Beruflich Dokumente
Kultur Dokumente
Page 1 of 5
C1 C2
P2
1S1
1S2 2S1
2S2
3.5.2.
C1 C2
P2
1S1
1S2 2S1
2S2
Make sure the ground resistance shall be as small as possible and not exceed 5 ohm.
4.2. High voltage transformer connection (H1)
Step down HV
Step down MV
Power transformer
Distribution transformer
H1
VT 1B
VT 1B
VT primary cubicle
VT secondary cubicle
Page 2 of 5
Primary
connection
of H1
transformer
Secondary
connection
of H1
transformer
Remark
secondary
Page 3 of 5
L-N= balance
L-L=balance
Recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= balance
L-L=balance
Recommended
L-N= balance
L-L=balance
Recommended
L-N= unbalance
L-L=balance
Not recommended
L-N= unbalance
L-L=unbalance
Not recommended
L-N= unbalance
L-L=unbalance
Not recommended
4.3. Example of wiring 3P4W CTVT with VT 1 Bushing (Ref: JIS C1210C)
L3
L2
L1
0
P1
A
A
P2
P1
1S1
1S2
1S2
1S2
1S1
1S1
P2
P2
P1
to metering
4.4. Example of wiring 3P3W CTVT with VT 2 Bushing (Ref: SPLN 57-1:1991)
T
S
R
P1
B
BA
A
1S1
P2
1S2
P2
P1
1S1
1S2
Page 5 of 5