Basis and Assumption

. The volume of the purged system is constant throughout the inerting/purging process.
. Assume that the ideal gas law holds and that the temperature of the gas in the vessel is th
. Assume that the composition of the gas is uniform throughout the purged system.
. Assume that the composition of the species to be diluted in the purge gas is constant durin

Reference:
Rolla, MO 65409-0249
.

ting/purging process.
the gas in the vessel is the same throughout the inerting/purging process.
e purged system.
urge gas is constant during the purging process.

Inert Gas (Nitrogen) Consumption


Nitrogen consumption is calculated based on batch purging (pressurized):
Step: 1

Determine the purged system volume

50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar

Step: 2

3-Phase Separator Volume


Water Buffer Vessel Volume

=
=

70.7
43.6

m3
m3

Purge system volume

68.6

m3

Determine the number of cycle for batch purging operation:


Initial Oxygen concentration
Required Oxygen concentration
Pressurized pressure
Initial and Final pressure
Nitrogen temperature

Step: 3

Step: 4

=
=
=
=
=

21
2
30
0
30

Required number of purging cycle =

% mol
% mol
psig
psig
C

Determine required volume of Nitrogen per cycle


Purged system volume
No. of mole of Nitrogen
Required volume of Nitrogen

=
=
=

68.6
m3
5628.0 kmol
126.1 Nm3

Total required volume of Nitrogen

378.2

Nm3

Determine required volume of Nitrogen at Nitrogen supply pressure


Nitrogen supply pressure
Nitrogen supply temperature
Required volume of Nitrogen

=
=
=

Volume of Nitrogen per cyclinder =


Required no. of Nitrogen cyclinder =

2640
30
2.32

psig
C
m3

0.2
12

m3

essurized):

INPUT
OUTPUT

er Buffer Vessel + 20 design margin to account for associated piping volume

(considering 50% of total volume + 10% margin to account on piping)

(assumed)
(assumed)
(considering ATM)
(considering ambient)

per cycle

assumed ambient temperature

Inert Gas (Nitrogen) Consumption


Nitrogen consumption is calculated based on batch purging (vacuum):
Step: 1

Determine the purged system volume

50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar

Step: 2

3-Phase Separator Volume


Water Buffer Vessel Volume

=
=

70.7
43.6

m3
m3

Purge system volume

68.6

m3

Determine the number of cycle for batch purging operation:


Initial Oxygen concentration
Required Oxygen concentration
Vacuum pressure
Initial and Final pressure
Nitrogen temperature

=
=
=
=
=

Required number of purging cycle =


Step: 3

Step: 4

21
0.0021
-13.24
0
40

% mol
% mol
psig
psig
C

Determine required volume of Nitrogen per cycle


Purged system volume
No. of mole of Nitrogen
Required volume of Nitrogen

=
=
=

68.6
m3
2404.9 kmol
53.9
Nm3

Total required volume of Nitrogen

215.5

Nm3

Determine required volume of Nitrogen at Nitrogen supply pressure


Nitrogen supply pressure
Nitrogen supply temperature
Required volume of Nitrogen

=
=
=

Volume of Nitrogen per cyclinder =


Required no. of Nitrogen cyclinder =

2640
30
1.37

psig
C
m3

0.2
7

m3

INPUT
OUTPUT

er Buffer Vessel + 20 design margin to account for associated piping volume

(considering ATM)

per cycle

assumed ambient temperature

Inert Gas (Nitrogen) Consumption


Nitrogen consumption is calculated based on continuous purging i.e. sweep through:
Step: 1

Determine the purged system volume

50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar

Step: 2

Step: 3

3-Phase Separator Volume


Water Buffer Vessel Volume

=
=

70.7
43.6

m3
m3

Purge system volume

4.0

m3

Determine required volume of Nitrogen


Initial Oxygen concentration
Required Oxygen concentration
Oxigen concentration in inert gas
Mixing facgtor

=
=
=
=

21
6
1
0.1

% mol
% mol
% mol

Required volume of Nitrogen

55.5

m3

Determine elapse time for purging


Inert gas flowrate
Elapse time

Step: 4

=
=

120.00 m3/h
27.7
min

Determine required volume of Nitrogen at Nitrogen supply pressure


Nitrogen supply pressure
Nitrogen supply temperature
Required volume of Nitrogen

=
=
=

Volume of Nitrogen per cyclinder =


Required no. of Nitrogen cyclinder =

2640
30
0.31

psig
C
m3

0.2
2

m3

ng i.e. sweep through:

INPUT
OUTPUT

er Buffer Vessel + 20 design margin to account for associated piping volume

assumed ambient temperature

3-Phase Separator
T/T
Dia.

Dimensions
9
m.
3
m.

Shell Volume
63.6

T/T
Dia.

Dimensions
6.605 m.
2.718 m.

Shell Volume
38.3

Water Buffer Vessel

Head Volume
7.1

Total Volume
70.7

Head Volume
5.3

Total Volume
43.6

2:1 Elipsoidal Head

Das könnte Ihnen auch gefallen