Sie sind auf Seite 1von 20

Task / Description

Thermalite Blockwork, under 100mm thick


Thermalite Blockwork, under 100-150mm thick
Thermalite Blockwork, over 150mm thick
Lightweight Concrete Blockwork, under 100mm thick
Lightweight Concrete Blockwork, under 100-150mm thick
Lightweight Concrete Blockwork, over 150mm thick
Heavyweight Concrete Blockwork, under 100mm thick
Heavyweight Concrete Blockwork, under 100-150mm thick
Heavyweight Concrete Blockwork, over 150mm thick
Face Finish, Raked Out
Face Finish, Bag Rubbed
Face Finish, Flush Pointing

Slow

Ave

Fast Units

1.8

2.5

3.2 m2/hr

1.4

1.9

2.5 m2/hr

1.2

1.6

2.1 m2/hr

1.5

2.2

2.9 m2/hr

1.4

1.9

2.1 m2/hr

1.2

1.6

2.0 m2/hr

1.4

2.1

2.9 m2/hr

1.2

1.6

2.1 m2/hr

1.1

1.4

1.8 m2/hr

71.4

- m2/hr

29.4

- m2/hr

17.6

- m2/hr

2.8
1.9
2.0
0.0
9.2
11.6
0.2
21.9

4.1

1-Jan-06
27-Mar-06
6-Sep-06
1-Nov-06
15-Mar-08
15-May-08
15-Aug-08
16-Aug-08
15-Mar-09
16-Dec-09
5-Jun-10
20-May-11
15-Nov-11
22-Nov-11
13-Jun-13
2-Apr-15
30-Apr-15

5.4
16.7
3.1
7.0
5.7
6.0
19.0
0.9
5.3

http://www.planningplanet.com/wiki/422384/rates-norms-durations
https://www.scribd.com/doc/12971085/International-Productivity-List

CALCULATION OF DURATION OF ACTI

Activity Description

Resources involved in activity

Dismantling of Existing Structures

Machine

Clearing of Building Area & Disposal

Clearing Site of Bushes, shrubs, roots


Turf, lifting and removal

Trees, small sizes and shrubs


Trees and Shrubs, 500mm - 900mm girth
Trees and Shrubs, 900mm - 1200mm girth
Trees and Shrubs, 1200mm - 1500mm girth

Bulk Excavation

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil


Hydraulic Excavator, 0.4m3 bucket, Sand/Soi
Hydraulic Excavator, 0.5m3 bucket, Sand/Soi
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Hard Ground
Hydraulic Excavator, 0.5m3 bucket, Hard Ground

Levelling & Compaction

Loose from side of excavation, including compactio

Anti-Termite treatment & PCC


Formwork in Footing

Shaft Slip Forming (in Running mm FIXED CREW)


Pilecaps, < 0.7m2
Pilecaps, 0.7-2.5m2
Pilecaps, 2.5-3.0m2
Pilecaps, > 3.0m2
Ground Beams, < 0.7m2
Ground Beams, 0.7-1.5m2

Ground Beams, 1.5-3.0m2


Ground Beams, 3.0-5.0m2
Elevated Plain Slab Soffit (Cantilever)
Beams, on erected falsework, width 100-200mm
Beams, on erected falsework, width 200-300mm
Beams, on erected falsework, width 300-500mm
Beams, on erected falsework, width 500-750mm
Beams, on erected falsework, width over 750mm
Walls, Construct Kickers (cleat to support F/w)
Walls, Fully Framed Formwork/Struts, 1.0-2.0m2
Walls, Fully Framed Formwork/Struts, 2.0-5.0m2
Walls, Fully Framed Formwork/Struts, over 5.0m2

Reinforcement in Footing
Concerete in Footing

Placing Concrete, By Wheelbarrow over 1-10m

Formwork in Columns

(Upto Plinth)

Reinforcement in Columns

( Upto Plinth)

Concrete placement in Columns

(Upto Plinth)

Formwork in Plinth Beams


Reinforcement in Plinth Beams
Placement of concrete in Plinth Beams

Placing Concrete, By Wheelbarrow over 10-20m

Water Proofing
Asphalt coatings, horizontal surfaces

Sand filling & compaction


DPC
RCC WORKS - PLINTH TO 1ST SLAB
Formwork in Columns
Reinforcement in Columns
Placement of concrete in Columns
Formwork in Beams & Slab
Reinforcement in Beams & Slab
Placement of concrete in Beams & Slab

Placing Concrete, By Wheelbarrow over 20-50m

RCC in Ramps & Plinth Protection


RCC in Stairs,Walls & Elevator Shaft
RCC WORKS- 1ST SLAB TO 2ND SLAB
Formwork in Columns
Reinforcement in Columns
Placement of concrete in Columns
Formwork in Beams & Slab
Reinforcement in Beams & Slab
Placement of concrete in Beams & Slab

Placing Concrete, By Wheelbarrow over 20-50m

RCC in Stairs,Walls & Elevator Shaft


RCC WORKS- 2ND SLAB TO ROOOF SLAB
Formwork in Columns
Reinforcement in Columns
Placement of concrete in Columns
Formwork in Beams & Slab
Reinforcement in Beams & Slab
Placement of concrete in Beams & Slab

Placing Concrete, By Wheelbarrow over 20-50m

RCC in Stairs,Walls & Parapet walls

Placing Concrete, By Wheelbarrow over 20-50m

RCC in OHWT

Placing Concrete, By Wheelbarrow over 20-50m

FINISHING WORKS
BRICK MASONARY & PLASTERING
Brick Masonary in Exterior Walls

Stretcher Bond, 0.5 Brick thick

Brick Masonary in Interior Walls

Stretcher Bond, 0.5 Brick thick

Providing Sound Proofing System in Walls

Glass Fibre, low pitc

Plastering on Beams & Slabs

Plastering Ceilings, Topcoat Skimming

Plastering on Columns & Walls


CEILING WORKS
Providing Gypsum Ceiling

Suspended Ceilings, Second Fix

Providing Acoustic Panel False Ceiling


FLOORING
Placing Crushed Stone in Floors
Granulithic (Chips) Flooring
GranolithicFlooring (Chips)
Brick Flooring in Patios (Yards)

Granolithic Flooring
Using one machine
Clay, quarry Tiles, small areas, much cutting

Brick Flooring in Patios (Yards)


WALLS AND FLOORS FINISHES
Stone Cladding on Walls & Columns
Grey Granite placement on Walls & Columns

ceramic wall tiles

Placing RAK /MML Tiles on Walls & Floors

ceramic wall tiles

Providing Pre-polished Granite on Floors & Walls

ceramic wall tiles

Providing 4" Porcelain Tile skirting on walls

ceramic wall tiles

Providing Granite skirting on Walls

ceramic wall tiles

Providing Granite Slab on stairs

ceramic wall tiles

PAINT AND POLISH WORKS


Applying Plastic Emulsion/Synthetic Paint on
Interior Walls
Providing Weather Shield Paint to Exterior Walls
WOOD WORKS
Providing of Deodar wood solid core Doors
Providing Vision Panel/Glazing Doors
Providing cabnets of Laminated Board

ALUMINIUM WORKS
Providing Aluminium Glass Doors
Providing Double Glazed Aluminium Windows
Providing Glass Doors in Glass Walls
Providing Tempered Glass Curtain Walls
Providing Double Glazed Curtain Walls
Providing Glass Partition Walls
STEEL WORKS
Providing of Steel Doors with M.S Tubing
Providing of Steel Louvered Doors
Providing of G.I. Sheet Rolling Shutters
Providing Metal / Steel Stairs & handrails
MISCELLANEOUS WORKS
Construction of Mop Sink
Providing Library Counter
Providing Low Height Partition Walls
Providing Terracoa Brick Tiles on Terrace
Providing Tufted Textured Loop Carpet
Providing PVC coated Rubber Flooring

Windows, Aluminum, 7.0-10.0m2

DURATION OF ACTIVITIES BASED ON STANDARD MANHOURS

s involved in activity

Productivity/ Man-hrs /
hr
Unit

Qty Unit

Total Qty

Total
Man-hrs

4.76

m3

25.00 m2/hr

0.04

m2

2.9 m2/hr

0.345

m2

14.0 m2/hr

0.071

m2

18.000

No.

- 1200mm girth

22.000

No.

m - 1500mm girth

26.000

No.

- 900mm girth

bucket, Sand/Soil

8.7 m3/hr

0.11

cu.m

bucket, Sand/Soi

28.6 m3/hr

0.03

cu.m

bucket, Sand/Soi

50 m3/hr

0.02

cu.m

bucket, Gravel Beds

7.1 m3/hr

0.14

cu.m

bucket, Gravel Beds

25 m3/hr

0.04

cu.m

bucket, Gravel Beds

40 m3/hr

0.025

cu.m

bucket, Clay/Chalk

7.1 m3/hr

0.14

cu.m

bucket, Clay/Chalk

25 m3/hr

0.04

cu.m

bucket, Clay/Chalk

40 m3/hr

0.03

cu.m

bucket, Hard Ground

6.1 m3/hr

0.16

cu.m

bucket, Hard Ground

22.2 m3/hr

0.05

cu.m

bucket, Hard Ground

28.6 m3/hr

0.03

cu.m

vation, including compaction

ning mm FIXED CREW)

1.16 m3/hr

0
0

300 mm/hr

0.003

mm

0.0

1.6 m2/h

0.625

m2

2 m2/h

0.500

m2

2.3 m2/h

0.435

m2

2.5 m2/h

0.400

m2

1.7 m2/h

0.588

m2

1.8 m2/h

0.556

m2

2.5 m2/h

0.400

m2

2.6 m2/h

0.385

m2

0.8 m2/h

1.250

m2

rk, width 100-200mm

1 m2/h

1.000

m2

rk, width 200-300mm

1.1 m2/h

0.909

m2

rk, width 300-500mm

1.3 m2/h

0.769

m2

rk, width 500-750mm

1.6 m2/h

0.625

m2

rk, width over 750mm

1.5 m2/h

0.667

m2

eat to support F/w)

7.1 m2/h

0.141

m2

ork/Struts, 1.0-2.0m2

1.8 m2/h

0.556

m2

ork/Struts, 2.0-5.0m2

2.2 m2/h

0.455

m2

ork/Struts, over 5.0m2

2.5 m2/h

0.400

m2

barrow over 1-10m

barrow over 10-20m

0
2.3m3/hr

0.435

0
0
0
0
0
0

1.8m3/hr

0.556

cu.m

4.2 m2/hr

0.24

m2

0
2577.99355 613.807988

barrow over 20-50m

barrow over 20-50m

barrow over 20-50m

0
0
0
0
0
0
0
0
1.1m3/hr

0.909

cu.m

0
0
0
0
0
0
0
0
0

1.1m3/hr

0.909

cu.m

0
0
0
0
0
0
0
0

1.1m3/hr

0.909

cu.m

barrow over 20-50m

1.1m3/hr

0.909

cu.m

barrow over 20-50m

1.1m3/hr

0.909

cu.m

eas, much cutting

1.3 m2/hr

0.7692

m2

1014.74624 780.574031

1.3 m2/hr

0.7692

m2

381.625826 293.558328

12 m2/hr

0.0833

m2

144.543022 12.0452519

3.2 m2/hr

0.3125

m2

3880.73863 1212.73082

2.6 m2/hr

0.3846

m2

9264.13017 3563.12699

1.2 m2/hr

0.8333

m2

2685.65766 2238.04805

1.2 m2/hr

0.8333

m2

219.694247 183.078539

3.1 m2/ hr

0.3226

Sq.m

169.531501 54.6875811

0.8 m2/ hr

1.2500

Sq.m

176.498549 220.623187

5.1m2/day

0.1961

1.5 m2/ hr

0.6667

Sq.m

594.985899 396.657266

1.5 m2/ hr

0.6667

Sq.m

3584.49975 2389.6665

1.5 m2/ hr

0.6667

Sq.m

1405.02135 936.680898

1.5 m2/ hr

0.6667

Sq.m

114.538269 76.3588461

0.8 m2/ hr

1.2500

Sq.m

54.3429744 67.928718

0.8 m2/ hr

1.2500

Sq.m

54.3429744 67.928718

Sq.m

11174.4947 2190.20097

2383.28778 467.311329

m2

0.196

No./hr

2.2 No.

46

101.2

No./hr

2.2 No.

22

48.4

m, 7.0-10.0m2

0.8

1.5m2/hr

0.66666667 m2

No.

274.037221 182.691481

Manpower

Days
(10hrs)

0.0

0.0

0.0

0.0

0.0

0.0

0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

1.0

0.0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10

6.1

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!

10

7.8

10

2.9

1.2

10

12.1

12

29.7

15

14.9

10

1.8

5.5

4.4

20
5

23.4
7.9

15

15.9

18.7

1.5

1.4

1.4

10

21.9

10.1

4.8

0.0

3.7