(MAx. MARKS
: 100)
Notes.-(l)
(2)
(3)
(4)
(5)
1.
(a)
(ii)
(iii)
10
Quality of fuel
(b)
(c)
(d)
Safety valve is a . . ..
(a)
Accessories
(b)
Mounting
(c)
Decorative
(d)
....
in the boiler
Gate valve
(b)
Globe valve
(c)
Butterfly valve
Presence of oxygen in it
(b)
Presence of sulpher in it
(c)
CON
1329
Marks
(v)
Function of Deaerator is to
(a)
(b)
(c)
(d)
(vi)
(vii)
(a)
improves combustion
(b)
(c)
(d)
Blowdown is required to
(a)
Controldrum pressure
(b)
(c)
(d)
(viii)
(ix)
(x)
(b)
(a)
(b)
(c)
(d)
Fuel analysis
(b)
Water analysis
(c)
Air analysis
(d)
Attemperation is done to
(a)
(b)
(c)
(d)
(iii)
(iv)
HGI of coal
(v)
3 Ts.
10
CON
1329
, 3
Marks
SECTION-2
Answer any four questions, Answer should be short and to the point only:2.
(b)
How air preheater improves boiler performance? Describe the working of tubular airheater.
(c)
(d)
(a)
(i)
(ii)
3.
(a)
(ii)
(i)
(iii)
(iv)
(c)
(d)
(i)
(ii)
(iii)
4.
(b)
(a)
Biomass fuel
Buckstay
(iii)
(iv)
Fusible plug.
(b)
What are the various methods used for flow control of a fan? Among
these which are energy efficient methods?
5 .:
(c)
(d)
CON
1329
Marks
5.
(a)
(b)
(c) Describe
(i)
(ii)
(iii)
(d)
Carbon-53%
(ii)
Sulpher-2%
(iii)
Hydrogen-2%
(iv)
02-1.5%.
Calculate theoretical quantity of air required in kg. for burning 1kg coal.
6.
20
(a)
(b)
Softener
DMPlant
RO Plant
(c)
(d)
(e)
(/) Why spiral wall design is adopted in a Supercritical Boiler? Why Transition header is required in this case?
CON
1330
2-30
P.M.
to 5-30
P.M.]
Note .-(1)
(b)
(ii)
(iii)
(iv)
(v)
(iii)
Turndown ratio
(iv)
BMCR '- ~~
(v)
(c)
\(1
Flame impingement.
(iii)
(iv)
(v)
10
over
CON 1330
y !~Marks
SECTION-2
Answer any four questions. Answer should be short and to the point only.
2.
(a)
(b)
(c)
(a)
(b)
(c)
(i)
(ii)
(iii)
(iv)
(a)
(b)
(c)
Explain how scaling takes place in boiler tube and How it affects
Boiler performance?
5.
(a)
(i)
(b)
(iii)
(iv)
List out some important field instruments used at boiler along with
its purpose.
CON
. 3
1330
(c)
(d)
(b)
(c)
(d)
(e)
Marks
5
6
20
CON
1331
STATE)
[TIME:
(MAx.
MARKs : 100)
Water wall
(b)
Bank tube
(c)
Primary superheater
(d)
Final superheater
(e)
Economiser
20
3.
- ~--
20
of a Deaerator
(b)
(c)
10
10
(b)
a)
i)
Leveltransmitter
ii)
Steam trap
iii)
Gate valve
iv)
Pneumatic
operated control
valve
v)
Y -type strainer
~
b)
c)
d)
e)
I
1~1
-(j
...
0
---1>Kl-
[Turn over
CON
1331
Marks
4.
5.
(b)
(c)
6.
20
20
Globe valve
(b)
(c)
Draw Front view and Top view of the object given below :..\
Top view
Front view
20