WIP-Questions

1. Which intra operation steps might you want to enable if you have a just-in-time production
environment?
Ans: You would probably enable only Run and To Move to model your environment.
2. You cannot move more assemblies than are available at a routing operation.
a) True b) False
3.What are the three transaction available in WIP?
Ans: Material transaction, Move transaction, Resource transaction.
4.When the lot based resource gets charged?
Ans: When the first unit is moved, the lot based resources will be charged.
5.In a assembly, all the components have supply type as operational pull, they are serial
controled. During move transaction, how we can select the serial numbers.
Ans: During move transaction, a window Backflush will popup, there we can select serial
numbers.
6.For an assembly, the move transaction does not allow me to complete in that screen iteself?
What will be the problem.
Ans: The assembly will be serial control, therefore you have to complete it in completion
transaction screen only
7.In an assembly, one of the item has supply type = bulk, what transaction should i perform.
Ans: no need to perform any transaction, it is just a label.
8.In profile option, WIP: Define discrete job, it has been defined as concurrent. While creating a
Discrete order, what concurrent will be running?
Ans: WIP concurrent exploder.
9.Explain shopfloor status?
Ans: Shop floor status are control move transactions which can be assigned to interaoperations
steps.
10.What are the two types of scheduling available in WIP?
Ans: Dynamic lead time offsetting and Detailed scheduling.
11. Which status in discrete job cannot be reversed?
Ans: Complete No charges
12.Which field in Discrete job is non- editable before saving?
Ans: UOM
13.How can we add material and Resource in a discrete job? What is the implicaiton of this action
on bills and routing?
Ans: In Job / Schedule details we can add materials and resource for the particulat order. This will
be effect for this order only. Engineering BOM and Manufacturing BOM has no effect.
14.What is repetative schedule?
Ans: Repetative schedule builts an assembly on a line at specifited production rate and for
specified number of days.

15.How can you reverse manual resource charges?


Ans: You can manually charge the same resource to the job or schedule and enter a negative value
in the Units Applied field.
16.In Repetative schedule, while associating line and assembly, what will happen if we enter
hourly prodcution rate higher than the maximum hourly rate defined in production line?
Ans: An error message will pupulate and wont allow to enter quantity greater than maximum
hourly rate defined in production.
17.What are the different rescheduling options available in WIP?
Ans: Forward , Backward and Midpoint.
18.For a purchased item, how processing lead time is calculated in WIP?
Ans: WIP won't calculate Processing lead time for purchased item, we have to manually enter.
19.In OSP, what will happen if we receive quantity greater than PO quantity?
Ans: we cannot close the job, it will be shown in pending transaction.
20. In an assembly, same component is used in operation 10 (first) & 50 (last). How to specify this
in a bill?
Ans: Use reference designators to generate a range of Notion numbers with referencing to the
specific operations. This might be drawing conventions, general informations..Etc
21.I want to check what are all the components used for final assembly, their qty, the routing &
availability of child assemblies in Inventory. After checking, I want to convert that into discrete
job. What is the facility given by oracle to do the above scenario?
Ans: Use Simulate discrete Job
22.I use Substitute items in WIP material transaction?
a) True b) False
23.What are the controls available to generate requisitions during OSP process?
Ans: In WIP Parameters, Operation start time of OSP operation (Queue Stage in OSP),At the time
of creation of Job/schedule, Manual
24.Can we add an operation after it starting prodction. ( partial move transaction)
a) Yes b) No
25.Explain the status Pending Mass loaded in Repetative schedule
Ans: The out put of MRP will be Pending Mass loaded , since MRP does not consider existing
schedules.
Descriptive Questions
1.What are the types of WIP accounting class available in Oracle?
Ans: Standard, Asset non-standard, Expense non-standard, Repetitive, Standard lot based, Expense
non standard lot based, Maintenance.
2.Client is Pen manufacturer, He uses discrete manufacturing for his production. he sells pens and
refills (as spare), During manufacturing of pen, refill is one of the component and it is non stocked
. What setup to be done to manufacture and sell both pen and refill ( instead of defining two

seperate items for refill)


Ans: Create items Pen and refill with supply type push / pull
Creat bill for pen, attach refill as its one of the component,
Change the default supply tpe to Phantom. ( this will effect this particular bill only)
3.What is the difference between Complete and Close ?
Ans:
S.No Complete Close
1 When completed, the WIP value gets decremented and Inventory value gets incremented When
closed, the details are transferred to GL
2 Valuation accounts gets hit Variance account gets hit
4.In a Routing, an items manufacturing process is as per below..
10- Assembly
20 -Cleaning
30- Labeling
40- Inspection
50- Packing ,Here 40, Inspection is an occasional operation, not always be done. & 20. Cleaning is
always done but non-critical. Hence these are requested not to be done while performing Move
transaction in-order to have less manual effort. How to designate this requirement?
Ans:In standard operation, 20. Cleaning Disable Count Point & Select Auto charge. This will
not default this particular operation in the move transaction. This way can skip that particular
operation.
40. Inspection, Count point & Auto charge to be disabled. Hence whenever occasional need calls,
Add this operation to the Job by Job/Schedule Operations.
5.Create Discrete JOB for 10 nos, complete only 5 leave the remaining is Rejection. Hence this
rejected qty not to be considered while booking sales order? What setup to be done so that can be
avoided?
Ans: Create a Sub-Inventory and disable Allow reservation No. (Call it as Rejection sub
inventory)
Assign this DJ Routing __ completion sub inv, so as rejected components can be moved here
while Making Move transaction
Can check in the Availability window in the sales order screen, Available to reserve qty.
6.What are some reasons Oracle Work in Process would prevent you from performing a completion
transaction?
Ans: There is no available quantity in the To Move step of the last operation in the routing.
There is a shop floor status preventing movement from the To Move step of the last operation in
the routing.
The job/schedule status prevents transactions.
The item is not transact able
7.what is the difference between Standard and Non-standard discrete jobs?
Ans:
S.No Standard DJ Non-Standard DJ
1 Standard DJ controls material and operation required to build assemblies and collect
manufacturing cost Non-standard DJ controls miscellaneous activities eg: Rework, repair
2 Assembly in mandatory Assembly is not mandatory
3 We can Firm Cannot check Firm
4 Bill reference field is grey out Can enter item / assembly
5 Revision is not optional Revision is mandatory if the assembly has revision
6 Both Valuation and variance will be hit Only Variance will be hit

8.What are the status of DJ ( both user status and Processing status)
Ans
S.No User status Processing Status
1 Unreleased Pending routing load
2 released Failed routing load
Complete Pending bill load
Complete No charge Failed bill load
Cancel Pending scheduling
Hold Pending closed
Closed Failed close
9.Can i complete an assembly with out order? Explain in detail
Ans: Yes, In Workorder less completion we can complete an assembly with out order.
Ther are 4 options available: WIP assembly compeltion , WIP assembly return, WIP assembly scrap,
WIP return from scrap.
10.How to unclose an order, what are the prequestes for forecast
Ans: In Close Discrete jobs form query with the order number. Tools--> Unclose.
The prequestes are a) Job status should be closed.
b) Accounting period should be open

Standard Versus Non-Standard Jobs


Standard discrete jobs control the material, resources, and operations required to build
an assembly and collect its manufacturing cost.
Non-standard discrete jobs control material and collect costs for miscellaneous
manufacturing activity. They may or may not build an assembly. This type of activity
can include rework, field service repair, upgrade, disassembly, maintenance,
engineering prototypes, and other projects

Oracle Work In Process


Oracle Work in Process is the core of Oracles Discrete Manufacturing Solution. Oracle Work in
Process by itself provides a complete production management system that improves productivity,
quality, and responsiveness while maximizing throughput and production. In conjunction with
other modules within Oracle Discrete Manufacturing foot print, Oracle Work in Process provides
support for enterprise wide quality management, lot and serial genealogy and traceability and
support for various methods of planning and cost accounting, irrespective of whether your entire
manufacturing is in-house or you use services of contract manufacturers.
Thanks & Regards,
S.Grace Paul Regan
Posted by S.Grace Paul Regan at 2:03 AM 2 comments:

Thursday, May 27, 2010

Discrete Jobs

Definite quantity of job used to manufacture the quantity.


II. Types of Jobs
i. Standard
ii. Non- Standard
Standard Job will have the assembly with the defined Bill, Routing structure from BOM.
Job Type of Standard identifies the job as being: A discrete job that controls the material and
operation
requirements used to build assemblies and collect manufacturing costs
Nonstandard Job Type identifies the job as being:A discrete job that controls the material and
collects costs for
miscellaneous activities, such as:
Rework
Field service repair
Upgrade
Disassemble
Maintenance
Engineering prototypes
Thanks & Regards,
S.Grace Paul Regan
Posted by S.Grace Paul Regan at 11:22 PM No comments:

Wednesday, May 26, 2010

WIP Accounting Classes


WIP Accounting classes are used to assign valuation and variance accounts for jobs. The data
below Shows the wip accounting classes to be used for different type of jobs in SSL.
S.No -------- Discrete Job Type --------------------WIP Accounting Class
1 ------------Standard -------------------------------Standard
2 ------------Non Standard Asset --------------------Non Std A
3 ------------Non Standard Expense -----------------Non Std Ex
Thanks & Regards,
S.Grace Paul Regan.
Posted by S.Grace Paul Regan at 11:31 PM No comments:

Tuesday, May 25, 2010

Supply Type
i. Based on Bill
Components required for the Bill has to be issued. Method of issuing the components is given as
supply type in Bill of Material. If we can use the same , select based on Bill.
ii. Push
If all the components to be used as PUSH type, select PUSH. In PUSH, we need to issue the
components through WIP Component Issue transactions before starting the Job.
iii. Operation Pull
Components Issue will be taken care of by the system itself. Once the operation is completed,
required components will be pulled from the mentioned supply subinventory .
iv. Assembly Pull
Once the assembly is completed, required components for that assembly will be pulled from the
given supply subinventory.
v. Supplier
Issue of item by supplier, need not to transact this item . It is only for reference only to

the WIP Person as this component need not to be used.


vi .Bulk
Bulk component requirements can be viewed and are displayed on reports. They can be used to
communicate to the shop floor that bulk components must be used but need not be
transacted.Bulk supply type components are not backflushed nor do they default when issuing all
components for an assembly. we can, however, manually issue specific bulk components to a
discrete job or repetitive schedule.
Thanks & Regards,
S.Grace Paul Regan.
Posted by S.Grace Paul Regan at 5:51 AM No comments:

Tuesday, August 25, 2009

Return back components after Operation Pull and Assembly Pull


Backflush transactions 'pull' components with Operation Pull and Assembly Pull supply types from
inventory onto jobs and repetitive schedules. Backflush transactions can be launched by:
o completing assemblies at operations using the Move Transactions window
o moving and completing assemblies into inventory using the Move Transactions window
o completing assemblies into inventory using the Completion Transactions window
o receiving assemblies from an outside processing operation using the Oracle Purchasing, Enter
Receipts window
Move transactions imported through the Open Move Transaction Interface can also create
backflush transactions. Transactions imported through the Oracle Inventory, Inventory Transactions
Interface can also create backflush transactions.
Additional Information: Backflushing reduces the number of manual material transactions required
to process the discrete jobs and repetitive schedules.
Reverse Backflush Transactions
You can reverse backflush transactions and automatically return backflushed components back to
inventory. For example, pull components that are backflushed as you move assemblies forward in
a routing are automatically returned to inventory when you move assemblies backwards. Reverse
backflush transactions can be created as you do the following:
o reverse operation completion transactions using the Move Transactions window
o return completed assemblies from inventory to jobs and schedules using the Completion
Transactions
o move and return assemblies from inventory to jobs and schedules using the Move Transactions
window
o return or correct transaction receipts in the Enter Returns or Enter Corrections windows in
Oracle Purchasing.
Move transactions imported through the Oracle Work in Process Open Move Transaction Interface
can also reverse backflush transactions as can return transactions imported through the Inventory
Transaction Interface.
Note: You can, if necessary, issue and return pull components to and from jobs and schedules to
inventory using the 'Specific Component' option in WIP Material Transactions window
Backflush Supply Subinventories and Locators
Sufficient inventory must exist in a component's source subinventory and locator for backflush
transactions to complete successfully. If there is insufficient on-hand inventory to satisfy backflush
demand, the supply subinventory balance is forced negative even if the Oracle Inventory Allow
Negative Balance parameter is set to No.
The one exception is if the component you are backflushing is under lot, serial, or lot and serial
number control. In this case you cannot complete the backflush transaction until you select a
subinventory and locator that contains a sufficient quantity of valid lot and/or serial numbered

items.
Supply subinventories and locator can be defined at the item or bill of material component level.
If they are not defined, the system uses the supply subinventory and locator specified by the WIP
Backflush Supply Subinventory and Locator Parameters when components are backflushed.
To ensure adequate supply for backflush transactions, you can replenish supply subinventories and
locators as required.
Revision Control
For component items under revision control, the system always defaults the revision based on the
item's current revision as of the date of the transaction.
Thanks & Regards,
S.Grace Paul Regan
Posted by S.Grace Paul Regan at 11:04 PM No comments:

Monday, November 17, 2008

Discrete Job Statuses


Discrete job statuses describe the various stages in the life cycle of a job and control the
activities that you can perform on it.

User Controlled Statuses

You can manually change user-controlled statuses. For example, you can change a job's
status to Released to initiate the production cycle. Some user-controlled statuses are
automatically changed based on other events. For example, when you complete a job,
its status is changed to Complete.
Released The job is available for production and can be transacted
against. When a job is changed to this status, the date
released is automatically set to the current date and, if a
routing exists, the job quantity is moved to the Queue
intraoperation step of the first routing operation.
You can change jobs to this status as you define them.
Unreleased The job is not released for transaction activity. You can
update but cannot transact against it.
You can assign a status of Unreleased if there are no net
issue, move, resource, completion, or scrap charges
associated with the job and no purchase orders or purchase
requisitions linked to the job.
Complete The job is completed but accepting transactions and
charges. Jobs are automatically updated to this status when
the quantity completed into inventory equals the job

quantity.
You can manually assign this status only when you update
the job, not when you define it.
Complete-No Charges The job is complete and accepting no further activity. You
cannot update or transact against it, but you can change its

status to Complete. You can assign this status only when


you update the job.
On Hold You can update the job but cannot transact against it. You
can assign this status to a job when you define it.
Cancelled The job was cancelled before completion. You cannot
update the job or transact against it, but you can change its
status. You can assign this status only when you update the
job.
Closed The job is closed and accepting no further activity. Job are
automatically updated to this status upon successful
completion of the job close process. You can change jobs
with this status to another status if the accounting period
that the job was completed in is still open and if your
functional security setup permits.

Purging Discrete Jobs


You can use the Purge Discrete Jobs window to purge information associated with
discrete jobs that were closed in a now closed accounting period. You can purge all
discrete job information or just selected information: details (material requirements,
resource requirements, and operations), associated ATO configurations, or associated
move and/or resource cost transactions.
Before purging a job, you can view detail and ATO sales order information for that job.
You can also print one or all of the reports in the Discrete Job Packet for the job

Prerequisites
r You must have at least one closed period for your organization. See: Period Close,
Oracle Cost Management User's Guide.

To find jobs to purge:


1. Navigate to the Purge Discrete Jobs window. The Find Discrete Jobs window

appears.
2. Query to find one or more discrete jobs. See: Finding Discrete Jobs, page 3-82.
The Purge Discrete Jobs Summary window appears with the results of your query

Oracle ASCP, better known as Oracle Advanced Supply Chain Planning corresponds to MRP2 in the
evolution of planning systems. MRP1 took care of unconstrained planning and mostly addressed the
BOM explosion and lead time offset requirements for simplistic planning. But since MRP1 did not
take care of in-house and out-sourced, vendors capacities the need for an advanced planning system
which can take care of such constraints was realized and Oracle enhanced its simple MRP solution to
come out with a more advanced constrained based planning solution. This let to the advent of Oracle
ASCP module.

Oracle ASCP comes as a separate module in Oracle Applications suite with separate licensing
requirements.
Let me start by dwelling onto some of the initial topics on ASCP configuration from system
perspective.
Typically there are two kinds of architectures supported to incorporate Oracle ASCP module with
your ERP system.
1. Centralized Architecture
2. Distributed Architecture
Centralized architecture essentially means that your transactional modules and planning module
be sitting on the same application instance and would be pointing to the same database for data
storage. This architecture is preferred where the transactional data volume is not very high. Since
planning engine can put significant amount of load on the hardware it is very important to assess
the overall data volume load at the inception of ASCP implementation itself. From IT costing
perspective centralized architecture is good because there are obvious cost savings that can be seen
as this requires only one application tier and one database tier. But then as mentioned earlier this
decision should be strictly governed by the current data volume and the kind of growth you are
expecting for your business in future.
Distributed architecture, as the name suggests points to having planning modules installed on a
different instance. Again the decision to go for this architecture has to be governed by the
transactional data volume. This architecture has the inherent benefit that you can always keep your
planning data separate and continue your planning functions even when your transactional system is
down to due maintenance or patching activities etc.
To start with I would keep this post till here only and would dig deeper in the future posts. To
highlight what could be coming your way in future I would put down some of the topics here:
Technical architecture of ASCP, Engine logic for optimization, mapping constraints in EBS, plan
output analysis etc