General specification for hospital -500 bed

1. Structure :
a)RCC frame, load bearing structure as per site site conditions & safe bearing
capacity of soil.
b)External brick walls to be 250mm thick & internal brick walls to be 125 mm
thick.
2. Doors & Windows :
a) All entrance doors Glazed aluminium shutters.
b) All frames of doors and windows Standard aluminium sections.
c) Doors of prelaminated particle board of exterior quality with aluminium edging
around.
d) Aluminium grills & wire mesh shutters in all windows or wherever required.
e) All fittings of anodized aluminium.
f) All windows &doors in X-ray room to have lead lining.
g) O.T doors - Laminated doors / SS clad with crash guards
h) Window cills & jamb to be of Kotah stone.

3. Flooring :
a)Entrance hall/Foyer, Administration, Staff rooms, waiting areas Vitrified tiles.
Corridors 25 mm thick machine cut Kotah stone. Toilets to be provided with
300 x 300 anti skid ceramic floor tiles.
b)O.T., Scrub to have granite slab flooring.
c)All other rooms Kotah flooring.

4. Skirting : To match with the flooring.

5. Painting : a) Internal: All rooms to have plastic emulsion paint on smooth base
except toilets & stores where white wash is to be provided. PU/antibacterial paint
in O.T.
b)External : Cement based paint.

6. Dado : All toilets, Bath, Pantry & Kitchen to have 200 x 300 coloured/glazed/
ceramic tiles dado upto 2100 height.

7. Staircases : Kotah stone on all floors.

8. Skirting : Skirting to match with flooring material.

9. False Ceiling : CSSD,O.T. to have metal ceiling. Grid ceiling for corridors & ICU.
On 3rd,4th & 5th floor in Superspeciality Block. Grid ceiling to be provided in
ground floor & 4th floor in Oncology block.

10. O.T. Specifications :

1
Pendants
One at foot & one at head / Two at head end one for anaesthetist, the other for
surgeon Which of the options?
2
Peripheral lights
Wipro vision series-254 x 595 - can be big also
3
Ceiling
Metal false ceiling AT 3M height
4

Filter
Terminal Hepa with velocity of not less than 90 ft/m at table level
5
Sealing around the view panel
Polypropylene beading extended aluminum section
6
Doors
Laminated doors / SS clad with crash guards
7
Walls
Granite slab
8
Boxing of riser
Metal
9
Insulating walls above the false ceiling Height
Gypsum board
10
False ceiling in corridor
Grid false ceiling

11. Wood Work : All cupboards, shelves ,counters to be in prelaminated particle


board.

12. Landscaping: Provision for Horticulture, and architectural features.

13. Railing : Railing to be of ss brush finish for staircase.

14. Electrical:

a) Street lighting & general lighting.


b) Conduit wiring system is to be provided.

15. Air Conditioning : O.T. zone to have central air conditioning system.

16. Miscellaneous:

a) Counters : Granite counters in pantry, kitchen, labs.


b) All sinks to be of stainless steel.
c) All plumbing pipes to be concealed in walls.
d) In scrub special scrub sink to be provided.

CONCEPT

Keeping in mind the clients brief it is envisaged to have a Super Speciality Block
having lower and upper ground, five upper floors and a separate Oncology Block
having ground and four upper floors. Both the buildings have H shaped plans
comprising of two T shaped wards. These wards are an improvement over the
existing ward design with a standardized 6.6 x 6.6 m. grid.
As the proposed site is a good 2.0 m. below the existing ward block it is
proposed to lower the entire site level by 1.2 m. which gives us an additional
lower ground floor as well as converts the basement in the existing ward block to

more user friendly lower ground floor. This can accommodate dormitories for
patients relatives along with other uses the layout is planned in such a way that
there is ample scope for expansion in the future for both the Super Speciality as
well as the Oncology Block.
The Super Speciality Block is desiged with special attention to circulation &
patient safety and comfort. There are separate entrances for OPD,IPD and
services.There is adequate vertical communication in the form of bed lifts ,
passenger lifts and service lift along with three fire escape stairs and a ramp.The
building is well connected with the existing hospital at first to fourth floor levels
to allow easy access to staff, faculty and transfer of patients to and from the new
block.The block houses OPDs on the lower and upper ground floor, inpatient ward
block on first and second floors and operation theatre block with the
accompanying ICUs, HDUs and CSSD on the third, fourth and fifth floors.