Beruflich Dokumente
Kultur Dokumente
InvestorForum
IPPProjectstoProcure
2014
20
PT PLN (PERSERO)
Introduction
PLNwillprocureIPPstodevelopsomeprojectstomeet
electricitydemandinSumatra&BangkaIslandthrougha
competitivetenderprocess
6Projects:
6 Projects:
5CoalFiredSteamPowerPlant
1GasFiredPowerPlant
PLNwillenterintoPPAwiththeselectedIPPfor25yearterm
inaBuildOwnOperateTransfer(BOOT)scheme(coal),and
20 year term in a BuildOwnOperate (BOO) scheme (gas)
20yearterminaBuildOwnOperate(BOO)scheme(gas).
NoGovernmentGuaranteewillapplicable
2
Disclaimer
Thefollowinginformationaresubjecttochange.
FinalrequirementswillbedeterminedinthePQandRFP
Documents.
General Criteria
Consortium
Consortium,2
2 4members
4 members
ShallhaveadequateexperienceasIPPdeveloperaswellas
O&Mand/orEPC
Shallhaveadequatefinancialstrength
Hasminimumof5A2rankfromD&B(Dun&Bradstreet)
regardingitsfinancialstrengthandriskindicator
di it fi
i l t
th d i k i di t
Tocomplywithlocalcontentrequirement
Power
Powerplant&itssupportingfacilities,includingrequiredland
plant & its supporting facilities including required land
acquisition
Specialfacilities/Transmissionlinetotheinterconnection
point
Townfeeder20kV&relevantfacilitiestosupplysurrounding
area
Projects Locations
MeulabohCFPP3&4
(2x200 MW)
(2x200MW)
JambiCFPP
(2x400MW)
BengkuluCFPP
(2x100MW)
Sumbagsel1MinemouthCFPP
(2x150MW)
BangkaPeaker
GFPP(100MW)
Sumsel1Minemouth
CFPP(2x300MW)
PLTU Sumsel-1
2x300 MW - 2020
PLTU Sumbagsel-1
2x150 MW 2018/2019
1. Consortium,2
,
4members:
MiningCompany(minimum10%ofshareinSPC)
PowerCompany(minimum30%ofshareinSPC)
+Others(0or1or2)
+ Others (0 or 1 or 2)
2. CoalCalorificValue(HHV,GARinkcal/kg):TBD
3. CoalPriceFormula:Asperapplicableregulation
p
pp
g
1. MiningCompany:
g o pa y
Shallhavecoalminingexperience:inoperationandproduction
HoldsIUPOperasi Produksi withCleanandClearstatusforthe
proposedminingarea
d i i
Havingsufficientcoalreservetosupportpowerplantfor
minimum30yearsoperation,provenbyJORCreport
2. PowerCompany:
ShallhaveIPPdevelopmentexperience
Hasminimumof5A2rankfromD&B
3. Othermember
Other
Consortium
Member
Other
Consortium
Member
PowerCompany
Equity
Majority
C t l
Control
CoalMine
(IUP/PKP2B)
CoalSupply
Agreement
Project
Company
PowerPurchase
Agreement
Lenders
O&M
Contractor
EPCContractor
11
Scheme:CoastalCoal
PowerPlant(withpassed
throughschemeforcoal)
Net/ContractedCapacity:
2x200MW(+/ 10%)
Location: Meulaboh,Aceh
,
ConnectionPoint:radialto
Meulaboh SS275kV(will
beavailableon2017))
Estimated investment:USD
600M
Expected COD: 20182019
ExpectedCOD:2018
2019
Contractterm:25years
Contract scheme:BOOT
PLNwillprovidetheland
ill
id h l d
12
13
Scheme:CoastalCoal
PowerPlant(with
passedthrough
passed
throughscheme
scheme
forcoal)
Net/Contracted
Capacity:2x100MW
apac y
00
(+/ 10%)
Location: Bengkulu
Connection Point: radial
ConnectionPoint:radial
toPuloBaaiSS150kV
(will beavailableon
2016))
Estimated investment:
USD300M
Expected COD:2019
ExpectedCOD:2019
Contractterm:25years
Contract scheme:BOOT
14
Consortium
Member
Consortium
Member
Consortium
Member
Equity
CoalSupply
Agreement
CoalSupplier(s)
Project
Company
PowerPurchase
Agreement
Lenders
O&M
Contractor
EPCContractor
15
16
Consortium
Member
Consortium
Member
Consortium
Member
Consortium
Member
Equity
GasSupply
Agreement
Project
Company
PowerPurchase
Agreement
Lenders
O&M
Contractor
EPCContractor
17
Schedule
PQ
PQ
Issuance
RFP
RFP
Issuance
Bid
Bid
Submission
Projects
LoI
(Winning
(Winning
Bidder
Award)
PPA
PPA
Signing
Sumsel 1MMCFPP
Q12014
A il
April
Q22014
J
June
Q4 2014
O t b
October
Q32014
D
December
b
Q12015
M h
March
Sumbagsel1MM
CFPP
Q12014
April
Q22014
June
Q42014
October
Q42014
December
Q12015
March
M l b h 3&4 CFPP
Meulaboh3&4CFPP
Q12014
Q1
2014
April
Q22014
Q2
2014
June
Q32014
Q3
2014
September
Q42014
Q4
2014
November
Q12015
Q1
2015
February
Bengkulu CFPP
Q12014
April
Q22014
June
Q32014
September
Q42014
November
Q12015
February
BangkaPeakerGFPP
Q12014
Mei
Q32014
July
Q42014
October
Q42014
December
Q12015
March
Jambi CFPP
JambiCFPP
Q12014
Q1
2014
August
Q42014
Q4
2014
October
Q12015
Q1
2015
February
Q22015
Q2
2015
April
Q2 2015
July
18
Things to Prepare
Feedbacksubmission
Networkingtoestablishconsortium
ExpressionofInterest
D&Bratingapplication
Coal/gassupplypreparation
Lenderapproaching
ExpressionofInterestfromEquipmentsuppliers
19
Contacts
IPPProcurementDivision
PTPLN(Persero)
Head Office, Main Building 13th floor
HeadOffice,MainBuilding13
Jl.TrunojoyoBlokMI/135,KebayoranBaru,Jakarta
Indonesia12160
Ph.:
+62217227049(direct)
+61217221234(hunting)ext.1652
61 21 722 1234 (h ti ) t 1652
Fax:
+62217251511
www.pln.co.id
DivisionHead:HernadiBuhron(hernadi.buhron@pln.co.id)
IPPProcurementPlanning:
1
1.
Jefri Rosiadi (jefri rosiadi@pln co id)
JefriRosiadi(jefri.rosiadi@pln.co.id)
2. DwiHartono(dwi.hartono@pln.co.id)
3. SekarParamita(sekar.paramita@pln.co.id)
BookletrelatedtoIPPprocurementcanbedownloadedthroughthislink:
http://www.pln.co.id/dataweb/ipp/bookletipp.pdf
20
Thank you