0m depth)
For 3m length
Sl No Description
Unit
Quantity Rate
Amount (Rs)
1.40
680.70
953.00
cum
0.10
6103.10
610.30
0.00
5167.40
0.00
0.70 18088.10
12661.70
kg
52.50
92.00
4830.00
19055.00
Sl No Description
Unit
Quantity
Rate
Amount (Rs)
1.40
680.70
953.00
cum
0.20
6103.10
1220.60
cum
1.70
5167.40
8784.60
0.39 18088.10
7054.40
kg
29.25
92.00
2691.00
20704.00
Description
Number
1.00
1.20
1.20
1.00
1.00
1.20
1.20
0.10
Footing
Column
Plinth Beam
Total
1.00
1.00
1.00
Weight @95kg/m3
Ls
1.20
0.20
3.00
1.20
0.20
0.20
0.30
0.70
0.45
1.40
1.40
Sl No
Description
Number
1.00
3.00
0.60
1.00
3.00
0.60
1.00
1.00
3.00
3.00
0.60
0.45
0.00
Footing
Total
Random rubble masonry with hard
stone in foundation and plinth including
levelling up with cement concrete 1:6:12
( 1 cement : 6 coarse sand : 12 graded
stone aggregate 20 mm nominal size)
at plinth level with Cement mortar 1:6
3 ( 1 cement : 6 coarse sand )
Foundation
Basement
Total
0.40
0.03
0.27
0.70
Total
52.50
1.00
1.00
3.00
3.00
0.60
0.20
h 60cm)
0.75
1.40
1.40
0.10
0.20
0.20
0.60
0.45
1.10
0.60
1.70
0.15
0.15
0.30
0.09
0.39
29.25
Sl No Description
Unit
Quantity
Rate
Day
Day
0.0625
0.0625
7200
2500
Day
Day
Day
Day
Day
0.885
1.765
0.53
1.415
2.41
750
750
750
750
750
cum
cum
cum
cum
cum
cum
Tonne
0.65
0.24
0.65
0.24
0.47
0.47
0.17
1220
1200
71.82
71.82
3700
315.19
62.69
Day
Day
0.1
1.63
800
750
Bhisti
Mixer
Vibrator
Sundries
Total
Add 1% for water charges
Total
Add 15% for contractors profit and
overheads
Total
AD
Day
Day
Day
Ls
0.7
0.07
0.07
1
750
4800
500
13.32
cum
Nos
cum
cum
cum
1
7
1
0.157
0.33
1050
5
76.67
76.67
2928.90
Day
Day
Day
Day
Ls
Ls
1.07
1.07
0.71
0.09
45.76
4.42
800
750
750
750
1
1
0.25
0.25
1.07
1.07
4500
62.69
1050
315.19
0.75
0.07
26.91
13.52
350
350
1
1
tonne
tonne
cum
cum
Day
Day
Ls
Ls
cum
cum
cum
cum
cum
tonne
tonne
Day
Day
Day
Day
Day
LS
0.67
0.22
0.89
0.445
0.445
0.32
0.32
1200
740
71.82
3700
315.19
8600
62.69
0.24
2.75
0.9
0.08
0.08
14.3
800
750
750
4800
500
1
9.2055
0.1083
0.1275
70
70
70
kg
kg
kg
Ls
Ls
22.1
130
1
1
Day
Day
Ls
Ls
3
1.5
78
49.7
800
750
1
1
tonne
tonne
cum
cum
0.25
0.25
1.07
1.07
8600
62.69
3700
315.19
Day
Day
Ls
Ls
0.75
0.07
26.91
13.52
750
750
1
1
kg
kg
Ls
Day
Day
Ls
1.05
1.05
0.26
0.01
0.01
0.26
60
0.062
1
800
750
1
Amount (Rs)
450.00
156.30
663.80
1323.80
397.50
1061.30
1807.50
5860.20
58.60
5918.80
887.80
6806.60
680.70
793.00
288.00
46.70
17.20
1739.00
148.10
10.70
80.00
1222.50
525.00
336.00
35.00
13.30
5254.50
52.50
5307.00
796.10
6103.10
1050.00
35.00
76.70
12.00
966.50
856.00
802.50
532.50
67.50
45.80
4.40
4448.90
44.50
4493.40
674.00
5167.40
1125.00
15.70
1123.50
337.30
262.50
24.50
26.90
13.50
2928.90
804.00
162.80
63.90
1646.50
140.30
2752.00
20.10
192.00
2062.50
675.00
384.00
40.00
14.30
8957.40
89.60
9047.00
1357.10
10404.10
7684.00
18088.10
644.40
7.60
8.90
22.10
130.00
2400.00
1125.00
78.00
49.70
4465.70
44.70
4510.40
676.60
5187.00
384.20
2150.00
15.70
3959.00
337.30
562.50
52.50
26.90
13.50
7117.40
63.00
0.10
0.30
8.00
7.50
0.30
79.20
0.80
80.00
12.00
92.00
Schedule of Rates
Sl No
Description
Machinary
Hydraulic Excavator with Driver & Fuel
1 for 6Hrs a day, @Rs 1200/ Hr
Hire & running charges of tipper, For
2 100km per day @Rs 25/km
3 Mixer for 8hrs a day @Rs. 600 per Hr
4 Vibrator
Labour
1 Excavator
2 Breakers
3 HoleDriller
4 Belders
5 Coolies
6 Mason
7 Bhisti
8 Fitter
9 Blacksmith
10 Mixer Operator
11 Carpender
12 WhiteWasher
13 Painter
Material
1 Powder
2 Fuse
3 Stone aggregate 40mm
4 Stone aggregate 20mm
5 Coarse Sand
6 Cement
7 Stones
8 Through & bond stones
9 Bricks
10 Stone Aggregate 10mm
11 Wall form panel 125x500mm
12 Comer angle (1.5m)
13 100mm channel shoulders
14 Double clip
15 Single clip
16 MS Tube - 40mm
17 Steel sections
18 Steel bars
19 Vitrified Tile 100 x 100
20 Acid resistant Tile
21 Acid proof cement
22 Secondclass teak wood
23 Black Enammelled MS Butt Hinges
24 MS Screws - 40mm
25 Plaster of paris
Unit
Rate
Day
7200
Day
Day
Day
2500
4800
500
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
750
750
750
750
750
800
750
800
800
750
850
750
750
kg
Nos
cum
cum
cum
tonne
cum
nos
Nos
cum
each
each
each
each
each
metre
kg
kg
sqm
sqm
tonne
cum
Nos
Nos
kg
25
10
1220
1200
3700
8600
1050
5
6.5
740
980
280
1000
75
60
225
70
60
1200
450
7400
41000
5.4
0.3
2.5
26 White Lime
27 Whiting
28 Dry Distember
29 Cement Primer
30 Dry Acrilic Distumber
31 Red oxide Zinc Chromite yellow primer
32 Oil type wood preservative
33 Spirit
34 Pigment
35 Shellac
Carriage
Distance - 7km
1 Stone aggregate 40mm
2 Stone aggregate 20mm
3 Coarse Sand (50km)
4 Cement
5 Stones
6 Bricks
7 Steel
8 Teak wood
kg
kg
kg
Litre
kg
3
3.29
26
70
40
litre
Litre
Litre
kg
Litre
58
6
37
1
192
cum
cum
cum
tonne
cum
nos
kg
cum
71.82
71.82
315.19
62.69
76.67
1.02
0.062
80.61