Smart power engineering co.

220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

Earth system
1 Earth network test
2 Equipment earth test
Power transformers 220l66kv ( Trafo-1 )
1 Megger,tan delta ,turnes ratio,off load test, fans test,
oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
Power transformers 220l66kv ( Trafo-2 )
1 Megger,tan delta ,turnes ratio,off load test, fans test,
oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
Power transformers 220l66kv ( Trafo-3 )
1 Megger,tan delta ,turnes ratio,off load test, fans test,
oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
220kv switchgear test ( OHL Bay-1)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
2 CT's, VT's
Interlook system.
220kv switchgear test ( OHL Bay-2)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

2 CT's, VT's
Interlook system.
220kv switchgear test ( OHL Bay-3)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

2 CT's, VT's
Interlook system.
220kv switchgear test ( OHL Bay-4)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

2 CT's, VT's
Interlook system.
220kv switchgear test ( Tans. Bay-1)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

2 CT's, VT's
Interlook system.
220kv switchgear test (Trans. Bay-2)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

10

2 CT's, VT's
Interlook system.
220kv switchgear test (Trans. Bay-3)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

11

2 CT's, VT's
Interlook system.

Address: 16 Building Project, Autostrad Road, Takseem El Laselky,


New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 1 of 6

Smart power engineering co.


220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

220kv switchgear test (B.C & B.B )


1 CB, Disconnectors, earthing discon., busbars, LCCetc.
12

2 CT's, VT's
Interlook system.
220kv Protection & Control PNL ( OHTL Bay-1)
1 Protection relays test

13

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( OHTL Bay-2)
1 Protection relays test

14

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( OHTL Bay-3)
1 Protection relays test

15

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( OHTL Bay-4)
1 Protection relays test

16

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( Trafo. Bay-1)
1 Protection relays test

17

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( Trafo. Bay-2)
1 Protection relays test

18

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( Trafo. Bay-3)
1 Protection relays test

19

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( B.B-1)
1 Protection relays test

20

2 intertrip and interlock test


3 Control and alarm panels test.
220kv Protection & Control PNL ( B.B-2)
1 Protection relays test

21

2 intertrip and interlock test


3 Control and alarm panels test.

Address: 16 Building Project, Autostrad Road, Takseem El Laselky,


New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 2 of 6

Smart power engineering co.


220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

Power transformers 66l11kv ( Trafo-1 )


22

23

24

25

1 Megger,tan delta ,turnes ratio,off load test, fans test,


oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
4 Neutral resistance test.
Power transformers 66l11kv ( Trafo-2 )
1 Megger,tan delta ,turnes ratio,off load test, fans test,
oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
4 Neutral resistance test.
Power transformers 66l11kv ( Trafo-3 )
1 Megger,tan delta ,turnes ratio,off load test, fans test,
oil&winding temp. guags, winding resistance..etc.
2 Mechanical protection relays test.
3 Tap changer test.
4 Neutral resistance test.
66kv switchgear test ( Incomer Bay-1)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
2 CT's, VT's
Interlook system.
66kv switchgear test ( Incomer Bay-2)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

26 2 CT's, VT's
Interlook system.
66kv switchgear test ( Incomer Bay-3)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
27 2 CT's, VT's
Interlook system.
66kv switchgear test ( Trafo. Outgoing Bay-1)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
28 2 CT's, VT's
Interlook system.
66kv switchgear test ( Trafo. Outgoing Bay-2)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
29 2 CT's, VT's
Interlook system.
66kv switchgear test ( Trafo. Outgoing Bay-3)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
30 2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-1)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
31 2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-2)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
32 2 CT's, VT's
Interlook system.
Address: 16 Building Project, Autostrad Road, Takseem El Laselky,
New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 3 of 6

Smart power engineering co.


220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

66kv switchgear test ( OHTL Outgoing Bay-3)


1 CB, Disconnectors, earthing discon., busbars, LCCetc.
33 2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-4)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
34 2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-5)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
35

2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-6)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

36 2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-7)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.
37

2 CT's, VT's
Interlook system.
66kv switchgear test ( OHTL Outgoing Bay-8)
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

38

2 CT's, VT's
Interlook system.
66kv switchgear test ( B.C & B.B )
1 CB, Disconnectors, earthing discon., busbars, LCCetc.

39 2 CT's, VT's
Interlook system.
66kv Protection & Control PNL ( Incomer Bay-1)
1 Protection relays test
40 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( Incomer Bay-2)
1 Protection relays test
41 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( Incomer Bay-3)
1 Protection relays test
42 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( Trafo. Outgoing Bay-1)
1 Protection relays test
43 2 intertrip and interlock test
3 Control and alarm panels test.
Address: 16 Building Project, Autostrad Road, Takseem El Laselky,
New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 4 of 6

Smart power engineering co.


220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

66kv Protection & Control PNL ( Trafo. Outgoing Bay-2)


1 Protection relays test
44 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( Trafo. Outgoing Bay-3)
1 Protection relays test
45 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-1)
1 Protection relays test
46 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-2)
47

1 Protection relays test


2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-3)
1 Protection relays test

48

2 intertrip and interlock test


3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-4)

49

1 Protection relays test


2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-5)
1 Protection relays test

50

2 intertrip and interlock test


3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-6)
1 Protection relays test

51 2 intertrip and interlock test


3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-7)
1 Protection relays test
52 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( OHTL Outgoing Bay-8)
1 Protection relays test
53 2 intertrip and interlock test
3 Control and alarm panels test.
66kv Protection & Control PNL ( B.B-1 )
1 Protection relays test
54 2 intertrip and interlock test
3 Control and alarm panels test.
Address: 16 Building Project, Autostrad Road, Takseem El Laselky,
New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 5 of 6

Smart power engineering co.


220/66/11 KV Substation

SR. No.

TESTING / COMMISSIONING OVERALL TIME SCHEDULE

Work Description for


substation

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

WEEK

1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

66kv Protection & Control PNL ( B.B-2 )


1 Protection relays test
55 2 intertrip and interlock test
3 Control and alarm panels test.
56

11 Auxilary transformers test.


11 kv switchgears ( 3 sections )
1 Busbar, earth disconnectors test
2 CB tests

57

3 Protection relays test


4 CT's, VT's test
5 Control and all meters test.

58

Scada system test.

59

Medium voltage cables test.


Utilities system :1 AC distribution board and sub boards.
2 DC distribution board and sub boards.
3 Batteries and battery charger test.

60 4 Communication system test.


5 Fire and smoke alarm panel test.
6 Lighting, power sockets and Emergency lighting test.
7 Air condition / ventilation sytem test.
8 Lightning system check.
61

Final stting for all relays.

62

Energizing of substation

Address: 16 Building Project, Autostrad Road, Takseem El Laselky,


New Maadi, Cairo, Egypt
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com

, , 16 :
,
Tel/Fax : +2-02-25192727
E-mail: smartpower@smartpower-eg.com
Page 6 of 6