Sie sind auf Seite 1von 2

IBM Maximo Asset Management 7.

5 Work Management
Formation Informatique / Systmes d'exploitation / IBM Systmes

OBJECTIFS

Describe Work Management with Maximo Asset Management


Identify and modify settings, options, and constructs that affect work management
Define Preventive Maintenance
Create several different types of work orders
Create and modify work plans
Create PM Forecast and work order schedules
Create work assignments
Initiate and record work

PUBLIC

A retenir
Dure : 4 jours soit 28h.
Rf. TR632G

Toute personne dsireuse de russir la certification IBM Maximo Asset Management 7.5 Work Management

PRE-REQUIS
You should complete:
IBM Maximo Asset Management 7.5 Fundamentals (TR571)

Dates des sessions

PROGRAMME

Paris
19/10/2015

Unit 1: Overview
Lesson 1: The IBM Maximo product family
Lesson 2: Reporting and analytics review (includes navigation and query)
Unit 2: Setup and configuration for work management
Lesson
Lesson
Lesson
Lesson
Lesson

1:
2:
3:
4:
5:

Work management and system setup


System configuration and default settings
Core data constructs
Setting up Maximo Scheduler
Planning templates

Cette
formation est
galement
propose en
formule
INTRA-ENTREPRISE.
Inclus dans cette formation

Unit 3: Program-driven maintenance


Lesson 1: Program-driven maintenance overview
Lesson 2: Preventive maintenance
Lesson 3: Condition monitoring
Unit 4: Creating and generating work orders
Unit 5: Work planning
Lesson 1: Preventive maintenance
Lesson 2: Condition monitoring

Coaching Aprs-COURS

Unit 6: Scheduling planned work and forecasted PMs with IBM Maximo Scheduler
Lesson 1: IBM Maximo Scheduler overview
Lesson 2: Work schedules
Lesson 3: PM forecast schedules

Pendant 30 jours, votre formateur


sera disponible pour vous aider.
CERTyou s'engage dans la ralisation
de vos objectifs.

Unit 7: Assigning work to labor and crews


Lesson
Lesson
Lesson
Lesson

1:
2:
3:
4:

Work assignments and dispatching overview


Work Order Tracking
Assignment Manager
Graphical assignments

Unit 8: Tracking and reporting on work as its being completed


Lesson 1: Work 'actuals' in Maximo
Lesson 2: Initiating and completing the work
Lesson 3: Introduction to IBM Maximo Everyplace and the mobile workforce

PROCHAINES FORMATIONS
Russir la Certification Gestion de Projet PMP du PMI
Russir la Certification PRINCE2 Foundation

CERTYOU, 37 rue des Mathurins, 75008 PARIS - SAS au capital de 10 000 Euros
Tl : 01 42 93 52 72 - Fax : 01 70 72 02 72 - contact@certyou.com - www.certyou.com
RCS de Paris n 804 509 461- TVA intracommunautaire FR03 804509461 - APE 8559A
Dclaration dactivit enregistre sous le N 11 75 52524 75 auprs du prfet de rgion dIle-de-France

Votre garantie 100%


SATISFACTION
Notre engagement 100% satisfaction
vous garantit la plus grande qualit
de formation.

IBM Maximo Asset Management 7.5 Work Management


Formation Informatique / Systmes d'exploitation / IBM Systmes

Russir
Russir
Russir
Russir

les Certifications PRINCE2 Foundation et PRINCE2 Practitioner


la Certification ITIL Foundation
la Certification Agile certifi SCRUM Master
les Certifications TOGAF Certified et TOGAF Foundation

Retrouvez cette formation sur notre site :


IBM Maximo Asset Management 7.5 Work Management

CERTYOU, 37 rue des Mathurins, 75008 PARIS - SAS au capital de 10 000 Euros
Tl : 01 42 93 52 72 - Fax : 01 70 72 02 72 - contact@certyou.com - www.certyou.com
RCS de Paris n 804 509 461- TVA intracommunautaire FR03 804509461 - APE 8559A
Dclaration dactivit enregistre sous le N 11 75 52524 75 auprs du prfet de rgion dIle-de-France

Das könnte Ihnen auch gefallen