10*0.25))=29.00

M2

M2

M3

KG

M2

02.04.02.03 Acero en Vigas de cimentacion Grado 60

KG

02.04.03.02

Acero en columnas f'y=4200 kg/cm2.

0.70
0.70
0.70

5.60
8.06
10.75
446.78

M3

02.04.02.02 Encof. Y desencof. en Vigas de cimentacion


ejes 1,3,5,6,8,10
ejes A y B (L=31.53-(10*0.25))=29.00

02.04.03 Columnas
02.04.03.01
Concreto En Columnas F'c = 210 Kg/Cm2

METRADO

LARGO

eje 1,5,6,10
4.00
eje 3,8
2.00
2.00
eje A,B(largo=2.6+2.3+2.15+2.10+2.20+2.4+2.4+2.20=18.35)
Exc. Cimien. Vert. entre 3,4
1.00
Exc. Cimien. Vert. entre eje 4,5
1.00
Exc. Cimien. Horiz.entre arb. SS.HH direc. y dep.
1.00
Exc. Cimien. Horiz. Del SS.HH (nios y nias).
1.00
02.03.02 Sobrecimientos
02.03.02.01
Concreto 1:8+25% Pm Para Sobrecimientos
Eje 1,5,6,8,10
Eje 3 (largo=5.20-0.90)

DIMENSIONES

# VECES

0.40
0.40

3.12
5.80

24.96
46.40

1362.75

M3
0.40

3.50

7.00

KG
1027.32

PART.

DESCRIPCION

UNID.

Encofrado Y Desencofrado En Columnas

M2

DIMENSIONES

# VECES

LARGO

02.04.03.03

ANCHO

METRADO
ALTO

PARCIAL

3.30

85.80

7.70
14.75
1.50
1.35
1.90
29.00

7.70
6.49
0.08
0.04
0.19
2.03

20.00

1.30

10.00
4.00
1.00
1.00
2.00
1.00

0.25
area=
0.25
0.15
0.25
area=

1.00

2124.72

10.00
3.00
4.00
2.00
2.00
4.00
1.00

0.65
0.20
0.52
1.50
1.35
1.90
29.00

7.70
7.70
14.75
0.20
0.20
0.20
0.25

4.00
2.00
2.00
1.00

7.10
7.10
7.10
7.10

3.63
3.50
3.75
0.50

0.09
0.09
0.09
0.09

9.28
4.47
4.79
0.32

1.00

1590.00

4.00
2.00
2.00
1.00
2.00
2.00

7.10
7.10
7.10
7.10
29.40
6.90

3.63
3.50
3.75
0.50
0.40
0.40

_
_
_
_
_
_

103.09
49.70
53.25
3.55
23.52
5.52

8.33

area=

209.59

1745.88

03.01 MUROS Y TABIQUES DE ALBAILERIA


03.01.01 Muro ladrillo de arcilla de soga C.A. 1:4
M2
eje A sin vanos
eje A
eje B
Muro vert.entre eje 3,4
ventana
timpano
muro vert, entre eje 4,5
muro horiz entre amb.SS.HH direccion y deposito
muro horiz. SS.HH (nios y nias)

6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
4.00
7.60
4.70
0.15
5.20
3.35
1.20
4.10

1.50
2.50
2.50
2.50
0.60
0.90
2.50
3.40
2.50

03.01.02 Muro ladrillo de arcilla de cabeza C.A. 1:4


eje 5,6,8,10
eje 5,6,8,10 timpano
eje 1
eje 1 sin vanos
ejej 1 timpano
eje 3
eje 3 timpano
eje A
eje A sin vanos
eje B
eje B sin vanos

4.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.20
5.20
2.00
3.20
5.20
4.30
5.20
2.05
4.80
3.70
8.70

2.50
0.90
2.50
0.70
0.90
2.50
0.90
2.60
2.00
2.60
0.80

02.04.04 Vigas
02.04.04.01
Concreto En Vigas F'c=210 Kg/Cm2
Ejes verticales
Viga chata 101-102
Dintel P3 (SS.HH. Direccion)
Dintel P2 (Deposito)
Dintel V2, eje 1-1
Seccion 2-2
02.04.04.02

02.04.04.03

Acero en vigas f'y=4200 kg/cm2.

Encofrado Y Desencofrado En Vigas


ejes verticales
ejes 1,5,6,10
viga chata 101 * 102
Dintel P3 (SS.HH. Direccion)
Dintel P2 (Deposito)
Dintel V2, eje 1-1
Seccion 2-2

02.04.05 Losa Aligerada


02.04.05.01 Concreto en Losa Armada F'C = 210 kg/cm2
ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
alero izquierdo

02.04.05.02 Acero en Losa Armada f'y=4200 kg/cm2.

02.04.05.03 Encofrado y desencofrado en Losa Armada


ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
alero izquierdo
filetes de losa
filete lateral izquierda
02.04.05.04 Ladrillo hueco/arcilla 15x30x30 p/TA

M3
0.40
0.11
0.20
0.20
0.20
0.07

KG
2124.72

M3
50.05
4.62
30.68
0.60
0.54
1.52
7.25

M3

KG

M2

UND

03.00 ARQUITECTURA

03.02 REVOQUES, ENLUCIDOS Y MOLDURAS


03.02.01 TARRAJEO EN MUROS INTERIORES
Muros A Cabeza

0.50

27.00
10.00
19.00
11.75
0.09
2.34
8.38
4.08
10.25

M2

M2

0.50
0.50
0.50

52.00
9.36
5.00
1.12
4.68
5.38
4.68
5.33
9.60
9.62
6.96

PART.

DESCRIPCION

UNID.

eje 5,6,8,10
eje 5,6,8,10 timpano
eje 1-1
eje 1-1 sin vanos
eje 1-1 timpano
eje 3-3
eje 3-3 timpano
eje A-A
eje A-A sin V-3
eje A-A sin V-4
eje B-B
eje B-B sin V-5; V-6
Muros cabeza soga
eje A-A
eje A-A sin V-1
eje B-B
muro vert. Entre eje 3-4
muro vert. Entre eje 3-4 timpano
muro later. Entre 4,5
muro horiz. Entre amb.S.H de direccion y deposito
muro horiz. Entre amb (nios y nias)
muro vert. Entre eje 3-4
03.02.02 TARRAJEO EN MUROS EXTERIORES
eje 1-1
eje 1-1 sin vanos
eje 1-1 timpano
eje 5,6,8,10
eje 5,6,8,10 timpano
eje A-A cabeza
eje A-A cabeza sin V-3; V-4
eje A-A soga
eje A-A soga V-1
eje B-B cabeza
eje B-B cabeza sin V-5;V-6
eje B-B soga
muro vert. Entre eje 3-4
muro horiz. Soga SS.HH (nios y nias)

M2

03.02.03 TARRAJEO PRIMARIO RAYADO C/MORTERO 1:5


S.S.HH nios y nias
bebedero exterior h=1.50
bebedero exterior h=1.05
Urinario (perimetro)
Urinario base interior
Urinario (filete)
bebedero perimetro
bebedero base interior
bebedero (filete)

M2

03.02.04 TARRAJEO DE COLUMNAS


columnas con long. De tarrajeo=1.30
columnas con long. De tarrajeo=0.90
columnas con long. De tarrajeo=0.75
columnas con long. De tarrajeo=0.65
columnas con long. De tarrajeo=0.40
columnas con long. De tarrajeo=1.00
columnas con long. De tarrajeo=0.50
columnas con long. De tarrajeo=0.80
columnas con long. De tarrajeo=0.55

M2

03.02.05 TARRAJEO DE SUPERFICIE DE VIGAS


Ejes verticales
Ejes adic. 1,5,6,10
Viga chata
Seccion 2-2

M2

03.02.06 TARRAJEO EN CIELORAZO


ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
cieloraso izquierdo lateral
Filete de losa
Filete de losa lateral izquierdo

M2

DIMENSIONES

# VECES

METRADO

LARGO

ANCHO

5.00
5.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00

5.20
5.20
2.00
3.20
5.20
4.30
5.20
2.05
1.20
3.60
3.70
8.70

2.70
0.90
2.70
0.90
0.90
2.70
0.90
1.30
0.70
0.70
2.80
1.00

ALTO

6.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00

3.00
4.00
7.60
4.20
5.20
3.35
1.20
4.10
3.35

1.80
2.80
2.80
2.70
0.90
1.30
3.70
1.30
1.30

1.00
1.00
1.00
5.00
5.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00

2.00
3.20
5.20
5.20
5.20
2.05
4.80
3.00
4.00
3.70
8.70
7.60
1.20
4.10

2.30
0.50
0.90
2.30
0.90
2.30
1.70
1.30
2.30
2.30
0.50
2.30
2.20
2.30

2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

11.55
2.00
2.10
4.70
1.95
4.70
2.90
1.90
2.90

1.50
1.50
1.05
0.10
0.30
0.05
0.30
0.30
0.10

2.00
3.00
2.00
2.00
2.00
3.00
1.00
3.00
1.00

1.30
0.90
0.75
0.65
0.40
1.00
0.50
0.80
0.55

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

7.28
7.56
4.20
3.64
2.24
8.40
1.40
6.72
1.54

10.00
3.00
4.00
4.00

0.65
0.20
0.52
0.25

7.70
7.70
16.00
16.00

50.05
4.62
33.28
16.00

4.00
2.00
2.00
1.00
2.00
2.00

7.10
7.10
7.10
7.10
29.40
6.90

3.13
3.50
3.75
0.50
0.40
0.40

88.89
49.70
53.25
3.55
23.52
5.52

0.50

0.50
0.50

0.50

0.50
0.50

PARCIAL

70.20
11.70
5.40
2.88
2.34
23.22
4.68
2.67
0.84
2.52
10.36
8.70
32.40
11.20
21.28
11.34
4.68
8.71
8.88
5.33
4.36

4.60
1.60
2.34
59.80
11.70
4.72
8.16
23.40
9.20
8.51
4.35
17.48
2.64
9.43

34.65
3.00
2.21
0.47
0.59
0.24
1.74
0.57
0.29

PART.

DESCRIPCION

UNID.

03.02.07 TARRAJEO DE TECHO CON IMPERMEABILIZANTE


Longitud=32.03 - (0.10*0.40)=31.60

M2

03.02.08 VESTIDURA DE DERRAMES DE PUERTAS Y VENTA


V1
V2
V3
V4
V5
V6
P1
P2
P2 en SSHH. (nios y nias)
P3

03.03 CONTRAPISO
03.03.01 CONTRAPISOS Y PISOS
03.03.01.01 CONTRAPISO DE 25mm
SS. HH. de Direccin
SS.HH. Nios y Nias
Ambiente para la Direccin
03.03.01.02 Contrapiso de 48 mm. Concreto para piso mach
Aula 1 y 2
03.04 PISOS Y PAVIMENTOS
03.04.01 PISOS
03.04.01.01 PISO DE CERAMICO 30X30 CM SERIE MADERA
SS. HH. de Direccin
SS.HH. Nios y Nias
Ambiente para la direccin

M2

03.06 ZOCALOS
03.06.01 ZOCALOS CERAMICOS DE 20X30CM SERIE BALTI
S.S.HH nios y nias
bebedero exterior h=1.50
bebedero exterior h=1.05
Urinario (perimetro)
Urinario base interior
Urinario (filete)
bebedero perimetro
bebedero base interior
bebedero (filete)
03.06.02 Zocalo de Cemento.simple m 1:4 C:A H= 0.50 m
Eje A
Eje 1
Eje B menos P1 y SSHH.
Eje 5
Muro horiz. Entre 3 y 4
03.07 CARPINTERIA METALICA

ANCHO

ALTO

PARCIAL

1.00

31.60

7.70

243.32

2.00
6.00
1.00
1.00
2.00
2.00
3.00
1.00
2.00
1.00

8.00
6.80
3.60
4.80
6.26
9.60
6.60
6.50
5.60
5.10

16.00
40.80
3.60
4.80
12.52
19.20
19.80
6.50
11.20
5.10

1.00
2.00
1.00

2.65
3.35
7.50

1.20
2.90
5.70

3.18
19.43
42.75

2.00

7.60

5.60

85.12

1.00
2.00
1.00

2.65
3.35
7.50

1.20
2.90
5.70

3.18
19.43
42.75

1.00

2.80

1.20

3.36

2.00

7.60

5.60

85.12

1.00
1.00
1.00
1.00

32.05
5.90
0.50
32.05

2.00
2.25
6.00
1.20

64.10
13.28
3.00
38.46

1.00
2.00

9.20
32.05

0.10
0.10

0.92
6.41

2.00
1.00

26.46
25.80

2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

11.55
2.00
2.10
4.70
1.95
4.70
2.90
1.90
2.90

1.00
1.00
1.00
1.00
1.00

32.05
6.00
23.13
1.25
0.35

M2

03.04.01.03 Piso de madera machiembrado


Aula 1 y 2

03.05 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE MADERA
03.05.01.01 CONTRAZOCALO DE MADERA DE 4" RODON 1"
Aula 1, Aula 2
Direccion

LARGO

M2

M2

03.04.02.02 VEREDA - ENCOFRADO DESENCOFRADO


Vereda pegado a la direccion (lateral)
vereda frontal y posterior

METRADO

M2

03.04.01.02 Piso de cemento frotacho (color) e= 2.5cm


Depsito

03.04.02 VEREDAS
03.04.02.01 VEREDA DE E=4" fc=175 Kg/cm2
Vereda elevacion principal
Vereda pegado a los SS.HH. (nios y nias)
Vereda pegado a la Direccion (lateral)
Vereda hacia la calle

DIMENSIONES

# VECES

M2

M2

ML
52.92
25.80

ML
1.50
1.50
1.05
0.10
0.30
0.05
0.30
0.30
0.10

34.65
3.00
2.21
0.47
0.59
0.24
1.74
0.57
0.29

ML
32.05
6.00
23.13
1.25
0.35

PART.

DESCRIPCION

UNID.

DIMENSIONES

# VECES

LARGO

03.07.01 Ventana metalica perfiles de 1x1/8 fija marco


V1
V2
V3
V4
V5
V6

M2

03.07.02 Rejilla de desague pluvial y marco plat. 1 1/4"

ML

03.07.03 Puertas y Separadores metalicas c/marco Tubo


SS.HH.puertas
SS.HH.separadores
03.08 CARPINTERIA DE MADERA
03.08.01 Puertas Apaneladas marco cedro de 2"x4"
P1
P2
03.08.02 Puertas Contraplacadas c/triplay 4mm.
P3
03.09 CERRAJERA
03.09.01 Bisagra aluminizada Capuchina de 3"x3"
03.09.02 Bisagra simple de 3"
03.09.03 Cerradura para puerta forte de 03 Golpes
03.09.04 Cerradura para puerta forte de 02 Golpes
03.09.05 Cerradura para puerta tipo perilla

ALTO

PARCIAL

1.00
1.80
0.60
0.60
1.80
1.80

18.00
5.76
0.72
2.16
4.79
10.80

6.00
2.00
1.00
2.00
2.00
2.00

3.00
1.60
1.20
1.80
1.33
3.00

1.00

31.52

5.00
5.00

0.60
1.25

1.50
1.50

4.50
9.38

3.00
3.00

1.00
0.90

2.80
2.80

8.40
7.56

1.00

0.90

2.10

1.89

7.00
10.00
1.00
5.00
1.00

3.00
1.00
1.00
1.00
1.00

1.00

42.23

31.52

M2

M2

M2

UND
UND
UND
UND
UND

03.10 VIDRIOS, CRISTALES Y SIMILARES


03.10.01 Vidrios semidobles incoloro crudo
Ventanas

PIE

03.11 PINTURA
03.11.01 Pintura latex en cielo raso 2 manos
Partida 03.02.06

M2

21.00
10.00
1.00
5.00
1.00

10.76

454.39

224.43

03.11.02 Pintura latex en muros interiores 2 manos


Partida 03.02.01

M2

03.11.03 Pintura latex en muros exteriores 2 manos


Partida 03.02.02

M2

03.11.04 Pintura en superficies de vigas 2 manos


Partida 03.02.05

M2

03.11.05 Pintura en superficies de columnas 2 manos


Partida 03.02.04

M2

03.11.06 Pintura en puertas c/barniz 2 manos


Partidas 03.08.01 Y 03.08.02

M2

03.11.07 Pintura en ventanas metalicas C/Antic. + Esma


Partidas 03.07.01

M2

03.11.08 Pintura en Puertas y Separadores Met. C/Antic.


Partidas 03.07.03

M2

03.12 APARATOS Y ACCESORIOS SANITARIOS


03.12.01 Inodoros
Inodoro Tanque Bajo losa blanca (c/accesorios)
Inodoro Tanque Bajo losa blanca (para nios)
03.12.02 Lavatorios
Lavatorios de pared blanco 1 llave (c/accesorios)
03.12.03 Urinarios
Urinario de Sitio
03.12.04 Lavaderos
Lavadero de 2.1x0.60 m, c/3 grifos (inc. Accesor)

ANCHO

METRADO

253.68

167.93

103.95

42.98

2.00

17.85

2.00

42.23

2.00

13.88

1.00
5.00

1.00
5.00

1.00

1.00

1.00

1.00

1.00

1.00

PZA

PZA
PZA
PZA

04.00 INSTALACIONES SANITARIAS


04.01 SALIDAS DE DESAGUE
04.01.01 Salida PVC SAP desague 2"

PTO

04.01.02 Salida PVC SAP desague 4"

PTO

7.00

7.00

6.00

6.00

PART.

DESCRIPCION

04.01.03 Salida PVC SAP ventilacion 2"

04.02 REDES DE DERIVACION


04.02.01 Tuberia PVC SAP 4"

04.02.02 Tuberia PVC SAP 2"

UNID.

DIMENSIONES

# VECES

METRADO

LARGO

ANCHO

ALTO

PARCIAL

5.00

5.00

1.00

25.80

25.80

1.00

12.00

12.00

8.00

4.50

36.00

PTO

ML

ML

04.02.03 Tuberia PVC SAP 3"

ML
Desague pluvial

04.03 ACCESORIOS R/DERIV DE DESAGUE


04.03.01 Yee de PVC SAL SP simpel de 2"
04.03.02 Yee de PVC SAL SP, ramal de cond. 4-2"
04.03.03 Yee PVC SAL 4"
04.03.04 Codos PVC SAL de 4"x90
04.03.05 Codos PVC SAL de 3"x90
04.03.06 Codos PVC SAL de 2"x90
04.03.07 Registro de bronce de 4" prov. de coloc.
04.03.08 Registro de bronce de 3" prov. de coloc D. Pluv
04.03.09 Registro de bronce de 2" prov. de coloc.
04.03.10 Caja de Registro de 12" x 24" c/tapa c
04.03.11 Tee PVC SAL 4"x4"
04.03.12 Tee PVC SAL 4"x2"
04.03.13 Trampa "P" de PVC para desague de 2"
04.03.14 Sumidero de bronce 2", prov. de coloc.
04.03.15 Excavacion para Instalac. Sanit. Hasta 1.00 m T

PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA

04.04 SISTEMAS DE AGUA FRIA


04.04.01 Salida de Agua Fria con tub. PVC-SAP 1/2"

PTO

04.04.02 Tuberia PVC SAP 1/2"

ML

04.04.03 Tuberia PVC SAP 3/4"

ML

04.04.04 Vlvula de compuerta de bronce de union roscd

UND

04.04.05 Codo PVC SAP 1 1/2"


04.04.06 Tee PVC SAP 1 1/2"
04.04.07 Grifo Cromado 1/2

UND
UND
UND

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00
3.00
1.00
2.00
5.00
5.00
1.00

37.80

0.40

0.40

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00
3.00
1.00
2.00
5.00
5.00
6.05

11.00

11.00

1.00

18.00

18.00

1.00

18.00

18.00

4.00
6.00
4.00
4.00

_
_
_
_

_
_
_
_

_
_
_
_

4.00
6.00
4.00
4.00

23.00

23.00

15.00

15.00

10.00

10.00

11.00

11.00

12.00

12.00

15.00

15.00

10.00

10.00

1.00

210.00

210.00

1.00

35.00

35.00

05.00 INSTALACIONES ELECTRICAS


05.01 SALIDA PARA ELECTRICIDAD
05.01.01 Salida para centro de luz

05.01.02 Salida para interruptores bipolares simples

05.01.03 Salida para interruptor

PTO

PTO

PTO

05.02 INSTALACION DE ARTEFACTOS ELECTRICOS


05.02.01 Foco Incandescente
UND

05.02.02 Artefacto fluorecente 1x40w TPR-240

05.02.03 Tomacorriente simple bipolar

05.02.04 Interruptor simple

05.03 CANALIZACIONES Y/O TUBERIAS


05.03.01 Tuberia PVC SAP (elect.) 3/4"

05.03.02 Tuberias PVC SEL (Electricas) D=3/4"

UND

UND

UND

ML

ML

PART.

DESCRIPCION

UNID.

DIMENSIONES

# VECES

LARGO

05.04 CONDUCTORES Y/O CABLES


05.04.01 Cable electrico TW AWG N 10

ML

05.04.02 Cable electrico TW AWG N 12

ML

05.04.03 Cable electrico TW AWG N 14

ML

05.04.04 Alambre desn. 1x16mm2 Cu 15mm PVC SAP

ML

ANCHO

METRADO
ALTO

PARCIAL

1.00

20.00

20.00

1.00

200.00

200.00

1.00

200.00

200.00

1.00

10.00

10.00

05.05 TABLEROS Y CUCHILLAS


05.05.01 Tablero General Caja Metlica
05.05.02 Tableros distribucion caja metalica T-D1
05.05.03 Tableros distribucion caja metalica T-D2

PZA
PZA
PZA

1.00
1.00
1.00

_
_
_

_
_
_

_
_
_

1.00
1.00
1.00

05.06 POZO A TIERRA


05.06.01 Pozo conexin a tierra

UND

1.00

1.00

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.80
0.80
0.80
0.80
0.80

_
_
_
_
_

27.36
27.69
21.28
18.14
5.53

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.80
0.80
0.80
0.80
0.80

_
_
_
_
_

27.36
27.69
21.28
18.14
5.53

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.50
0.50
0.50
0.40
0.40

0.50
0.50
0.50
0.50
0.50

8.55
8.65
6.65
4.53
1.38

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.35
0.25
0.25
0.25
0.35

0.20
0.20
0.20
0.20
0.20

2.39
1.73
1.33
1.13
0.48

CERCO PERIMETRICO
06.00 CERCO PERIMETRICO
06.01 TRABAJOS PRELIMINARES
06.01.01 Limpieza de terreno manual
Lado
Lado
Lado
Lado
Lado

M2
Norte
Sur
Este
Oeste 1
Oeste 2

06.01.02 Trazo niveles y replanteo

M2
Lado
Lado
Lado
Lado
Lado

Norte
Sur
Este
Oeste 1
Oeste 2

06.02 MOVIMIENTO DE TIERRAS


06.02.01 Excavacin de zanjas para Cimiento
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)
06.02.02 Relleno con material propio
Lado
Lado
Lado
Lado
Lado

M3

M3
Norte (Caravista)
Sur (Caravista)
Este (Caravista)
Oeste 1 (Reja)
Oeste 2 (Reja)

06.02.03 Eliminacin de material excedente


M3
f(e)
Con 25% de esponjamiento.
1.25
Excavacin de zanjas para Cimiento
Relleno con material propio
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 Cimientos
M3
06.03.01.01 Cimientos corridos mezcla 1:10 Cemento-Hormigon+ 30% P.G.
Lado Norte (Caravista)
10.00
Lado Sur (Caravista)
11.00
Lado Este (Caravista)
8.00
Lado Oeste 1 (Reja)
6.00
Lado Oeste 2 (Reja)
2.00
06.03.02. Sobrecimientos
06.03.02.01 Concreto 1:8 + 25% P.M Sobrecimiento
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)

M3

06.03.02.02 Encofrado y desencofrado de sobrecimientos h=


Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)

M2

22.70

28.37

29.77
7.07

3.00
3.25
3.00
3.37
2.96

0.50
0.50
0.50
0.40
0.40

0.50
0.50
0.50
0.50
0.50

7.50
8.94
6.00
4.04
1.18

10.00
11.00
8.00
6.00
2.00

3.00
3.25
3.00
3.37
2.96

0.15
0.15
0.15
0.15
0.15

0.40
0.40
0.40
0.40
0.40

1.80
2.15
1.44
1.21
0.36

20.00
22.00
16.00

3.00
3.25
3.00

0.40
0.40
0.40

24.00
28.60
19.20

PART.

DESCRIPCION

UNID.

DIMENSIONES

# VECES

LARGO

Lado Oeste 1 (Reja)


Lado Oeste 2 (Reja)
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 Columnas
06.04.01.01 Concreto en Columnas F'C = 210 kg/cm2
C-4
C-5
06.04.01.02 Acero en Columnas f'y=4200 kg/cm2.
C-4
Fe. 1/2"
Fe. 3/8" Estribus
C-5
Fe. 1/2"
Fe. 3/8" Estribus
06.04.01.03 Encofrado y desencofrado en Columnas
C-4
C-5
06.04.02 Vigas
06.04.02.01 Concreto en Vigas F'C = 210 kg/cm2
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)

KG

M2

2.40
2.40
Kg/m

5.55
1.58
Sub Total

4.00
20.00

3.60
1.00

1.02
0.58

543.46
429.20

11.00
11.00

4.00
20.00

3.60
0.90

1.02
0.58

161.57
114.84

37.00
11.00

1.00
1.10

2.40
2.40

88.80
29.04

20.00
22.00
16.00

3.00
3.25
3.00

0.25
0.25
0.25

0.20
0.20
0.20

3.00
3.58
2.40

Cant.

N veces

Long.

Kg/m

Sub Total

9.00
9.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
3.60
0.90

1.02
0.58
1.02
0.58

110.16
112.75
14.69
12.53

10.00
10.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
2.75
0.90

1.02
0.58
1.02
0.58

122.40
125.28
11.22
12.53

7.00
7.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
2.80
0.90

1.02
0.58
1.02
0.58

85.68
87.70
11.42
12.53

10.00
11.00
8.00

3.00
3.25
3.00

2.00
2.00
2.00

0.20
0.20
0.20

12.00
14.30
9.60

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

_
_
_
_
_
_

2.00
2.00
2.00
2.00
2.00
2.00

54.00
7.32
60.00
5.50
42.00
5.60

37.00
11.00

0.50
0.80

2.40
2.40

44.40
21.12

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

18.00
2.00
20.00
2.00
14.00
2.00

3.00
3.66
3.00
2.75
3.00
2.80

0.25
0.40
N veces

37.00
37.00

M2

Lado Sur (Caravista)


Lado Este (Caravista)

M2

M2

Lado Sur (Caravista)


Lado Este (Caravista)

1.05
1.05
1.05
1.05
1.05
1.05

28.35
3.84
31.50
2.89
22.05
2.94

M2

Lado Sur (Caravista)


Lado Este (Caravista)

06.07 CARPINTERIA METALICA


06.07.01 Puerta contraplacada metalica tubo de 1 y pla

0.25
0.15
Long.

37.00
11.00
Cant.

M3

06.04.02.03 Encofrado y desencofrado en Vigas


Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)

06.06.03 Tarrajeo en sobrecimientos Cemento Arena 1:5


Lado Norte (Caravista)

16.18
4.74

M2

KG

06.06 REVOQUES, ENLUCIDOS Y MOLDURAS


06.06.01 Tarrajeo de superficie de columnas Cemento Are
C-4
C-5
06.06.02 Tarrajeo de superficie de vigas Cemento Arena 1
Lado Norte (Caravista)

PARCIAL

0.40
0.40

3.37
2.96

M3

06.04.02.02 Acero en Vigas f'y=4200 kg/cm2.


Lado Norte (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Lado Sur (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Lado Este (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus

06.05 MUROS Y TABIQUES DE ALBAILERIA


06.05.01 Muro de soga Caravista C.A. 1:5
Lado Norte (Caravista)

ALTO

12.00
4.00

ANCHO

METRADO

M2

0.40
0.40
0.40
0.40
0.40
0.40

21.60
2.93
24.00
2.20
16.80
2.24

PART.

DESCRIPCION

06.07.02 Reja de metalica tubo negro de 2"


Cerco perimetrico
Lado Oeste 1 (Reja)

UNID.

DIMENSIONES

# VECES

METRADO

LARGO

ANCHO

ALTO

PARCIAL

1.00

3.00

2.40

7.20

6.00
1.00
2.00
1.00

3.00
2.22
2.92
0.93

2.00
2.00
2.00
2.00

36.00
4.44
11.68
1.86

1.00

1.00

1.00

37.00
11.00

0.50
0.80

2.40
2.40

44.40
21.12

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

18.00
2.00
20.00
2.00
14.00
2.00

3.00
3.66
3.00
2.75
3.00
2.80

1.00

3.00

6.00
1.00
2.00
1.00

3.00
2.22
2.92
0.93

M2

Lado Oeste 2 (Reja)

06.08 CERRAJERA
06.08.01 Cerradura puerta de sobre poner de 2 golpes, llav PZA
06.09 PINTURA
06.09.01 Pintura en columnas c/latex 2 manos
C-4
C-5
06.09.02 Pintura en vigas c/latex 2 manos
Lado Norte (Caravista)

M2

M2

Lado Sur (Caravista)


Lado Este (Caravista)

06.09.03 Pintura en sobrecimientos c/latex 2 manos


Lado Norte (Caravista)

1.05
1.05
1.05
1.05
1.05
1.05

28.35
3.84
31.50
2.89
22.05
2.94

M2

Lado Sur (Caravista)


Lado Este (Caravista)

06.09.04 Pintura en Carpinteria metalica


Puerta contraplacada metalica tubo de 1
P-7
Reja de tubo negro de 2"
Lado Oeste 1 (Reja)

0.40
0.40
0.40
0.40
0.40
0.40

21.60
2.93
24.00
2.20
16.80
2.24

2.40

7.20

2.00
2.00
2.00
2.00

36.00
4.44
11.68
1.86

M2

Lado Oeste 2 (Reja)

OBRAS EXTERIORES
07.00 OBRAS EXTERIORES
07.01.01 Limpieza de terreno manual
M2
Patio de Formacion, acceso y cir 1.00
07.01.02 Trazo niveles y replanteo

Area=

576.24

576.24

Area=

576.24

576.24

1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60
0.60
0.60
0.60

4.95
0.25
2.21
1.03
0.79
0.96
1.22

1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.52
0.03
0.23
0.11
0.08
0.10
0.13

M2
Patio de Formacion, acceso y cir 1.00

07.02 MOVIMIENTO DE TIERRAS


07.02.01 Excavacin de zanjas para Sardineles
En acceso

M3

En circulacion exterior

07.02.02 Relleno con material propio


En acceso

M3

En circulacion exterior

07.02.03 Eliminacin de material excedente


Con 25% de esponjamiento.
Excavacin de zanjas para Cimiento
Relleno con material propio
07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 Concreto simple fc=175 kg/cm2
07.03.01.01 Concreto simple en sardineles
En acceso

M3

f(e)
1.25

10.23

12.78

11.42
1.19
M3
1.00

20.63

Area=

0.22

4.54

DESCRIPCION

PART.

UNID.

En circulacion exterior

07.03.01.02 Encofrado y desencofrado de Sardineles


En acceso

METRADO

LARGO

ANCHO

ALTO

PARCIAL

1.00
1.00
1.00
1.00
1.00
1.00

1.03
9.21
4.31
3.29
4.02
5.08

Area=
Area=
Area=
Area=
Area=
Area=

0.22
0.22
0.22
0.22
0.22
0.22

0.23
2.03
0.95
0.72
0.88
1.12

2.00
2.00
2.00
2.00
2.00
2.00
2.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.10
0.10
0.10
0.10
0.10
0.10
0.10

4.13
0.21
1.84
0.86
0.66
0.80
1.02

15.00

4.00

0.15

27.00

6.00
4.00

10.00
20.00

0.15
0.15

9.00
12.00

1.00
1.00

Area=
Area=

86.22
30.06

_
_

86.22
30.06

1.00

20.00

10.00

1.00
1.00

Area=
Area=

86.22
30.06

1.00

20.00

10.00

2.00
4.00

20.00
10.00

1.00

1.00

1.00
1.00

_
_

_
_

_
_

1.00
1.00

M2

En circulacion exterior

07.03.01.03 Concreto simple en losa

DIMENSIONES

# VECES

M3
En patio de formacion

07.03.01.04 Encofrado y desencofrado de losa


En patio de formacion

3.00

M2

07.04 PISOS Y PAVIMENTOS


07.04.01 Nivelacion y Apisonado para Piso
En acceso
En circulacion exterior

M2

En patio de formacion
07.04.02 Piso de adoquin de concreto
En acceso
En circulacion exterior

M2

07.04.03 Piso de Cemento pulido, coloreado y bruado


En patio de formacion
07.04.04 JUNTAS DE DILATACION C/ASFALTO
En patio de formacion

M2

07.05 JARDINERIA
07.05.01 Sembrado de grass y plantas
Jardin

200.00

_
_

86.22
30.06

200.00

ML
40.00
40.00

GLB

VARIOS

08.00 VARIOS

08.01 Limpieza final de obra


08.02 Placa recordatoria

UND
UND

RA

O PROGRESO

FECHA: HUANCAYO - JUNIO 2013


DEPARTAMENTO: JUNIN
METRADO
TOTAL

1.00
1.00
127.10
1.00

1.00
299.28
299.28
1.00

41.86

37.43

16.70

78.24
270.09

24.60

METRADO
TOTAL

6.51

68.77

34.88

68.72

24.42

446.78

8.92

71.36

1362.75

7.00

1027.32

METRADO
TOTAL

85.80

16.53

6.9

2124.72

6.9

1.15

95.26

18.86

1590.00

238.63

1745.88

92.89

113.73

253.68

METRADO
TOTAL

167.93

43.75

42.98

103.95

224.43

METRADO
TOTAL

243.32

139.52

65.36

85.12

65.36

3.36

85.12

118.84

7.33

78.72

43.75

62.78

METRADO
TOTAL

42.23

31.52

13.88

15.96

1.89

21.00
10.00
1.00
5.00
1.00

454.39

224.43

253.68

167.93

103.95

42.98

35.70

84.46

27.76

6.00

1.00
1.00
1.00

7.00
6.00

METRADO
TOTAL

5.00

25.80

12.00

36.00

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00
3.00
1.00
2.00
5.00
5.00
6.05

11.00
18.00
18.00
4.00
6.00
4.00
4.00

23.00

15.00

10.00

11.00

37.00

15.00

255.00

210.00

35.00

METRADO
TOTAL

20.00
200.00
200.00
10.00

1.00
1.00
1.00

1.00

99.99

99.99

29.77

7.07

28.37

27.67

6.95

92.71

METRADO
TOTAL

7.13

1249.06

117.84

8.98

718.88

35.90

174.42

65.52

91.57

69.77

7.20

METRADO
TOTAL

53.98

1.00

65.52

91.57

69.77

61.18

576.24

576.24

11.42

1.19

12.78

10.47

METRADO
TOTAL

9.51

27.00

21.00

316.28

116.28

200.00
80.00

1.00

1.00
1.00

PLANILLA DE METRADOS DE OBRA


MEJORAMIENTO DE LA I.E. INICIAL SANTA FELICITA - BARRIO PROGRESO
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE HUANCAN
CONSULTOR: ING. ANGEL TOMAS CANCHANYA PEA
DISTRITO: HUANCAN
PART.

FECHA: HUANCAYO - JUNIO 2013

PROVINCIA: HUANCAYO

DESCRIPCION

UNID.

DEPARTAMENTO: JUNIN
DIMENSIONES

# VECES

METRADO

LARGO

ANCHO

ALTO

PARCIAL

TOTAL

1.00
1.00
1.00
1.00

_
_
127.10
_

_
_

_
_

1.00
1.00
127.10
1.00

1.00
1.00
127.10
1.00

1.00

1.00

1.00

Area=

299.28

299.28

1.00

Area=

299.28

299.28

1.00

1.00

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

1.20
1.20
1.20

9.60
13.82
18.43

4.00
2.00
2.00
1.00
1.00
1.00
1.00

4.30
3.80
18.35
5.10
2.25
0.95
5.55

0.50
0.50
0.50
0.40
0.40
0.40
0.40

1.10
1.10
1.10
0.65
0.65
0.65
0.65

9.46
4.18
20.19
1.33
0.59
0.25
1.44

2.00
2.00
1.00
1.00
1.00
1.00
2.00
8.00

4.30
3.80
5.10
2.25
0.95
5.55
18.35
Area=

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.73

0.40
0.40
0.15
0.15
0.15
0.15
0.40
0.40

0.86
0.76
0.19
0.08
0.04
0.21
3.67
2.34

4.00
2.00

Area=
Area=

1.55
1.38

0.40
0.40

2.48
1.10

4.00
2.00

Area=
Area=

2.12
1.97

0.40
0.40

3.39
1.58

1.00

78.24

2.00
2.00
1.00

7.65
2.90
1.20

MODULO AULA - SS.HH


01.00 OBRAS PROVISIONALES
01.01 Almacen y guardiania
01.02 Cartel de obra de 3.60 X 2.40
01.03 Cerco Perimetrico Provicional
01.04 Movilizacion y desmovilizacion de Equipos

GBL
UND
M
GLB

02.00 ESTRUCTURAS
02.01 TRABAJOS PRELIMINARES
02.01.01 Demolicion de Construccion Existente
Losa deportiva
02.01.02 Limpieza de terreno manual
02.01.03 Trazo niveles y replanteo
02.01.04 Eliminacion Desmonte de Demolicion

02.02 MOVIMIENTO DE TIERRAS


02.02.01
Excavacin de zanjas para zapatas
Z-1
Z-2
Z-3
02.02.02

02.02.03

02.02.04
02.02.05

GBL
M2

299.28

M2

299.28

GLB

1.00

M3

Excavacin de zanjas para cimientos


M3
Eje 1,5,6,10
Eje 3,8
Eje A,B (Largo=18.35 m.)
Exc. Cimiento vert. Entre eje 3-4
Exc. Cimiento vert. Entre eje 4-5
Exc. Cimiento Horiz.Entre amb.SSHH Comedor.y dep.
Exc. Cimiento Horiz. En SS.HH (nios y nias)
Relleno con material propio
M3
Eje 1,5,6,10
Eje 3,8
Eje A,B (Largo=18.35 m.)
Exc. Cimiento vert. Entre eje 3-4
Exc. Cimiento vert. Entre eje 4-5
Exc. Cimiento Horiz. Entre amb.SS.HH direc.y dep.
Exc. Cimiento Horiz. En SS.HH. (nios y nias)
Z1(1.00*1.00)
Z2(1.60*1.20)
Tipo 1 (2 encuentros con viga de ciment).
Tipo 2 (3 encuentros con viga de ciment).
Z3(1.60*1.60)
Tipo 1 (2 encuentros con viga de ciment).
Tipo 2 (3 encuentros con viga de ciment).

Eliminacin de material excedente con equi


Nivelacin y compactacin interior c/equipo
Aulas A-1,A,2
SS.HH (nios y nias)
SS.HH (Direccion)

1.00

M3
M2

41.86

37.43

16.70

78.24
5.50
3.35
2.65

_
_
_

84.15
19.43
3.18

78.24
270.09

Deposito
Direccion
Vereda elevacion principal
Vereda pegado a los Ss.Hh. (nios y nias)
Vereda pegado a la direccion (lateral)
Vereda hacia la calle

1.00
1.00
1.00
1.00
1.00
1.00

1.20
7.50
32.05
5.90
0.50
32.05

2.70
5.50
2.00
2.25
6.00
1.20

_
_
_
_
_
_

3.24
41.25
64.10
13.28
3.00
38.46

02.03 OBRAS DE CONCRETO SIMPLE


02.03.01 Cimientos
02.03.01.01
Cimientos corridos mezcla 1:10 cemento-h
M3
eje 1,5,6,10
4.00
eje 3,8
2.00
2.00
eje A,B(largo=2.6+2.3+2.15+2.10+2.20+2.4+2.4+2.20=18.35)
Exc. Cimien. Vert. entre 3,4
1.00
Exc. Cimien. Vert. entre eje 4,5
1.00
Exc. Cimien. Horiz.entre arb. SS.HH direc. y dep.
1.00
Exc. Cimien. Horiz. Del SS.HH (nios y nias).
1.00

4.30
3.80
18.35
5.50
3.20
1.10
5.55

0.50
0.50
0.50
0.40
0.40
0.40
0.40

0.70
0.70
0.70
0.50
0.50
0.50
0.50

6.02
2.66
12.85
1.10
0.64
0.22
1.11

5.00
1.00
1.00
1.00

5.20
4.30
7.65
13.80

0.25
0.25
0.15
0.25

0.30
0.30
0.40
0.30

1.95
0.32
0.46
1.04

1.00
1.00
1.00
1.00
1.00
1.00

22.10
7.00
4.70
3.35
1.20
4.10

0.15
0.15
0.15
0.15
0.15
0.15

0.40
0.30
0.55
0.55
0.55
0.55

1.33
0.32
0.39
0.28
0.10
0.34

10.00
2.00
2.00
2.00

5.20
4.30
7.65
13.18

0.30
0.30
0.40
0.30

15.60
2.58
6.12
7.91

2.00
2.00
2.00
2.00
2.00
2.00

22.10
7.00
4.70
3.35
1.20
4.10

0.40
0.30
0.55
0.55
0.55
0.55

17.68
4.20
5.17
3.69
1.32
4.51

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

8.00
11.52
15.36

2.00
1.00
1.00
1.00

2.90
1.20
1.20
7.50

3.35
2.65
2.80
5.70

19.43
3.18
3.36
42.75

8.00
6.00
6.00

1.00
1.60
1.60

1.00
1.20
1.60

1.00

446.78

02.03.02 Sobrecimientos
02.03.02.01
Concreto 1:8+25% Pm Para Sobrecimientos
Eje 1,5,6,8,10
Eje 3 (largo=5.20-0.90)

M3

Eje B espesor 0.15 cm2(L=3.65+2.65+1.35 )=7.65


Eje Bespesor 0.25 cm(L=2.65+3.75+3.75+3.65 )=13.80
Eje A espesor 0.15 cm2
(L=3.65+3.65+3.65+0.00+3.75+3.75+3.65 )=22.10
Eje A espesor 0.25 (L=3.50+3.50)=7
Sobrecimientovert. Entre eje 3,4
Sobrecimiemto vert entre eje 4,5
Sobrecimiento horiz.entre amb.SS.HH direc.y dep
Sobrecimiento horiz. del SS.HH (nios y nias)
02.03.02.02

Encofrado Y Desencofrado Para Sobrecimien


Eje 1,5,6,8,10
Eje 3 (largo=5.20-0.90)

02.03.04 Falso Piso


02.03.04.01
Falso piso de 4" de concreto 1:10 + 30% p.g
SS.HH (nios y nias)
SS.HH de la direccion
Deposito
Direccion
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 Zapatas
02.04.01.01
Concreto En Zapatas F'c = 210 Kg/Cm2
Z-1
Z-2
Z-3
02.04.01.02

Acero en zapatas f'y=4200 kg/cm2.

02.04.02 Vigas de Cimentacin

6.51

M2

Eje B espesor 0.15 cm2(L=3.65+2.65+1.35)=7.65


Eje Bespesor 0.25 cm(L=2.65+3.75+3.75+3.65)=13.80
Eje A espesor 0.15 cm2
(L=3.65+3.65+3.65+0.00+3.75+3.75+3.65 )=22.10
Eje A espesor 0.25 (L=3.50+3.50)=7
Sobrecimientovert. Entre eje 3,4
Sobrecimiemto vert entre eje 4,5
Sobrecimientohoriz.entre amb.SS.HH direc.y dep
Sobrecimiento horiz. del SS.HH (nios y nias)
02.03.03 Solado
02.03.03.01
Solados Para Zapatas E=4" 1:12 C:A
Z-1
Z-2
Z-3

24.60

68.77

M2

34.88

M2

68.72

M3

KG

24.42
0.70
0.70
0.70

5.60
8.06
10.75
446.78

446.78

02.04.02.01 Concretos en vigas de cimentacion fc'=210 kg/


ejes 1,3,5,6,8,10
ejes A y B (L=31.53-(10*0.25))=29.00

M3

02.04.02.02 Encof. Y desencof. en Vigas de cimentacion


ejes 1,3,5,6,8,10
ejes A y B (L=31.53-(10*0.25))=29.00

M2

02.04.02.03 Acero en Vigas de cimentacion Grado 60

KG

02.04.03 Columnas
02.04.03.01
Concreto En Columnas F'c = 210 Kg/Cm2

02.04.03.02

02.04.03.03

Acero en columnas f'y=4200 kg/cm2.

Encofrado Y Desencofrado En Columnas

02.04.04 Vigas
02.04.04.01
Concreto En Vigas F'c=210 Kg/Cm2
Ejes verticales
Viga chata 101-102
Dintel P3 (SS.HH. Direccion)
Dintel P2 (Deposito)
Dintel V2, eje 1-1
Seccion 2-2
02.04.04.02

02.04.04.03

Acero en vigas f'y=4200 kg/cm2.

Encofrado Y Desencofrado En Vigas


ejes verticales
ejes 1,5,6,10
viga chata 101 * 102
Dintel P3 (SS.HH. Direccion)
Dintel P2 (Deposito)
Dintel V2, eje 1-1
Seccion 2-2

02.04.05 Losa Aligerada


02.04.05.01 Concreto en Losa Armada F'C = 210 kg/cm2
ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
alero izquierdo

02.04.05.02 Acero en Losa Armada f'y=4200 kg/cm2.

02.04.05.03 Encofrado y desencofrado en Losa Armada


ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
alero izquierdo
filetes de losa
filete lateral izquierda
02.04.05.04 Ladrillo hueco/arcilla 15x30x30 p/TA

8.92
6.00
2.00

5.20
29.00

0.25
0.25

0.40
0.40

3.12
5.80

12.00
4.00

5.20
29.00

0.40
0.40

1.00

1362.75

20.00

0.25

1.00

1027.32

20.00

1.30

10.00
4.00
1.00
1.00
2.00
1.00

0.25
area=
0.25
0.15
0.25
area=

1.00

2124.72

10.00
3.00
4.00
2.00
2.00
4.00
1.00

0.65
0.20
0.52
1.50
1.35
1.90
29.00

7.70
7.70
14.75
0.20
0.20
0.20
0.25

4.00
2.00
2.00
1.00

7.10
7.10
7.10
7.10

3.63
3.50
3.75
0.50

1.00

1590.00

4.00
2.00
2.00
1.00
2.00
2.00

7.10
7.10
7.10
7.10
29.40
6.90

3.63
3.50
3.75
0.50
0.40
0.40

_
_
_
_
_
_

103.09
49.70
53.25
3.55
23.52
5.52

8.33

area=

209.59

1745.88

6.00
1.00

3.00
4.00

1.50
2.50

71.36
24.96
46.40
1362.75
1362.75

M3

7.00
0.40

3.50

7.00

KG

1027.32
1027.32

M2

85.80
3.30

85.80

7.70
14.75
1.50
1.35
1.90
29.00

7.70
6.49
0.08
0.04
0.19
2.03

M3

16.53
0.40
0.11
0.20
0.20
0.20
0.07

KG

2124.72
2124.72

M3

95.26
50.05
4.62
30.68
0.60
0.54
1.52
7.25

M3

18.86
0.09
0.09
0.09
0.09

9.28
4.47
4.79
0.32

KG

1590.00

M2

238.63

UND

1745.88

03.00 ARQUITECTURA
03.01 MUROS Y TABIQUES DE ALBAILERIA
03.01.01 Muro ladrillo de arcilla de soga C.A. 1:4
eje A sin vanos
eje A

M2

92.89
27.00
10.00

eje B
Muro vert.entre eje 3,4
ventana
timpano
muro vert, entre eje 4,5
muro horiz entre amb.SS.HH direccion y deposito
muro horiz. SS.HH (nios y nias)
03.01.02 Muro ladrillo de arcilla de cabeza C.A. 1:4
eje 5,6,8,10
eje 5,6,8,10 timpano
eje 1
eje 1 sin vanos
ejej 1 timpano
eje 3
eje 3 timpano
eje A
eje A sin vanos
eje B
eje B sin vanos

1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.60
4.70
0.15
5.20
3.35
1.20
4.10

2.50
2.50
0.60
0.90
2.50
3.40
2.50

4.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.20
5.20
2.00
3.20
5.20
4.30
5.20
2.05
4.80
3.70
8.70

2.50
0.90
2.50
0.70
0.90
2.50
0.90
2.60
2.00
2.60
0.80

0.50

19.00
11.75
0.09
2.34
8.38
4.08
10.25

M2

03.02 REVOQUES, ENLUCIDOS Y MOLDURAS


03.02.01 TARRAJEO EN MUROS INTERIORES
M2
Muros A Cabeza
eje 5,6,8,10
eje 5,6,8,10 timpano
eje 1-1
eje 1-1 sin vanos
eje 1-1 timpano
eje 3-3
eje 3-3 timpano
eje A-A
eje A-A sin V-3
eje A-A sin V-4
eje B-B
eje B-B sin V-5; V-6
Muros cabeza soga
eje A-A
eje A-A sin V-1
eje B-B
muro vert. Entre eje 3-4
muro vert. Entre eje 3-4 timpano
muro later. Entre 4,5
muro horiz. Entre amb.S.H de direccion y deposito
muro horiz. Entre amb (nios y nias)
muro vert. Entre eje 3-4
03.02.02 TARRAJEO EN MUROS EXTERIORES
eje 1-1
eje 1-1 sin vanos
eje 1-1 timpano
eje 5,6,8,10
eje 5,6,8,10 timpano
eje A-A cabeza
eje A-A cabeza sin V-3; V-4
eje A-A soga
eje A-A soga V-1
eje B-B cabeza
eje B-B cabeza sin V-5;V-6
eje B-B soga
muro vert. Entre eje 3-4
muro horiz. Soga SS.HH (nios y nias)

M2

03.02.03 TARRAJEO PRIMARIO RAYADO C/MORTERO 1:5


S.S.HH nios y nias
bebedero exterior h=1.50
bebedero exterior h=1.05
Urinario (perimetro)

M2

113.73
0.50
0.50
0.50

52.00
9.36
5.00
1.12
4.68
5.38
4.68
5.33
9.60
9.62
6.96

253.68
5.00
5.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00

5.20
5.20
2.00
3.20
5.20
4.30
5.20
2.05
1.20
3.60
3.70
8.70

2.70
0.90
2.70
0.90
0.90
2.70
0.90
1.30
0.70
0.70
2.80
1.00

6.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00

3.00
4.00
7.60
4.20
5.20
3.35
1.20
4.10
3.35

1.80
2.80
2.80
2.70
0.90
1.30
3.70
1.30
1.30

1.00
1.00
1.00
5.00
5.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00

2.00
3.20
5.20
5.20
5.20
2.05
4.80
3.00
4.00
3.70
8.70
7.60
1.20
4.10

2.30
0.50
0.90
2.30
0.90
2.30
1.70
1.30
2.30
2.30
0.50
2.30
2.20
2.30

2.00
1.00
1.00
1.00

11.55
2.00
2.10
4.70

1.50
1.50
1.05
0.10

0.50

0.50
0.50

0.50

70.20
11.70
5.40
2.88
2.34
23.22
4.68
2.67
0.84
2.52
10.36
8.70
32.40
11.20
21.28
11.34
4.68
8.71
8.88
5.33
4.36
167.93

0.50
0.50

4.60
1.60
2.34
59.80
11.70
4.72
8.16
23.40
9.20
8.51
4.35
17.48
2.64
9.43
43.75
34.65
3.00
2.21
0.47

Urinario base interior


Urinario (filete)
bebedero perimetro
bebedero base interior
bebedero (filete)
03.02.04 TARRAJEO DE COLUMNAS
columnas con long. De tarrajeo=1.30
columnas con long. De tarrajeo=0.90
columnas con long. De tarrajeo=0.75
columnas con long. De tarrajeo=0.65
columnas con long. De tarrajeo=0.40
columnas con long. De tarrajeo=1.00
columnas con long. De tarrajeo=0.50
columnas con long. De tarrajeo=0.80
columnas con long. De tarrajeo=0.55

M2

03.02.05 TARRAJEO DE SUPERFICIE DE VIGAS


Ejes verticales
Ejes adic. 1,5,6,10
Viga chata
Seccion 2-2

M2

03.02.06 TARRAJEO EN CIELORAZO


ejes 1,2,3,6,7,9,10
ejes 3,4,5
eje 7,8,9
cieloraso izquierdo lateral
Filete de losa
Filete de losa lateral izquierdo

M2

03.02.07 TARRAJEO DE TECHO CON IMPERMEABILIZANTE


Longitud=32.03 - (0.10*0.40)=31.60

M2

03.02.08 VESTIDURA DE DERRAMES DE PUERTAS Y VENTA


V1
V2
V3
V4
V5
V6
P1
P2
P2 en SSHH. (nios y nias)
P3

03.03 CONTRAPISO
03.03.01 CONTRAPISOS Y PISOS
03.03.01.01 CONTRAPISO DE 25mm
SS. HH. de Direccin
SS.HH. Nios y Nias
Ambiente para la Direccin
03.03.01.02 Contrapiso de 48 mm. Concreto para piso mach
Aula 1 y 2
03.04 PISOS Y PAVIMENTOS
03.04.01 PISOS
03.04.01.01 PISO DE CERAMICO 30X30 CM SERIE MADERA
SS. HH. de Direccin
SS.HH. Nios y Nias
Ambiente para la direccin

1.00
1.00
2.00
1.00
1.00

1.95
4.70
2.90
1.90
2.90

0.30
0.05
0.30
0.30
0.10

0.59
0.24
1.74
0.57
0.29

2.00
3.00
2.00
2.00
2.00
3.00
1.00
3.00
1.00

1.30
0.90
0.75
0.65
0.40
1.00
0.50
0.80
0.55

2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80

7.28
7.56
4.20
3.64
2.24
8.40
1.40
6.72
1.54

10.00
3.00
4.00
4.00

0.65
0.20
0.52
0.25

7.70
7.70
16.00
16.00

50.05
4.62
33.28
16.00

4.00
2.00
2.00
1.00
2.00
2.00

7.10
7.10
7.10
7.10
29.40
6.90

3.13
3.50
3.75
0.50
0.40
0.40

88.89
49.70
53.25
3.55
23.52
5.52

1.00

31.60

7.70

243.32

2.00
6.00
1.00
1.00
2.00
2.00
3.00
1.00
2.00
1.00

8.00
6.80
3.60
4.80
6.26
9.60
6.60
6.50
5.60
5.10

16.00
40.80
3.60
4.80
12.52
19.20
19.80
6.50
11.20
5.10

1.00
2.00
1.00

2.65
3.35
7.50

1.20
2.90
5.70

3.18
19.43
42.75

2.00

7.60

5.60

85.12

1.00
2.00
1.00

2.65
3.35
7.50

1.20
2.90
5.70

3.18
19.43
42.75

1.00

2.80

1.20

3.36

2.00

7.60

5.60

85.12

42.98

103.95

224.43

243.32

139.52

M2

65.36

M2

85.12

M2

03.04.01.02 Piso de cemento frotacho (color) e= 2.5cm


Depsito

M2

03.04.01.03 Piso de madera machiembrado


Aula 1 y 2

M2

65.36

3.36

85.12

03.04.02 VEREDAS
03.04.02.01 VEREDA DE E=4" fc=175 Kg/cm2
Vereda elevacion principal
Vereda pegado a los SS.HH. (nios y nias)
Vereda pegado a la Direccion (lateral)
Vereda hacia la calle
03.04.02.02 VEREDA - ENCOFRADO DESENCOFRADO
Vereda pegado a la direccion (lateral)
vereda frontal y posterior
03.05 CONTRAZOCALOS
03.05.01 CONTRAZOCALO DE MADERA
03.05.01.01 CONTRAZOCALO DE MADERA DE 4" RODON 1"
Aula 1, Aula 2
Direccion
03.06 ZOCALOS
03.06.01 ZOCALOS CERAMICOS DE 20X30CM SERIE BALTI
S.S.HH nios y nias
bebedero exterior h=1.50
bebedero exterior h=1.05
Urinario (perimetro)
Urinario base interior
Urinario (filete)
bebedero perimetro
bebedero base interior
bebedero (filete)
03.06.02 Zocalo de Cemento.simple m 1:4 C:A H= 0.50 m
Eje A
Eje 1
Eje B menos P1 y SSHH.
Eje 5
Muro horiz. Entre 3 y 4
03.07 CARPINTERIA METALICA
03.07.01 Ventana metalica perfiles de 1x1/8 fija marco
V1
V2
V3
V4
V5
V6
03.07.02 Rejilla de desague pluvial y marco plat. 1 1/4"

03.07.03 Puertas y Separadores metalicas c/marco Tubo


SS.HH.puertas
SS.HH.separadores
03.08 CARPINTERIA DE MADERA
03.08.01 Puertas Apaneladas marco cedro de 2"x4"
P1
P2
03.08.02 Puertas Contraplacadas c/triplay 4mm.
P3
03.09 CERRAJERA
03.09.01 Bisagra aluminizada Capuchina de 3"x3"
03.09.02 Bisagra simple de 3"
03.09.03 Cerradura para puerta forte de 03 Golpes
03.09.04 Cerradura para puerta forte de 02 Golpes
03.09.05 Cerradura para puerta tipo perilla
03.10 VIDRIOS, CRISTALES Y SIMILARES

M2

118.84
1.00
1.00
1.00
1.00

32.05
5.90
0.50
32.05

2.00
2.25
6.00
1.20

64.10
13.28
3.00
38.46

1.00
2.00

9.20
32.05

0.10
0.10

0.92
6.41

2.00
1.00

26.46
25.80

2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00

11.55
2.00
2.10
4.70
1.95
4.70
2.90
1.90
2.90

1.00
1.00
1.00
1.00
1.00

32.05
6.00
23.13
1.25
0.35

6.00
2.00
1.00
2.00
2.00
2.00

3.00
1.60
1.20
1.80
1.33
3.00

1.00

31.52

5.00
5.00

0.60
1.25

1.50
1.50

4.50
9.38

3.00
3.00

1.00
0.90

2.80
2.80

8.40
7.56

1.00

0.90

2.10

1.89

7.00
10.00
1.00
5.00
1.00

3.00
1.00
1.00
1.00
1.00

M2

7.33

ML

78.72
52.92
25.80

ML

43.75
1.50
1.50
1.05
0.10
0.30
0.05
0.30
0.30
0.10

34.65
3.00
2.21
0.47
0.59
0.24
1.74
0.57
0.29

ML

62.78
32.05
6.00
23.13
1.25
0.35

M2

42.23
1.00
1.80
0.60
0.60
1.80
1.80

18.00
5.76
0.72
2.16
4.79
10.80

ML

31.52
31.52

M2

13.88

M2

15.96

M2

UND
UND
UND
UND
UND

1.89

21.00
10.00
1.00
5.00
1.00

21.00
10.00
1.00
5.00
1.00

03.10.01 Vidrios semidobles incoloro crudo


Ventanas
03.11 PINTURA
03.11.01 Pintura latex en cielo raso 2 manos
Partida 03.02.06

PIE
42.23

10.76

454.39

M2

03.11.02 Pintura latex en muros interiores 2 manos


Partida 03.02.01

M2

03.11.03 Pintura latex en muros exteriores 2 manos


Partida 03.02.02

M2

03.11.04 Pintura en superficies de vigas 2 manos


Partida 03.02.05

M2

03.11.05 Pintura en superficies de columnas 2 manos


Partida 03.02.04

M2

03.11.06 Pintura en puertas c/barniz 2 manos


Partidas 03.08.01 Y 03.08.02

M2

03.11.07 Pintura en ventanas metalicas C/Antic. + Esma


Partidas 03.07.01

M2

03.11.08 Pintura en Puertas y Separadores Met. C/Antic.


Partidas 03.07.03

M2

03.12 APARATOS Y ACCESORIOS SANITARIOS


03.12.01 Inodoros
Inodoro Tanque Bajo losa blanca (c/accesorios)
Inodoro Tanque Bajo losa blanca (para nios)
03.12.02 Lavatorios
Lavatorios de pared blanco 1 llave (c/accesorios)
03.12.03 Urinarios
Urinario de Sitio
03.12.04 Lavaderos
Lavadero de 2.1x0.60 m, c/3 grifos (inc. Accesor)

454.39
1.00

224.43

224.43

253.68

253.68

167.93

167.93

103.95

103.95

42.98

42.98

2.00

17.85

35.70

2.00

42.23

84.46

2.00

13.88

27.76

1.00
5.00

1.00
5.00

1.00

1.00

1.00

1.00

1.00

1.00

PZA

6.00

PZA

1.00

PZA

1.00

PZA

1.00

04.00 INSTALACIONES SANITARIAS


04.01 SALIDAS DE DESAGUE
04.01.01 Salida PVC SAP desague 2"
04.01.02 Salida PVC SAP desague 4"
04.01.03 Salida PVC SAP ventilacion 2"

04.02 REDES DE DERIVACION


04.02.01 Tuberia PVC SAP 4"

04.02.02 Tuberia PVC SAP 2"

PTO

7.00
7.00

7.00

6.00

6.00

5.00

5.00

1.00

25.80

25.80

1.00

12.00

12.00

8.00

4.50

36.00

PTO

6.00

PTO

5.00

ML

25.80

ML

04.02.03 Tuberia PVC SAP 3"

12.00

ML
Desague pluvial

04.03 ACCESORIOS R/DERIV DE DESAGUE


04.03.01 Yee de PVC SAL SP simpel de 2"
04.03.02 Yee de PVC SAL SP, ramal de cond. 4-2"
04.03.03 Yee PVC SAL 4"
04.03.04 Codos PVC SAL de 4"x90
04.03.05 Codos PVC SAL de 3"x90
04.03.06 Codos PVC SAL de 2"x90
04.03.07 Registro de bronce de 4" prov. de coloc.
04.03.08 Registro de bronce de 3" prov. de coloc D. Pluv
04.03.09 Registro de bronce de 2" prov. de coloc.

PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA

36.00

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00

4.00
3.00
3.00
4.00
24.00
7.00
3.00
8.00
5.00

04.03.10 Caja de Registro de 12" x 24" c/tapa c


04.03.11 Tee PVC SAL 4"x4"
04.03.12 Tee PVC SAL 4"x2"
04.03.13 Trampa "P" de PVC para desague de 2"
04.03.14 Sumidero de bronce 2", prov. de coloc.
04.03.15 Excavacion para Instalac. Sanit. Hasta 1.00 m T

PZA
PZA
PZA
PZA
PZA
PZA

04.04 SISTEMAS DE AGUA FRIA


04.04.01 Salida de Agua Fria con tub. PVC-SAP 1/2"

PTO

04.04.02 Tuberia PVC SAP 1/2"


04.04.03 Tuberia PVC SAP 3/4"
04.04.04 Vlvula de compuerta de bronce de union roscd
04.04.05 Codo PVC SAP 1 1/2"
04.04.06 Tee PVC SAP 1 1/2"
04.04.07 Grifo Cromado 1/2

3.00
1.00
2.00
5.00
5.00
1.00

37.80

0.40

0.40

3.00
1.00
2.00
5.00
5.00
6.05

11.00

11.00

1.00

18.00

18.00

1.00

18.00

18.00

4.00
6.00
4.00
4.00

_
_
_
_

_
_
_
_

_
_
_
_

4.00
6.00
4.00
4.00

23.00

23.00

15.00

15.00

10.00

10.00

11.00

11.00

12.00

12.00

15.00

15.00

10.00

10.00

1.00

210.00

210.00

1.00

35.00

35.00

1.00

20.00

20.00

1.00

200.00

200.00

1.00

200.00

200.00

1.00

10.00

10.00

1.00
1.00
1.00

_
_
_

11.00

ML

18.00

ML

18.00

UND
UND
UND
UND

3.00
1.00
2.00
5.00
5.00
6.05

4.00
6.00
4.00
4.00

05.00 INSTALACIONES ELECTRICAS


05.01 SALIDA PARA ELECTRICIDAD
05.01.01 Salida para centro de luz

05.01.02 Salida para interruptores bipolares simples

05.01.03 Salida para interruptor

PTO

23.00

PTO

15.00

PTO

10.00

05.02 INSTALACION DE ARTEFACTOS ELECTRICOS


05.02.01 Foco Incandescente
UND

05.02.02 Artefacto fluorecente 1x40w TPR-240

05.02.03 Tomacorriente simple bipolar

05.02.04 Interruptor simple

05.03 CANALIZACIONES Y/O TUBERIAS


05.03.01 Tuberia PVC SAP (elect.) 3/4"

05.03.02 Tuberias PVC SEL (Electricas) D=3/4"

05.04 CONDUCTORES Y/O CABLES


05.04.01 Cable electrico TW AWG N 10
05.04.02 Cable electrico TW AWG N 12
05.04.03 Cable electrico TW AWG N 14
05.04.04 Alambre desn. 1x16mm2 Cu 15mm PVC SAP

05.05 TABLEROS Y CUCHILLAS


05.05.01 Tablero General Caja Metlica
05.05.02 Tableros distribucion caja metalica T-D1
05.05.03 Tableros distribucion caja metalica T-D2
05.06 POZO A TIERRA

11.00

UND

37.00

UND

15.00

UND

255.00

ML

210.00

ML

35.00

ML

20.00

ML

200.00

ML

200.00

ML

PZA
PZA
PZA

10.00

_
_
_

_
_
_

1.00
1.00
1.00

1.00
1.00
1.00

05.06.01 Pozo conexin a tierra

UND

1.00

1.00

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.80
0.80
0.80
0.80
0.80

_
_
_
_
_

27.36
27.69
21.28
18.14
5.53

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.80
0.80
0.80
0.80
0.80

_
_
_
_
_

27.36
27.69
21.28
18.14
5.53

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.50
0.50
0.50
0.40
0.40

0.50
0.50
0.50
0.50
0.50

8.55
8.65
6.65
4.53
1.38

1.00
1.00
1.00
1.00
1.00

34.20
34.61
26.60
22.67
6.91

0.35
0.25
0.25
0.25
0.35

0.20
0.20
0.20
0.20
0.20

2.39
1.73
1.33
1.13
0.48

1.00

CERCO PERIMETRICO
06.00 CERCO PERIMETRICO
06.01 TRABAJOS PRELIMINARES
06.01.01 Limpieza de terreno manual
Lado
Lado
Lado
Lado
Lado

M2
Norte
Sur
Este
Oeste 1
Oeste 2

06.01.02 Trazo niveles y replanteo

99.99

M2
Lado
Lado
Lado
Lado
Lado

Norte
Sur
Este
Oeste 1
Oeste 2

06.02 MOVIMIENTO DE TIERRAS


06.02.01 Excavacin de zanjas para Cimiento
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)
06.02.02 Relleno con material propio
Lado
Lado
Lado
Lado
Lado

99.99

M3

29.77

M3
Norte (Caravista)
Sur (Caravista)
Este (Caravista)
Oeste 1 (Reja)
Oeste 2 (Reja)

7.07

06.02.03 Eliminacin de material excedente


M3
f(e)
Con 25% de esponjamiento.
1.25
Excavacin de zanjas para Cimiento
Relleno con material propio
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 Cimientos
M3
06.03.01.01 Cimientos corridos mezcla 1:10 Cemento-Hormigon+ 30% P.G.
Lado Norte (Caravista)
10.00
Lado Sur (Caravista)
11.00
Lado Este (Caravista)
8.00
Lado Oeste 1 (Reja)
6.00
Lado Oeste 2 (Reja)
2.00
06.03.02. Sobrecimientos
06.03.02.01 Concreto 1:8 + 25% P.M Sobrecimiento
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)

M3

06.03.02.02 Encofrado y desencofrado de sobrecimientos h=


Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)

M2

06.04 OBRAS DE CONCRETO ARMADO


06.04.01 Columnas
06.04.01.01 Concreto en Columnas F'C = 210 kg/cm2
C-4
C-5
06.04.01.02 Acero en Columnas f'y=4200 kg/cm2.

28.37
22.70

28.37

29.77
7.07
27.67
3.00
3.25
3.00
3.37
2.96

0.50
0.50
0.50
0.40
0.40

0.50
0.50
0.50
0.50
0.50

7.50
8.94
6.00
4.04
1.18
6.95

10.00
11.00
8.00
6.00
2.00

3.00
3.25
3.00
3.37
2.96

20.00
22.00
16.00
12.00
4.00

3.00
3.25
3.00
3.37
2.96

37.00
11.00
Cant.

0.25
0.40
N veces

0.15
0.15
0.15
0.15
0.15

0.40
0.40
0.40
0.40
0.40

1.80
2.15
1.44
1.21
0.36

0.40
0.40
0.40
0.40
0.40

24.00
28.60
19.20
16.18
4.74

2.40
2.40
Kg/m

5.55
1.58
Sub Total

92.71

M3

KG

7.13
0.25
0.15
Long.

1249.06

C-4
Fe. 1/2"
Fe. 3/8" Estribus

37.00
37.00

4.00
20.00

3.60
1.00

1.02
0.58

543.46
429.20

Fe. 1/2"
Fe. 3/8" Estribus
06.04.01.03 Encofrado y desencofrado en Columnas
C-4
C-5
06.04.02 Vigas
06.04.02.01 Concreto en Vigas F'C = 210 kg/cm2
Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)

11.00
11.00

4.00
20.00

3.60
0.90

1.02
0.58

161.57
114.84

37.00
11.00

1.00
1.10

2.40
2.40

88.80
29.04

20.00
22.00
16.00

3.00
3.25
3.00

0.25
0.25
0.25

0.20
0.20
0.20

3.00
3.58
2.40

Cant.

N veces

Long.

Kg/m

Sub Total

9.00
9.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
3.60
0.90

1.02
0.58
1.02
0.58

110.16
112.75
14.69
12.53

10.00
10.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
2.75
0.90

1.02
0.58
1.02
0.58

122.40
125.28
11.22
12.53

7.00
7.00
1.00
1.00

4.00
24.00
4.00
24.00

3.00
0.90
2.80
0.90

1.02
0.58
1.02
0.58

85.68
87.70
11.42
12.53

10.00
11.00
8.00

3.00
3.25
3.00

2.00
2.00
2.00

0.20
0.20
0.20

12.00
14.30
9.60

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

_
_
_
_
_
_

2.00
2.00
2.00
2.00
2.00
2.00

54.00
7.32
60.00
5.50
42.00
5.60

37.00
11.00

0.50
0.80

2.40
2.40

44.40
21.12

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

18.00
2.00
20.00
2.00
14.00
2.00

3.00
3.66
3.00
2.75
3.00
2.80

1.00

3.00

C-5

M2

M3

06.04.02.02 Acero en Vigas f'y=4200 kg/cm2.


Lado Norte (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Lado Sur (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Lado Este (Caravista)
Fe. 1/2" (+/-)
Fe. 3/8" Estribus
Fe. 1/2" (+/-)
Fe. 3/8" Estribus

KG

06.04.02.03 Encofrado y desencofrado en Vigas


Lado Norte (Caravista)
Lado Sur (Caravista)
Lado Este (Caravista)

M2

06.05 MUROS Y TABIQUES DE ALBAILERIA


06.05.01 Muro de soga Caravista C.A. 1:5
Lado Norte (Caravista)

Lado Este (Caravista)

Lado Este (Caravista)

06.07.02 Reja de metalica tubo negro de 2"

65.52

91.57
1.05
1.05
1.05
1.05
1.05
1.05

28.35
3.84
31.50
2.89
22.05
2.94

M2

Lado Sur (Caravista)

06.07 CARPINTERIA METALICA


06.07.01 Puerta contraplacada metalica tubo de 1 y pla

174.42

M2

Lado Este (Caravista)

69.77
0.40
0.40
0.40
0.40
0.40
0.40

21.60
2.93
24.00
2.20
16.80
2.24

2.40

7.20

M2
M2

718.88

35.90

M2

Lado Sur (Caravista)

06.06.03 Tarrajeo en sobrecimientos Cemento Arena 1:5


Lado Norte (Caravista)

8.98

M2

Lado Sur (Caravista)

06.06 REVOQUES, ENLUCIDOS Y MOLDURAS


06.06.01 Tarrajeo de superficie de columnas Cemento Are
C-4
C-5
06.06.02 Tarrajeo de superficie de vigas Cemento Arena 1
Lado Norte (Caravista)

117.84

7.20
_

53.98

Cerco perimetrico
Lado Oeste 1 (Reja)
Lado Oeste 2 (Reja)

6.00
1.00
2.00
1.00

3.00
2.22
2.92
0.93

1.00

1.00

37.00
11.00

0.50
0.80

9.00
1.00
10.00
1.00
7.00
1.00

3.00
3.66
3.00
2.75
3.00
2.80

18.00
2.00
20.00
2.00
14.00
2.00

3.00
3.66
3.00
2.75
3.00
2.80

2.00
2.00
2.00
2.00

36.00
4.44
11.68
1.86

1.00

2.40
2.40

44.40
21.12

06.08 CERRAJERA
06.08.01 Cerradura puerta de sobre poner de 2 golpes, llav PZA
06.09 PINTURA
06.09.01 Pintura en columnas c/latex 2 manos
C-4
C-5
06.09.02 Pintura en vigas c/latex 2 manos
Lado Norte (Caravista)

M2

Lado Este (Caravista)

91.57
1.05
1.05
1.05
1.05
1.05
1.05

28.35
3.84
31.50
2.89
22.05
2.94

M2

Lado Sur (Caravista)


Lado Este (Caravista)

06.09.04 Pintura en Carpinteria metalica


Puerta contraplacada metalica tubo de 1
P-7
Reja de tubo negro de 2"
Lado Oeste 1 (Reja)

65.52

M2

Lado Sur (Caravista)

06.09.03 Pintura en sobrecimientos c/latex 2 manos


Lado Norte (Caravista)

1.00
_

69.77
0.40
0.40
0.40
0.40
0.40
0.40

21.60
2.93
24.00
2.20
16.80
2.24

M2

Lado Oeste 2 (Reja)

61.18
1.00

3.00

6.00
1.00
2.00
1.00

3.00
2.22
2.92
0.93

2.40

7.20

2.00
2.00
2.00
2.00

36.00
4.44
11.68
1.86

OBRAS EXTERIORES
07.00 OBRAS EXTERIORES
07.01.01 Limpieza de terreno manual
M2
Patio de Formacion, acceso y cir 1.00
07.01.02 Trazo niveles y replanteo

576.24

576.24

Area=

576.24

576.24

1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60
0.60
0.60
0.60

4.95
0.25
2.21
1.03
0.79
0.96
1.22

1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.52
0.03
0.23
0.11
0.08
0.10
0.13

M2
Patio de Formacion, acceso y cir 1.00

07.02 MOVIMIENTO DE TIERRAS


07.02.01 Excavacin de zanjas para Sardineles
En acceso

11.42

M3

En circulacion exterior

07.02.03 Eliminacin de material excedente


Con 25% de esponjamiento.
Excavacin de zanjas para Cimiento

576.24

M3

En circulacion exterior

07.02.02 Relleno con material propio


En acceso

576.24
Area=

M3

1.19

f(e)
1.25

12.78
10.23
11.42

12.78

Relleno con material propio


07.03 OBRAS DE CONCRETO SIMPLE
07.03.01 Concreto simple fc=175 kg/cm2
07.03.01.01 Concreto simple en sardineles
En acceso

1.19
M3

En circulacion exterior

07.03.01.02 Encofrado y desencofrado de Sardineles


En acceso

1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

Area=
Area=
Area=
Area=
Area=
Area=
Area=

0.22
0.22
0.22
0.22
0.22
0.22
0.22

4.54
0.23
2.03
0.95
0.72
0.88
1.12

2.00
2.00
2.00
2.00
2.00
2.00
2.00

20.63
1.03
9.21
4.31
3.29
4.02
5.08

0.10
0.10
0.10
0.10
0.10
0.10
0.10

4.13
0.21
1.84
0.86
0.66
0.80
1.02

15.00

4.00

0.15

27.00

6.00
4.00

10.00
20.00

0.15
0.15

9.00
12.00

1.00
1.00

Area=
Area=

86.22
30.06

_
_

86.22
30.06

1.00

20.00

10.00

1.00
1.00

Area=
Area=

86.22
30.06

1.00

20.00

10.00

2.00
4.00

20.00
10.00

1.00

1.00

1.00
1.00

_
_

_
_

_
_

1.00
1.00

M2

En circulacion exterior

07.03.01.03 Concreto simple en losa

10.47

9.51

M3
En patio de formacion

07.03.01.04 Encofrado y desencofrado de losa


En patio de formacion

27.00
3.00

M2

21.00

07.04 PISOS Y PAVIMENTOS


07.04.01 Nivelacion y Apisonado para Piso
En acceso
En circulacion exterior

M2

En patio de formacion
07.04.02 Piso de adoquin de concreto
En acceso
En circulacion exterior

M2

07.04.03 Piso de Cemento pulido, coloreado y bruado


En patio de formacion
07.04.04 JUNTAS DE DILATACION C/ASFALTO
En patio de formacion

M2

07.05 JARDINERIA
07.05.01 Sembrado de grass y plantas
Jardin

316.28

200.00
116.28
_
_

86.22
30.06

200.00
200.00

ML

80.00
40.00
40.00

GLB

1.00

VARIOS

08.00 VARIOS

08.01 Limpieza final de obra


08.02 Placa recordatoria

UND
UND

1.00
1.00

6.9

6.9

1.15