Beruflich Dokumente
Kultur Dokumente
Author: SWPB
Date: 10/10/01
Rev: 10/11/02
WORKING
READER
DATE
DRAFT
CONTEXT:
TOP
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Actual Year
Flow Diagram
Develop Flow
Diagram
0
Data
A0
Computer Technology
Supply and Balance
Work Team
and Scott Hayes
Node:
Purpose:
Viewpoint:
DWR
Title:
A-0
Number:
Flow Diagram
Page: 1
Author: SWPB
Date: 10/10/01
Rev: 10/11/02
WORKING
READER
CONTEXT:
DATE
DRAFT
RECOMMENDED
A-0
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Determine
Precipitation &
Runoff
1
A1
Actual Year
Surface Water
Determine
Surface Water
2
A2
Actual Year
Reclaimed Water
Determine
Recycled
Water
3
A3
Groundwater
Experts
A5
Compile Flow
Diagram
6
A6
Computer Technology
Title:
A0
Actual Year
Flow Diagram
Number:
Develop Flow Diagram
Page: 2
Author: SWPB
Date: 10/10/01
Rev: 3/5/02
DATE
CONTEXT:
DRAFT
RECOMMENDED
A0
Water Portfolio
Items 6 and 53
Actual Year
Precipitation
Precipitation data
Acquire
Precipitation
Data
1
Data
READER
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio
Item 5
WORKING
Water Portfolio
Item 7
A11
Actual Year
Runoff Data
Estimate
Runoff
Streamgage Data
GIS (Arcview)
Actual Year
Groundwater
Natural Recharge
A12
PRISM Spatial Climate Layers
Estimate Total
Groundwater
Natural
Recharge 3
Groundwater Experts
Compile
Precipitation
and Runoff
Data
4
Actual Year Precipitation
and Runoff Data
Title:
A1
Number:
Determine Precipitation & Runoff
Page: 3
Author: SWPB
Date: 3/5/02
Rev: 3/5/02
Acquire
historical
average and
actual year
individual
Precipitation
station
data
precipitation
data
2
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A1
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Item 5
Acquire
historical
Historical Precipitation
average
Prism polygon layer
precipitation
PRISM
polygons from
Oregon State
University 1
WORKING
Compute
actual year %
of average
based on indiv.
sta. data 3
GIS historical
precipitation polygon
layer
Actual yr.
% of avg.
polygons
Develop actual
year % of
average
polygons 4
Actual year % of
average precipitation
polygon GIS layer
Multiply
historical
average
precipitation
polygon layer
by actual year
% of average
polygon layer5
Actual Year
Precipitation
GIS (Arcview)
Node:
Title:
A11
Number:
Acquire Precipitation Data
Page: 4
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
Estimate
Natural Runoff
1
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A1
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio Items 6 and 53
Water Portfolio
Item 53
WP Item 6a
Streamgage Data
WORKING
Actual Year
Natural Runoff
Data
Water Portfolio
Item 6b
Actual Year
Remaining Natural
Runoff Flow to Salt Sink
Estimate
Remaining
Runoff Flow to
Salt Sinks 2
Actual Year
Incidental Runoff Data
Estimate
Incidental
Runoff
Compile Runoff
Data
4
Actual Year
Runoff Data
Title:
A12
Number:
Estimate Runoff
Page: 5
When stream gage data is unavailable for a given basin, neighboring stations from adjacent basins are used to estimate flow.
For example, at Carcinus Straits or at the Golden Gate Bridge there no specific streamgage to read from.
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
READER
CONTEXT:
DATE
DRAFT
RECOMMENDED
A0
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio
Actual Year
Items 26 & 30
Surface Water
Acquire State &
Federal
Water Portfolio
Data
Surface Water
Items 14
Project
Information 1
Calculate
Surface Water
A21
In Storage and
Beginning/End of Year Storage Data
Distribute 2
Out of State
Inflows and
Outflows
Actual Year
Water Transfer Info
Acquire Water
Transfer
Information and
Distribute 3
Water Portfolio
Water and
Wastewater Agencies
Estimate
Inflows and
Outflows
5
A25
Compile
Known Surface
Water
Information 6
Spreadsheets
Title:
A2
Actual Year
Inflows and Outflows
Acquire Local
Deliveries
Information
4
A24
Node:
Number:
Determine Surface Water
Page: 7
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A2
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio
Item 13
SWP Deliveries
Data
Water Portfolio
Item 11
A211
Acquire CVP
(Base &
Project)
CVP Delivery Data
Delivery Data
2
A212
Colorado River Deliveries
Water Portfolio
Item 1
Actual Year
Colorado River
Delivery Data
Acquire
Colorado River
Delivery Data
3
A213
USBR
Other Federal Deliveries
Water Portfolio
Item 12
Colorado River
Board
Acquire Other
Federal
Deliveries Data
4
Actual Year
Other Federal
Deliveries Data
A214
COE
Water and
Wastewater Agencies
Title:
A21
Number:
Acquire State & Federal Surface Water Project Information
Page: 8
Author: SWPB
Date: 10/15/2001
Rev: 11/1/01
WORKING
Acquire SWP
Deliveries by
Agency
1
DATE
CONTEXT:
DRAFT
RECOMMENDED
A21
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Item 13
Bulletin 132
Table B5A or B5B
READER
SWP Deliveries
SWP Sim
Water and Wastewater
Agencies
SWP Deliveries
Distribute
Deliveries by
HR/PSA/DAU
2
SWP
Deliveries
MWDSC
SWP
Deliveries
Obtain MWD
Deliveries
3
Deliveries Match
Compare
Deliveries
MWDSC Staff
Deliveries Do Not Match
Title:
A211
Number:
Acquire SWP Delivery Data
Page: 9
Author: SWPB
Date: 12/7/01
Rev: 12/7/01
Notes: 1 2 3 4 5 6 7 8 9 10
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A21
PUBLICATION
Water Portfolio
Item 11
CVP Deliveries
Acquire CVP
Deliveries Data
1
Seperate into
Base and
Project
Deliveries 2
Local Agencies
USBR
Deliveries by HR/PSA/DAU
Distribute by
HR/PSA/DAU
3
Insert into
Water Budget
4
Node:
Title:
A212
Number:
Acquire CVP (Base & Project) Delivery Data
Page: 11
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A21
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio Item 1
Colorado River
Deliveries
WORKING
Colorado River
Board
Colorado River
Deliveries by DAU
Acquire
MWDSC
Delivery
Information 3
Deliveries Match
Compare
Deliveries
4
Local Agencies
Actual Year
Colorado River
Delivery Data
Title:
A213
Number:
Acquire Colorado River Delivery Data
Page: 12
Acquire Colorado River Deliveries from Water Agency Water Agencies/Col.River contractors being:
Coachella Valley Water District
Imperial Irrigation District
Metropolitan Water District
Palo Verde Irrigation District
Palo Verde Irrigation District(mesa lands)
Yuma Project, California portion
(per B160-87, pg. 28)
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
WORKING
READER
DATE
DRAFT
RECOMMENDED
A21
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
CONTEXT:
Water Portfolio
Item 12
Other Federal
Deliveries
Acquire Other
Federal
Deliveries by
Reservoir 1
Distribute by
HR/PSA/DAU
2
Insert
Information into
Water Budget
3
Actual Year
Other Federal
Deliveries Data
Local Agencies
Title:
A214
Number:
Acquire Other Federal Deliveries Data
Page: 14
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
DATE
CONTEXT:
DRAFT
RECOMMENDED
A2
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
WP, Item 10,
Local Imported
Deliveries
READER
WP Item 9, Local
Deliveries
Acquire Local
Imported
Deliveries Data
and Distribute
by
HR/PSA/DAU1
Acquire Local
Delivery Data
2
Land Use Method
Actual Year Local
Deliveries Info
Compile Local
Deliveries Info
3
Local Agencies
Title:
A24
Number:
Acquire Local Deliveries Information
Page: 15
Out of State
Inflows and
Outflows
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
Irrigation Districts
-Klamath
- Tule Lake
A2
Actual Year
Inflow from Oregon
Water Portfolio Item 54c
Estimate
Outflow to
Nevada
USBR
-Klamath
Project Office
Actual Year
Outflow to Nevada
Actual Year
Outflow to Oregon
3
Estimate
Outflow to
Oregon
Gage data on E.F.Carson R., Walker R., Truckee R., Long Valley R.
4
Calculate
Outflow to
Mexico
5
Compile Inflow
and Outflow
Data
6
Actual Year
Inflows and
Outflows
Spreadsheets
Title:
A25
CONTEXT:
RECOMMENDED
PUBLICATION
Water Portfolio
Item 4b
Estimate Inflow
from Mexico
2
DATE
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio
Water Portfolio
Item 54a
Item 4a
Estimate Inflow
from Oregon
1
READER
Number:
Estimate Inflows and Outflows
Page: 16
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
A0
Water Portfolio
Water Portfolio
Item 19
Water Portfolio
Item 3
A31
Compile
Recycled
Water Data
Local Delivery Data
A24
CONTEXT:
RECOMMENDED
PUBLICATION
Water Portfolio
Item 2
Quantify Ocean
Desalination
1
DATE
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Data
READER
Actual Year
Recycled Water
Actual Year
Water from
Refineries
2
A32
Estimate Water
from Refineries
3
A33
Actual Year
Recycled Water
from Agriculture
Estimate
Recycled
Water from Ag
Operations 4
A34
Compile
Reclaimed
Water
Information 5
Actual Year
Reclaimed Water
Title:
A3
Number:
Determine Recycled Water
Page: 17
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A3
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Item 2
Desalting Information
Data
Acquire
Desalting
Information by
Plant 1
Distribute by
HR/PSA/DAU
2
Quantify Ocean
Desal
3
Node:
Title:
A31
Number:
Quantify Ocean Desalination
Page: 18
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
WORKING
READER
DRAFT
RECOMMENDED
A3
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
CONTEXT:
DATE
Water Portfolio
Item 19
Data
Acquire
Recycled
Water Data
1
Actual Year
Recycled Water
Node:
Title:
A32
Number:
Compile Recycled Water Data
Page: 19
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
WORKING
Data
DATE
CONTEXT:
DRAFT
RECOMMENDED
A3
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Item 3
READER
Compile Water
From
Refineries
3
Actual Year
Water from
Refineries
Title:
A33
Number:
Estimate Water from Refineries
Page: 20
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
Data
Acquire Data
from Ag Water
Users
1
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A3
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Item 19
WORKING
Compile
Recycled
Water from Ag
Operations 3
Actual Year
Recycled Water
from Agriculture
Title:
A34
Number:
Estimate Recycled Water from Ag Operations
Page: 21
Author: SWPB
Date: 10/10/01
Rev: 10/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A0
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio
Items 27,28,29,31,32,33
Groundwater
Storage Data
Data
Estimate
Groundwater in
Storage
1
A41
Actual Year
Groundwater in Storage
Water Portfolio
Item 8
Estimate Total
Groundwater
Banking
Recharge 2
Actual Year
Groundwater
Banking Recharge
A42
MWD
Local Agencies
Compile
Groundwater
Information
3
Groundwater
Experts
Title:
A4
Number:
Determine Groundwater
Page: 22
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
Acquire
Information for
Adjudicated
Basins 1
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A4
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Items 27,28,29,31,32,33
Groundwater
Storage Data
WORKING
Water Portfolio
Acquire
Information for
NonAdjudicated
Basins 2
Estimates of GW in
Non-Adjudicated Basins
Compile
Groundwater
Information
3
GW Information by Basin
Distribute GW
Information by
HR/PSA/DAU
4
GW by HSA/PSA/DAU
Actual Year
Groundwater in
Storage
Groundwater
Experts
Supply and Balance Work Team
Node:
Title:
A41
Number:
Estimate Groundwater in Storage
Page: 23
Author: SWPB
Date: 10/15/2001
Rev: 10/15/01
WORKING
READER
DATE
DRAFT
RECOMMENDED
A4
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
CONTEXT:
Water Portfolio
Item 8
Adjudicated Basin
GW Storage
NonAdjudicated
Basins 2
Local Agencies
Compile Total
Groundwater
Basin
Information 3
Groundwater Estimates
Groundwater by HSA/PSA/DAU
Distribute by
HR/PSA/DAU
4
Estimate Total
Groundwater
Banking
Recharge 5
Groundwater
Experts
Node:
A42
Actual Year
Groundwater
Banking Recharge
MWD
Number:
Author: SWPB
Date: 10/19/2001
Rev: 10/19/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A0
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Data
Actual Year Ag
Applied Water
Determine Ag
Applied Water
1
A51
Determine
Environmental
Water Use
2
Water Supply and
Balance Workteam
A52
Determine
Urban Water
Use
3
DWR Environmental
Water Use Workteam
A53
Actual Year Urban Water Use
for Each DAU/County Study
Area
Title:
A5
Number:
Compile Water Use
Page: 25
Author: SWPB
Date: 10/1/2001
Rev: 11/14/2001
WORKING
Determine
Irrigated
Agricultural
Acreage 1
RECOMMENDED
PUBLICATION
Precipitation
A511
Soils Information
Crop Information
Unit ETAW by
Crop by DAU
by County
Determine
Effective Precip
and ETAW Unit
Rate
2
USGS
A512
Paper Ag & Urban Workteam
Quads
Irrigation Efficiencies
Image Processing
Program
CONTEXT:
Irrigated Acres
by Crop by DAU
by County
Crop Acreage
Evaporation Information
DATE
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Data
READER
ETAW
Model
Irrigation Methods
Irrigation
Efficiencies
by Crop by DAU
by County
Determine
Irrigation
Efficiencies
A513
Pre-selected Panel
of Irrigation Experts
Actual Year Ag
Applied Water
Determine Ag
Applied Water
4
Ag & Urban
Workteam
Node:
Title:
A51
Number:
Determine Ag Applied Water
Page: 26
Author: SWPB
Date: 10/1/2001
Rev: 10/1/01
Determine
Actual Year
Land Use
Survey Data by
DAU by County
1
DATE
CONTEXT:
DRAFT
RECOMMENDED
A5111
Image
Processing
Program
READER
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Data
WORKING
Compile Actual
Year Land Use
Survey Data
2
Crop Acreage
USGS
Paper
Quads
Compare
Adjustment Factors
Previous
Survey with AC
Estimated Crop
Crop Report of
Apply
Acreage by County
Same Year 3
Adjustment
Factors to
Estimated Crop
Actual Year AC
Acres by DAU
Crop Report
Data
Disaggregate by County
4
Estimated
Cropping Pattern
Acreage to
DAU by County
5
Total Actual
DAU by County Acreage Percentage
and Estimated
Crop Acres by
DAU by County
6
Irrigated Acres
by Crop by DAU
by County
Ag & Urban
Workteam
Node:
Title:
A511
Number:
Determine Irrigated Agricultural Acreage
Page: 27
Author: SWPB
Date: 11/6/2001
Rev: 11/6/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Aerial Photos
Flight Plan
Acquire Aerial
Imagery
1
Scanned Aerial Image Files
Develop Field
Sheets
2
Field Sheets
A51112
USGS
Paper
Quads
Data
Final Land
Use GIS Layer
A51114
DAU Boundaries
Incorporate
DAU Layer and
Gross/Net
Corrections
5
A51115
Ag & Urban
Workteam
Node:
Title:
A5111
Number:
Determine Actual Year Land Use Survey Data by DAU by County
Page: 28
Author: SWPB
Date: 11/6/2001
Rev: 11/6/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Aerial Photos
WP
Scanner
Plot Scanned
Aerial
Photography
2
Plotter
Delineate Field
Boundaries USGS Paper Quads
onto USGS with Field Delineations
Quads using
Scanned Aerial Image Files
Aerial
Photography
3
Compile Field
Sheets
4
Field Sheets
USGS Paper
Quads
Title:
A51112
Number:
Develop Field Sheets
Page: 29
Author: SWPB
Date: 11/6/2001
Rev: 11/6/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Completed Field Sheets
Data
Satellite Imagery
(SPOT)
Rectify Aerial
Image
1
Digitize Field
Boundaries
and Attributes
on Screen 2
Image Processing
Program
Draft Digital
Digitize Field
Land Use Quad Layers
Boundaries
and Attributes
for Paper Field
Sheets 3
Incorporate
Quality Control
4
Digitizing Tablet
Final Land
Use GIS Layer
Title:
A51114
Number:
Develop Final Digital Field Boundaries and Attributes
Page: 30
Author: SWPB
Date: 11/6/2001
Rev: 11/6/01
DAU
Boundaries
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Final Land
Use GIS Layer
WORKING
WP
Data
Gross/Net Coefficients
Incorporate
Gross/Net
Corrections
Crop Acreage
Adjust Spring
and Truck Crop
Acres
4
Title:
A51115
Number:
Incorporate DAU Layer and Gross/Net Corrections
Page: 31
Author: SWPB
Date: 10/4/2001
Rev: 10/4/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
WP, Item 36, Ag Effective
Precip on Irr Lands
WP, Item # 47a, ETAW - Ag
Daily Precipitation
Compile
Precipitation
Data
1
Precipitation
Crop
Calendars
Crop
Information
Evaporation
Information
Compile
Planting and
Harvest Dates
2
ETo
Pan Evaporation
Crop Coefficients
Compile Pan
Evaporation or
CIMIS Data
3
Crop Coefficients
by Crop
Compile Crop
Coefficients
4
Compile Crop
Rooting Depth
and Available
Soil Moisture
5
Rooting Depths
and Available
Soil Moisture by DAU
Title:
A512
Unit ETAW by
Crop by DAU
by County
ETAW
Model
Compute
ETAW, ET and
Effective Precip
6
Number:
Determine Effective Precip and ETAW Unit Rate
Page: 32
Author: SWPB
Date: 10/4/2001
Rev: 10/4/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
WP, Item 49, Incidental E
and ET Ag Return Flows
Irrigation
Efficiencies
Compiled Data
Compile DWR
Existing Data
1
Irrigation Efficiencies
and Documentation
Modify Existing
DWR Data
Irrigation
Methods
2
Peer Review Comments
Submit for Peer
Review
3
Pre-selected Panel
of Irrigation Experts
Incorporate
Peer Review
Comments
4
Irrigation Efficiencies
by Crop by DAU
by County
Ag & Urban
Workteam
Node:
Title:
A513
Number:
Determine Irrigation Efficiencies
Page: 33
Author: SWPB
Date: 10/10/2001
Rev: 10/10/01
WORKING
READER
RECOMMENDED
PUBLICATION
Water Portfolio
Water Portfolio,
Managed Wetlands, Item 47b
A521
Determine
Instream Flow
Requirements
2
A522
Data
Mass Balance
Method
Determine Wild
and Scenic
Rivers Water
Use
3
Title:
A52
Node:
Determine
Managed
Wetlands
Water Use 1
CONTEXT:
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Data
DATE
Determine
Other
Environmental
Water Uses5
Compile
Other A525
Environmental Environmental
Water Use
Water Use
6
Actual Year
Environmental
Water Use
Number:
Determine Environmental Water Use
Page: 34
Author: SWPB
Date: 10/10/2001
Rev: 10/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio, Managed Wetlands, Item 38
Data Availability
Identify
Wetland
Resources
Data
Habitat Acreage
Determine
Wetland
Acreage by
Habitat Type
2
Actual Wetland
Acreage by
Habitat Type
A5212
Information on how
fields are managed
Wetland Water
Use Characteristics
Develop
Wetland Water
Use
Characteristics
by Vegetation/
Habitat Type
3
A5213
ETAW Data
Outflow from Refuge Information
Develop ET,
EP & ETAW of
Wetland
Vegetation/
Habitat Types
4
Node:
ETAW of Wetland
Vegetation by
Habitat Type
A5214
Actual Year
Managed
Wetlands
Water Use
Calculate
Managed
Wetlands
Water Use
5
Water Supply
and Balance
Mass Balance Workteam
Method
Title:
A521
Water Portfolio,
Managed Wetlands, Item 47b
Number:
Determine Managed Wetlands Water Use
Page: 35
Author: SWPB
Date: 10/10/2001
Rev: 10/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
General Wetland Information
Data Availability
Habitat Acreage
Collect
Acreage of
Seasonal
Marsh 1
Collect
Acreage of
Permanent
Marsh 2
Collect
Acreage of
Brood Ponds
3
Collect
Acreage of
Water Grass
Management
4
Acres of
Water Grass
Management
Collect
Acreage of
Forage Crops
5
Acres of
Forage Crops
Determine
Wetland
Acreage by
Habitat Type
6
Actual Wetland
Acreage by
Habitat Type
Node:
Title:
A5212
Number:
Determine Wetland Acreage by Habitat Type
Page: 36
Author: SWPB
Date: 10/10/2001
Rev: 10/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Actual Wetland Data Availability
Acreage by
Habitat Type
Flood-up date
Identify Water
Depth
Management
3
Depth of
Water in
Fields
Evaluate Field
Seepage
Characteristics
4
Identify
Circulation
Flow
Management &
Quantities 5
Professional Judgement
Wetland Water
Develop
Use Characteristics
Wetland Water
Use
Characteristics
6
Title:
A5213
Number:
Develop Wetland Water Use Characteristics by Vegetation/ Habitat Type
Page: 37
Author: SWPB
Date: 10/11/2001
Rev: 10/11/01
DATE
CONTEXT:
RECOMMENDED
PUBLICATION
ETAW
Data
Evaluate
Seasonal
Marsh ET, EP
& ETAW 1
Evaluate
Permanent
Marsh ET, EP,
Precipitation
& ETAW 2
Habitat or
Rice
Coefficient
READER
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Wetland Water
Actual Wetland
Data
Use Characteristics
Acreage
Availability
by Habitat Type
Precip
WORKING
Evaluate
Summer Water
Grass ET, EP,
& ETAW 3
Forage
Crop ETAW
Water Portfolio,
Managed Wetlands,
Item 47b
Evaluate
Forage Crops
ET, EP, &
ETAW 4
Pan Evaporation
with or w/o Lake
Effect Reduction
Summer
Grass ETAW
Ag Water Use
Workteam
Crop ETAW Model
Calculate Total
ETAW/
Evaporation
5
ETAW of Wetland
Vegetation by
Habitat Type
Node:
Title:
A5214
Number:
Develop ET, EP & ETAW of Wetland Vegetation/ Habitat Types
Page: 38
Author: SWPB
Date: 10/11/2001
Rev: 7/25/02
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio,
Instream Use,
Item 44
Water Portfolio Item 73
Environmental
Laws, Agreements
and Regulations
Identify Legal
Instream
Requirements
1
Data
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Obtain
Measured
Releases (per
Reservoir Release Data downstream
Reservoir for
RIM Station)
2
Streamgage Data
Measured Releases
Comparison of
A5221 and A5222
Compare
Requirements
and Releases
3
Quantify Unmet
Entitlements, If
Any
4
Title:
A522
Number:
Determine Instream Flow Requirements
Page: 39
Environmental Laws, Agreements and Regulations Court Decisions, SWRCB Orders, Agreements between owner/operator and decision maker
Author: SWPB
Date: 10/11/2001
Rev: 5/2/02
WORKING
CONTEXT:
RECOMMENDED
PUBLICATION
Streamgage Data
Data
DATE
DRAFT
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio, Wild and Scenic Water Use, Item 46
The 1968 National Wild
and Scenic Rivers Act
READER
Data availability
Obtain
Measured
Streamflow
Data for
designated
river reach,
when available
2
Adjust
Measured data
for designated
river reach, if
necessary 3 Actual Year Wild
and Scenic
Water Use
Bulletin 1
General Rational Method (CIA)
Environmental Water Use Workteam
Node:
Title:
A523
Number:
Determine Wild and Scenic Rivers Water Use
Page: 41
Author: SWPB
Date: 12/7/01
Rev: 12/7/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A52
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio, Required
Delta Outflow Use, Item 45
Data
D-1641 legislation
Dayflow Data
DWR/ESO at Central
District or Website
Obtain delta
outflow
requirements
and convert to
Monthly required
monthly totals2
delta outflows
SWPOCO-Art Hinojosa
and website
Check with
DWR
O&M(JOC) for
their review 3
Title:
A524
Number:
Determine Bay Delta Outflow Requirements
Page: 42
Author: SWPB
Date: 10/11/2001
Rev: 10/11/01
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Data
Mass Balance Method
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Determine E
and ET from
Native
Vegetation 1
Precip
WORKING
Determine
Evaporation
from Natural
Lakes and
Reservoirs 2
EWA Data
Pan Evaporation
Method
Determine
Environmental
Water Account
Use
(n/a 1998 &
2000) 3
Environmental
Water Account
Use
Compile Other
Environmental
Water Uses
and Distribute
by HR 4
Other
Environmental
Water Use
Environmental Water
Use Workteam
Water Supply and Balance Workteam
Node:
Title:
A525
Number:
Determine Other Environmental Water Uses
Page: 43
Author: SWPB
Date: 10/11/2001
Rev: 10/11/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio
Water Portfolio Items
30a-d, 31, 32, & 38a-c
Data
Determine Self
Supplied Urban
Water Use by
Water Use
Sector for Each
DAU/ County
Study Area
2
A531
A532
Ag and Urban Workteam
Self-Supplied
Urban Water
Use by Water
Use Sector
for each DAU/
County Study Area
Compute
Actual Year
Urban Water
Use Overall
and by Water
Use Sector for
Each DAU/
County Study
Area
3
Title:
A53
Number:
Determine Urban Water Use
Page: 44
Author: SWPB
Date: 10/11/2001
Rev: 10/11/01
Compute Per
Capita Public
Water System
Production for
Each PWS
(Overall and by
Water Use
Sector)
1
Data
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio Items
30a-d, 31, 32, & 38a-c
Public Water System
Statistics Data
WORKING
Compute
Population
Weighted
Average Per
Capita Public
Water System
Production for
each
DAU/County
Study Area 3
Compute
Public Supply
Water Use
Overall and by
Water Use
Sector for each
DAU/County
Study Area 4
Title:
A531
Determine Public Supply Urban Water Use by Water Use Sector for Each
DAU/ County Study Area
Number:
Page: 45
Data
Author: SWPB
Date: 10/11/2001
Rev: 10/11/01
READER
CONTEXT:
DATE
DRAFT
RECOMMENDED
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Water Portfolio Items
30a-d, 31, 32, & 38a-c
Estimate Per
Employee NonResidental
Water Use by
Water Use
Sector 1
WORKING
Compute
Overall NonResidental
Water Use by
Type for Each
DAU/County
Study Area 2
Public Supply
Industrial Water Use
Subtract Public
Supply NonResidental
Water Use to
Estimate SelfSupplied NonResidental
Water Use for
Each
DAU/County
Study Area 3
Self-Supplied
Urban Water
Use by Water
Use Sector
for each DAU/
County Study
Area
Title:
A532
Determine Self Supplied Urban Water Use by Water Use Sector for Each
DAU/ County Study Area
Number:
Page: 46
Author: SWPB
Date: 10/19/2001
Rev: 12/10/2001
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A0
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Actual Year Reclaimed Water
Actual Year Groundwater Actual Year Precipitation
Actual Year Water Use
and Runoff Data
AW & ETAW
Actual Year
Surface Water
Apply
Depletion
Water Balance
1
A61
A62
Apply Applied
Water Balance
3
A63
Applied Water Balance
Title:
A6
Iteration
Computer Technology
Node:
Balance Water
Portfolio Flow
Diagram
4
Professional
Judgement
Actual Year
Flow Diagram
Number:
Compile Flow Diagram
Page: 47
Author: SWPB
Date: 12/10/2001
Rev: 12/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A6
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Actual Year Reclaimed Water
Actual Year Precipitation
Actual Year Groundwater
and Runoff Data
Actual Year Water Use
Actual Year
AW & ETAW
Surface Water
Determine
Total E & ET
Outflow to Spot
Sink and
Outflow to
Nevada,
Oregon,
Mexico 1
Net Supply
Develop Net
Supply (Supply
minus Deep
Percolation) Depletion Supply
2
Depletion Water Balance
Computer Technology
Develop
Depletion
Balance
Iteration of Supply
Data
Title:
A61
Number:
Apply Depletion Water Balance
Page: 48
Author: SWPB
Date: 12/10/2001
Rev: 12/10/01
WORKING
READER
DATE
CONTEXT:
DRAFT
RECOMMENDED
A6
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Actual Year Water Use Actual Year Reclaimed Water
AW & ETAW
Actual Year Precipitation and Runoff Data
Actual Year
Surface Water
E & ET
Develop E&ET
for AG, Urban,
Wetlands
1
Develop
Irrecoverable
Losses for
Conveyance
E&ET,
Incidental
E&ET 2
Irrecoverable Losses
Determine
Return Flow to
Developed
System - AG,
Urban, &
Wetland, R.F.
to Salt Sink, &
Outflow to
Nevada,
Mexico,
Oregon 3
Iteration/E&ET
Iteration/Return
Flows
Iteration/
Irrecoverable Losses
Return Flows
Water Supply
Develop Water
- Deep Perc
Supply (Supply
minus Deep
Percolation)4
Iteration/Water Supply
Balance Net
Water Use
5
Computer Technology
Title:
A62
Number:
Apply Net Water Balance
Page: 49
Author: SWPB
Date: 12/10/2001
Rev: 12/10/01
WORKING
Iteration/Applied Water
and Conveyance Losses
DATE
CONTEXT:
DRAFT
RECOMMENDED
A6
PUBLICATION
Notes: 1 2 3 4 5 6 7 8 9 10
Actual Year Reclaimed Water
Actual Year Precipitation and Runoff Data
Actual Year Water Use
Actual Year Surface Water
AW & ETAW
Actual Year Groundwater
Develop Ag,
Urban, and
Environmental
Applied Water
and
Conveyance
Losses 1
READER
Determine
Reuse, incl.
Return FLow
within Service
Area, Deep
Percolation 2
Reuse
Water Supply
Develop
Supply
3
Iteration/Reuse
Iteration/Water Supply
Develop
Applied Water
Balance
4
Computer Technology
Supply and Balance Work Team
Node:
Title:
A63
Number:
Apply Applied Water Balance
Page: 50
D:\data\Jennifer\IDEF0\Current\flow diagram(10.11.02).igx
+
Run Setup
Generators
Resources
Calendars
Initialization
Functions
Monitors
D:\data\Jennifer\IDEF0\Current\flow diagram(10.11.02).igx
Elapsed Time
Transaction Statistics
Transaction Statistics
Activity Statistics