Beruflich Dokumente
Kultur Dokumente
Consulting Engineers
Tel.: 022 61547800. Fax.: 022 25111092
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
ORDER SPECIFICATION
OF
PLUG VALVE
Rev. No.
R0
R1
Rev. Date
09-05-2013
19-07-2013
Prepared by
Faisal Farooqui
Faisal Farooqui
Checked by
Nilesh Mahajan
Nilesh Mahajan
App. by (Consu.)
Jagdish Pathak
Jagdish Pathak
For Enquiry
For Order
Status
R2
R3
R4
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
INDEX
A. PROJECT INFORMATION .................................................................................................................... 3
B.
TECHNICAL SPECIFICATION................................................................................................................. 4
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
SCOPE ..................................................................................................................................................... 4
SPECIFICATION DATASHEET ........................................................................................................................... 4
SPECIAL REQUIREMENTS .............................................................................................................................. 4
INSPECTION AND TESTING ............................................................................................................................. 4
ERECTION AND COMMISSIONING .................................................................................................................... 4
GUARANTEE .............................................................................................................................................. 4
POST ORDER SUPPORT ................................................................................................................................ 5
DOCUMENT SUBMITTAL ............................................................................................................................... 5
8.1
8.2
8.3
C.
D. ANNEXURES .................................................................................................................................. 7
1.0
ANNEXURE I: .......................................................................................................................................... 7
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
A. Project Information
M/s. Carlsberg India Pvt. Ltd.
5th Floor, Paras Twin Towers, Tower B,
: Sector-54, Gurgaon,
Harayana-122 002
1.0
Client
2.0
Plant location
3.0
Project
4.0
5.0
Site data
Access to Site
Ambient data
(As per ISHARE)
DBT (0C)
WBT (0C)
RH (%)
Summer
42.2
25.6
26
Monsoon
32.2
28.3
78
Winter
10.0
6.7
60
By Road
: Patna
Railway Station
: Patna
Nearest Airport
: Patna
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
B. Technical Specification
1.0 Scope
The scope of specification covers design, manufacturing, assembly, inspection and supply.
2.0 Specification Datasheet
Please refer the following Annexures:
2. 1
1UV3
Annexure-I
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
6.2 All components shall be guaranteed against faulty design, defective or improper materials, poor workmanship
or failure from normal use during the guarantee period.
6.3 In case of non fulfillment of guarantee, vendor shall repair / replace such defective part/ parts of the
equipment supplied. Vendor shall be liable for all expenses occurred for such repair / replacement.
7.0 Post Order Support
7.1 Maintenance and trouble shooting
7.2 By giving notification on regular basis about any improvements available.
8.0 Document Submittal
Vendor to submit documents (soft copies as well as hard copies.) as given in schedule below.
8.1 Along With Offer
Vendor to submit following documents along with offer.
a.
Enquiry specification completely filled with all data (* points) and signed & stamped on all pages along with
deviation list (if any).
b.
Technical Catalogue.
b.
c.
b.
c.
d.
e.
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
C. Commercial Details
1.0
Price basis
2.0
Included
3.0
Excise Duty
Included
4.0
Sales Tax
5.0
Transportation charges
Included
6.0
Transit insurance
Included
7.0
Included
8.0
Documentation charges
Included
9.0
10.0
As per PO terms
Delivery
Doc. No.
Revision No.
KCPL:P1064:00:M05:126
R1
D. Annexures
1.0 Annexure I:
a
b
c
d
e
f
g
h
i
j
k
l
m
n
Item
Tag No.
Type
Design Standard
Dimension Standard(Face to Face)
Rating
Make
Model No.
Service
Op. Temperature - Min/Max (C)
Op. Pressure - Min/Max (kg/cm(g))
Testing Std. as per BS 6755 part-1
Body -Hydraulic (kg/cm(g))
Seat -Hydraulic (kg/cm(g))
End Connection
Material of Construction
Body
Cover
Plug
Stuffing box
Lubricant Bolt
Hardware
Adapter
Handle
Operation
Packing
Finish
p
No.
1
2
3
4
5
6
7
External Surfaces
Unit Rate
Size (NB)
Qty. (Nos.)
15
As per Annexure
20
As per Annexure
25
As per Annexure
40
As per Annexure
50
As per Annexure
80
As per Annexure
100
As per Annexure
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Epoxy Painted
31
22
Flanged ASME B16.5,RF, 150#
Amount (Rs.)