Sie sind auf Seite 1von 16

ALTERATIONS

NO.

DESCRIPTION

AUTHORITY

BY

DATE

1.0
1.1
2.1

KFELS
KFELS
KFELS

LCY
LCY
LCY

12-Sep-13
12-Sep-13
02-Dec-13

2.2
3.1
4.1

Issued for AFC


Added Padeyes List for M103-05 & 06.& revised as shown.
Revised Padeyes No. PE-306-24 and 25 and added PE-306-26 to 29
for M103-06.
Added Owners Approval Date and Comments
Added PE-306-30 to 31, TB-301-01 as shown.
Revised as shown, and re-issued for M883/M962/M963/M964/M965/M966.

PCM
CHECK
Choong K.W.
Choong K.W.
Choong K.W.

Owner
KFELS
KFELS

LCY
LCY
LCY

02-Dec-13
12-Dec-13
12-Mar-14

Choong K.W.
Choong K.W.
Choong K.W.

NO.

TITLE

REFERENCE DRAWING
PLAN NO.

PLAN BY

Keppel FELS Limited


50, Gul Road
Singapore 629351

Tel: (65) 68637200


Fax: (65) 68612148

PRINT RECORD

SETE BRASIL
th

DATE : 10 May-2013

SCALE:

HULL JOB No. :


M883/M962/M963/M964/M965/M966

DESIGNED BY: KFELS

PREPARE BY :

CHECKED BY :

Wahid

COST CODE NO.:

Alex / Ramli

APPROVED BY : Choong KW

JOB:

DSS38E-DP3
TITLE:

APPROVED BY:
OWNER

DATE:
Urca Drilling B.V

(PCF-DSS-ENG-MEC-121)

05-Sep-13

TEST MEMO
UPPER HULL - TROLLEY HOISTS
AND MAINTENANCE PADEYES

OTHER

PAGE 1 OF 16
KFELS DWG No :
DRAWING No :

TM-M025B
ALT.

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

1.0

REFERENCE

No.

Description

1.1

Main specification for construction and outfitting of the DSS-38E DP3 Semi Submersible.

1.2

Installation, Operation and Maintenance Manual for Trolley Hoists.

1.3

Page 2 of 16
Alt. 4

1.4

2.0

KFELS/ BFELS
Commissioning
Supervisor

Certificates for wire ropes and fittings, MPI and visual inspection report.
KFELS Drawing No. M883 M102-01 to M103-12 Machinery arrangement drawings for lifting
pad eye, trolley beams in machinery compartments.

PURPOSE

3.0

2.1

To ensure proper installation of trolley hoists, trolley beams and maintenance pad eyes.

2.2

To demonstrate loading capacities of trolley hoists, trolley beams and maintenance pad eyes.

EQUIPMENT REQUIRED

No.

Description

3.1

Certified test weights according to Test Load indicated in Tables (5.3) and (6.1).

3.2

Slings, shackles, etc. of various sizes and capacities for item (3.1) above.

3.3

Temporary chain hoists according to Test Load indicated in Tables (5.3) and (6.1) where
permanent ones are not available.

3.4

Certified tensiometer (dynometer) may be used in place test weights. Capacity to be within range
for test. *

KFELS/ BFELS
Commissioning
Supervisor

1
4

*NOTE: All test instruments shall bear certificate of calibration (with traceability to RBC or equivalent) dated within
12 months of test.
4.0

INSTALLATION INSPECTION
4.1

Inspect and verify that trolley beams are completed according to the respective structural drawings.

4.2

Inspect and verify that pad eyes and other lifting gears are installed according to the respective structural and
arrangement drawings.

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

5.0

Page 3 of 16
Alt. 4

OPERATION AND LOAD TEST FOR TROLLEY HOISTS


5.1 Verify trolley hoist (chain hoist) data in Table 5.1. Record name plate data in Table 5.2.

Table 5.1

Trolley/ Hoist Data

Upper Hull
Item

Tag No.

Location

Trolley / Hoist
Model

SWL
(ton)

Lift
(m)

HTG-A-2T
YL 2T/1

2.1

3.6

3.6

3.6

3.6

3.0

3.6

3.0

M102-04 ( Mech Workshop )


1

TB-204-01 Mech Workshop

M102-05 ( Generator Room 1 & 2 )


1

TB-205-01 Generator Room 1

TB-205-02 Generator Room 1

TB-205-03 Generator Room 1

TB-205-04 Generator Room 1

TB-205-09 Generator Room 1

TB-205-11 Generator Room 1

TB-205-05 Generator Room 2

TB-205-06 Generator Room 2

TB-205-07 Generator Room 2

10

TB-205-08 Generator Room 2

11

TB-205-10 Generator Room 2

HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1

M102-06 ( Generator Room 3 & 4 )


1

TB-206-01 Generator Room 3

TB-206-02 Generator Room 3

TB-206-03 Generator Room 3

TB-206-04 Generator Room 3

TB-206-09 Generator Room 3

TB-206-12 Generator Room 3

TB-206-05 Generator Room 4

TB-206-06 Generator Room 4

TB-206-07 Generator Room 4

10

TB-206-08 Generator Room 4

11

TB-206-10 Generator Room 4

12

TB-206-11 Generator Room 4

HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1

Remarks

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

Page 4 of 16
Alt. 4

Upper Hull
Item

Tag No.

Location

Trolley / Hoist
Model

SWL
(ton)

Lift
(m)

12

4.5

4.5

4.5

2.3

2.3

5.5

5.1

5.1

Remarks

M102-11-01 ( Mud Pump Room Aft Port/Stbd)


1

TB-211-01 HP Mud Pumps - AFT

TB-211-02 HP Mud Pumps - FWD

TB-211-03 HP Mud Pumps

TB-211-04 Charging & Mixing Pumps

TB-211-05 Material Handling

YL ITG-B20T
HTG-A-5T
YL 5T
HTG-A-5T
YL 5T
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1

M102-13 ( BOP/Hydraulic Workshop )


1

TB-213-01 BOP/Hydraulic Workshop

YL 2T/1

Hoist only

M102-12 ( Main HPU Room )


1

TB-212-01 Main HPU

TB-212-02 Main HPU

HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1

M102-14 (AuxiIiary / Chiller Room Fwd Port)


1

TB-214-01 Chiller Room

HTG-A-2T
QCH1002NS200M110-6A4C

30

Trolley (Manual) & Hoist


(Elect)

M102-15 (AuxiIiary / Chiller Room Fwd Sbd)


1

TB-215-01 General Store (Fwd Stbd)

M103-01 (Main Deck Aft Port)


1 TB-301-01 Burner Boom Handling (Port)
M103-02 (Sack Storage Room/Heavy Store)
1

TB-302-01 Material Handling

HTG-A-2T
QCH1002NS200M110-6A4C

30

YL ITG-20T

20

5.0

HTG-A-2T
QCH1002NS200M110-6A4C

8.1

3.3

3.3

Trolley (Manual) & Hoist


(Elect)

Trolley (Manual) & Hoist


(Elect)

M103-07 (Emergency Generator Room)


1

TB-307-01 Emergency Generator

TB-307-02 Emergency Generator

HTG-A-1T
YL 1T/1
HTG-A-1T
YL 1T/1

Notes:
1.Safe working load (SWL) given in metric tonnes. One (1) ton is equivalent to 1000 kg.
2.Where actual trolley hoists are not available for testing, load test of trolley beams may be done by mounting trolley hoist
of similar capacity.
3. TH denotes trolley hoist and H denotes hoist.

5.2

Mount trolley hoists on to respective trolley beams. Lubricate all lubrication points on trolley hoist adequately.

5.3
5.4

Run each trolley hoist along trolley beam without load. Verify smooth and unrestricted movement along trolley beam.
Verify that safe working load of trolley hoists are marked clearly on trolley hoist and trolley beam at minimum two (2)
prominent locations.

5.5
For option using certified test weights.
5.5.1 Raise test weights clear off the ground and secure test weights to hook.

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

Page 5 of 16
Alt. 4

5.5.2 Suspend test weights for 10 minutes. Verify that no signs of inadequacies are detected during hoisting and load holding. Indicate
test results S for satisfactory and UN for unsatisfactory in Table (5.3).
5.5.3 Lower test weights and remove from trolley hoist.
5.6
For option Using Tension meter (when testing with certified weights is not possible
5.6.1 When site conditions do not allow for testing with certified test weights, secure one end of tension meter to hook. Anchor the
other end of tension meter to strong point on deck level (provide temporary pad eyes where necessary).
5.6.2 Start applying pulling load in accordance with the test load (see Table 5.3). Beam shall be tested at one-and-half (1.5) times of
their safe working load under static conditions.
5.7

Record data in Table (5.3).

5.8

Tag each trolley beam with identification tag number according to Table (5.2) after satisfactory completion of test. SWL
marking to be done as per Hull issued drawing.

5.9

Repeat for each trolley beam Repeat steps (5.5) to (5.8) for a maximum of three lifting points along a particular trolley beam (2
extreme points & one at mid span).

2 5.10
2

100% MPI/ DPT weld connections between Trolley Beam Support and Structure and along the Trolley Beam. Trolley beams
indicated in Table 5.3 shall be performed after load test. MPI/ DPT test results to be enclosed in the final compilation of Test
Memo report.

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

Table 5.2

Page 6 of 16
Alt. 4

Name Plate Data For Trolley Hoists

Upper Hull
Item

Tag No.

Location

Make

Trolley/Hoist
SWL
Serial No.
Model
(ton)

Type

Lift
(m)

M102-04 ( Mech Workshop )


1

TB-204-01 Mech Workshop

Geared/Manual 2.1

M102-05 ( Generator Room 1 & 2 )


1

TB-205-01 Generator Room 1

Geared/Manual 4

TB-205-02 Generator Room 1

Geared/Manual 4

TB-205-03 Generator Room 1

Geared/Manual 4

TB-205-04 Generator Room 1

Geared/Manual 4

TB-205-09 Generator Room 1

Geared/Manual 3.6

TB-205-11 Generator Room 1

Geared/Manual 3.6

TB-205-05 Generator Room 2

Geared/Manual 4

TB-205-06 Generator Room 2

Geared/Manual 4

TB-205-07 Generator Room 2

Geared/Manual 4

10 TB-205-08 Generator Room 2

Geared/Manual 4

11 TB-205-10 Generator Room 2

Geared/Manual 3.6

M102-06 ( Generator Room 3 & 4 )


1

TB-206-01 Generator Room 3

Geared/Manual 4

TB-206-02 Generator Room 3

Geared/Manual 4

TB-206-03 Generator Room 3

Geared/Manual 4

TB-206-04 Generator Room 3

Geared/Manual 4

TB-206-09 Generator Room 3

Geared/Manual 3.6

TB-206-12 Generator Room 3

Geared/Manual 3.0

TB-206-05 Generator Room 4

Geared/Manual 4

TB-206-06 Generator Room 4

Geared/Manual 4

TB-206-07 Generator Room 4

Geared/Manual 4

10 TB-206-08 Generator Room 4

Geared/Manual 4

11 TB-206-10 Generator Room 4

Geared/Manual 3.6

12 TB-206-11 Generator Room 4

Geared/Manual 3.0

M102-11-01 ( Mud Pump Room Aft Port/Stbd)


1

TB-211-01 HP Mud Pumps

12 Geared/Manual 4.5

TB-211-02 HP Mud Pumps

Geared/Manual 4.5

Remark

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

Page 7 of 16
Alt. 4

Upper Hull
Item

Tag No.

Location

Make

Trolley/Hoist
SWL
Serial No.
Model
(ton)

Type

Lift
(m)

TB-211-03 HP Mud Pumps

Geared/Manual 4.5

TB-211-04 Charging & Mixing Pumps

Geared/Manual 2.3

TB-211-05 Material Handling

Geared/Manual 2.3

- /Manual

Remark

M102-13 ( BOP/Hydraulic Workshop )


1

TB-213-01 BOP/Hydraulic Workshop

5.5

M102-12 ( Main HPU Room )


1

TB-212-01 Main HPU

Geared/Manual 5.1

TB-212-02 Main HPU

Geared/Manual 5.1

Geared/Elect

30

Geared/Elect

30

M102-14 (AuxiIiary / Chiller Room Fwd Port)


1

TB-214-01 Chiller Room

M102-15 (AuxiIiary / Chiller Room Fwd Stbd)

TB-215-01 General Store Fwd Stbd

M103-01 (Main Deck Aft Port)


1
TB-301-01 Burner Boom Handling (Port)

20 Geared/Manual 6.0

M103-02 (Sack Storage Room / Heavy Store)


1

TB-302-01 Material Handling

Geared/Manual 8.1

M103-07 (Emergency Generator Room)


1

TB-307-01 Emergency Generator

Geared/Manual 3.3

TB-307-02 Emergency Generator

Geared/Manual 3.3

Notes:
1. Item number in Table (2.0) corresponds with that in Table (1.0). Verify that SWL is according to Table (1.0). For
trolley Type, indicate G for geared trolley and P for plain trolley.
2. TH denotes trolley hoist and H denotes hoist.

2
2
Table 5.3

Functional and Load Test for Trolley Beams

Upper Hull

Item

Tag No.

Load test
results
KFELS/
ABS
satisfactory
Date of Free MoveBFELS
Owner
(if
(S/UN)
Test ment (Y/N)
Commissioning Representative
applicable)
Supervisor
Marked
Load
Req'd Actual Hoist Beam
(Y/N)
SWL [tons]

Test Load
[tons]

M102-04 ( Mech Workshop )


TB-204-01

2.0

3.0

1
2
3
4

M102-05 ( Generator Room 1 & 2 )


TB-205-01
TB-205-02
TB-205-03
TB-205-04

2.0
2.0
2.0
2.0

3.0
3.0
3.0
3.0

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes

Page 8 of 16
Alt. 4

Upper Hull

Item

Tag No.

5
6
7
8
9
10
11

TB-205-09
TB-205-11
TB-205-05
TB-205-06
TB-205-07
TB-205-08
TB-205-10

Load test
results
KFELS/
SWL [tons]
ABS
satisfactory
Date of Free MoveBFELS
Owner
(if
(S/UN)
Test ment (Y/N)
Commissioning Representative
applicable)
Supervisor
Marked
Load
Req'd Actual Hoist Beam
(Y/N)

M102-06 ( Generator Room 3 & 4 )


1 TB-206-01
2 TB-206-02
3 TB-206-03
4 TB-206-04
5 TB-206-09
6 TB-206-12
7 TB-206-05
8 TB-206-06
9 TB-206-07
10 TB-206-08
11 TB-206-10
12 TB-206-11

Test Load
[tons]

2.0
2.0
2.0
2.0
2.0
2.0
2.0

3.0
3.0
3.0
3.0
3.0
3.0
3.0

2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0

3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0

1
2
3
4
5

M102-11-01 ( Mud Pump Room Aft Port/Stbd)


TB-211-01
12.0
18.0
TB-211-02
4.0
6.0
TB-211-03
4.0
6.0
TB-211-04
2.0
3.0
TB-211-05
2.0
3.0

1
2

M102-12 ( Main HPU Room )


TB-212-01
TB-212-02

2.0
2.0

3.0
3.0

M102-14 (Chiller Room Fwd Port)


1

2.0

3.0

M102-15 (General Store Fwd Stbd)


TB-215-01
2.0

3.0

M103-01 (Main Deck Burner Boom - Aft Port)


TB-301-01
20

30

1
3

TB-214-01

M103-02 (Sack Storage Room / Heavy Store


1 TB-302-01
2.0

3.0

M103-07 (Emergency Generator Room)


1 TB-307-01
1.0
2 TB-307-02
1.0

1.5
1.5

Note:
1.
2.

Tagging sequence refer to KFELS drawings number as shown.


TB denotes trolley beam.

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
6.0

Page 9 of 16
Alt. 4

LOAD TEST FOR MAINTENANCE PAD EYES


6.1

Verify location and safe working load of maintenance pad eyes according to reference drawings.
Check clear marking of SWL (Y/N Yes/No) on pad eyes. Record data in Table (6.1).

6.2

Determine test load based on one-and-half (1.5) times of pad eye safe working load.

6.3

Attach chain block to pad eye via shackles. Safe working load of shackle and chain hoist shall be 1.5 times the safe working
load of pad eye.

6.4 For option using certified test weights:6.4.1 Raise test weights clear off the ground and secure test weights to hook
6.4.2 Suspend test weights for 10 minutes. Verify that no signs of inadequacies are detected during hoisting and load holding.
Indicate test results S for satisfactory and UN for unsatisfactory in Table (6.1).
6.4.3 Lower test weights and remove from trolley hoist.
6.5 For option using tension meter (when testing with certified weights is not possible):6.5.1 When site conditions do not allow for testing with certified test weights, secure one end of tension meter to hook. Anchor the
other end of tension meter to strong point on deck level (provide temporary pad eyes where necessary).
6.5.2 Start applying pulling load in accordance with the test load (see Table 6.1). Pad eyes shall be tested at one-and-half (1.5) times
of their safe working load under static conditions.
6.6

Repeat for each maintenance pad eye. Record data in Table (6.1).

6.7 Tag each pad eye with identification tag number according to Table (6.1) after satisfactory completion of test. SWL marking to
be done as per Hull issued drawing.
6.8 List all pad eyes with unique identification tag numbers in Table (6.1). Number pad eyes as follows:
eg. PE-101-01
- PE -: Pad Eye
- 101 -: Compartment designated No.
- 01 -: Pad eye running number, 01, 02 etc
- TH -: Trolley Hoist
- TB -: Trolley Beam
100% MPI/ DPT weld connections of all the pad eyes and other lifting gears as indicated in Table 6.1 shall be performed
after load test. MPI/ DPT test results to be enclosed in the final compilation of Test Memo report.
Table 6.1
Padeye
No.

Load Test for Maintenance Pad Eyes

Location

Date of
Test

Equipment

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)

M102-01 PORT AFT AUX MACH. RM. & STORE ROOM


PE-201-01

AUX.

PE-201-02

Mach

PE-201-03

Room

PE-201-04

Braking
Resistor
Braking
Resistor

1.0

1.5

1.0

1.5

HP Wash Down

1.0

1.5

HP Wash Down

1.0

1.5

M102-02 HP COMPRESSORS / APV ROOM


HP Compressor
PE-202-01
No.1
HP Compressor
PE-202-02
HP
No.1
HP
Compressor
PE-202-03 Compres.
No.2
/ APV HP Compressor
PE-202-04
Room
No.2
HP Compressor
PE-202-05
No.3
HP Compressor
PE-202-06
No.3

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

PE-203-01
PE-203-02

Water

PE-203-03

Mist

PE-203-04

Room

PE-203-01

Page 10 of 16
Alt. 4

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
M102-03 WATER MIST & INERGEN ROOM

Date of
Test

Equipment

Water Mist
Pump
Water Mist
Pump
Water Mist
Pump
Water Mist
Pump
Water Mist
Pump

0.5

0.75

0.5

0.75

0.5

0.75

0.5

0.75

0.5

0.75

M102-04 MECHANICAL & ELECTRICAL WORKSHOP


Hydraulic Press
PE-204-02
Mech Power Hacksaw
PE-204-03 Workshop Power Hacksaw
PE-204-01

PE-204-04

Lathe 20" Swing

2.0
2.0
2.0
2.0

3.0
3.0
3.0
3.0

M102-05 GENERATOR ROOM NO.1 & NO.2


PE-205-01 Generator
PE-205-03

Room 1

PE-205-02 Generator
Room 2
PE-205-04

Starting Air
Compressor #1
F.O. Purifier #1
Starting Air
Compressor #2
F.O. Purifier #2

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

M102-06 GENERATOR ROOM NO.3 & NO.4


Starting Air
1.0
1.5
Compressor #3
Room 3
F.O. Purifier #3
1.0
1.5
Generator
F.O. Purifier #4
1.0
1.5
Room 4
M102-08 LV & MV SWBD.ROOM & AHU ROOM NO.2 & 3, AUX. HPU ROOM & STAIRWELL
Aux.
1.0
1.5
X-Mas tree
HPU
HPU RM
1.0
1.5
Recirculating
1.0
1.5
Cleaning Pump
Braking
Stairwell
1.0
1.5
Resistor No.1
1.0
1.5

PE-206-01 Generator
PE-206-02
PE-206-03

PE-208-08
PE-208-09
PE-208-10
PE-208-06
PE-208-07

M102-09 TRANSFORMER ROOM NO.1 & NO.4


PE-209-01
PE-209-02
PE-209-03
PE-209-04

Xmer
Rm No.1

Xmer
Rm No.4

Ship Service
XFMR #1
Ship Service
XFMR #2
Ship Service
XFMR #8
Ship Service
XFMR #7

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

M102-09 TRANSFORMER ROOM NO.2 & NO.3


PE-210-01
PE-210-02
PE-210-03

Xmer
Rm No.2

PE-210-04
PE-210-05
PE-210-06

Xmer
Rm No.3

Ship Service
XFMR #3
Drilling Drive
XFMR #2
Drilling Drive
XFMR #1
Ship Service
XFMR #4
Ship Service
XFMR #5
Drilling Drive

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

1.0

1.5

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

Equipment
XFMR #4
Drilling Drive
XFMR #3
Ship Service
XFMR #6

PE-210-07
PE-210-08

PE-211-01
PE-211-02

Mud Pump
No.#1 Motor

PE-211-03
PE-211-04
PE-211-05
PE-211-06

Mud Pump
No.#2 Motor

PE-211-07
PE-211-08
PE-211-09
PE-211-10

Mud Pump
No.#3 Motor

PE-211-11
PE-211-12
PE-211-13
PE-211-14

Mud Pump
No.#4 Motor

PE-211-15
PE-211-16
PE-211-17
PE-211-18
PE-211-19
PE-211-20
PE-211-21
PE-211-22
PE-211-23
PE-211-24
PE-211-25
PE-211-26
PE-211-27
PE-211-28
PE-211-29
PE-211-30
PE-211-31
PE-211-32
PE-211-33
PE-211-34
PE-211-35
PE-211-36

PE-211-50

Mud
Pump
Room

Mud Pump
No.#1 Crank
Mud Pump
No.#2 Crank
Mud Pump
No.#3 Crank
Mud Pump
No.#4 Crank
Mud Charging
Pump #1 Motor
Mud Charging
Pump #2 Motor
Mud Charging
Pump #3 Motor
Mud Charging
Pump #4 Motor
Mud Mixing
Pump #1 Motor
Mud Mixing
Pump #2 Motor
Mud Mixing
Pump #3 Motor
Relief Valve #1
Relief Valve #2
Relief Valve #3
Relief Valve #4
Discharge
Dampener

PE-211-51

Mud Agitator 2-1


Mud Agitator 2-2

PE-211-52

Mud Agitator2-3

Date of
Test

Page 11 of 16
Alt. 4

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
1.0

1.5

1.0

1.5

M102-11-01 MUD PUMP ROOM


8.0
12.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
12.0
8.0
2.0

3.0

2.0

3.0

2.0

3.0

2.0

3.0

2.0

3.0

2.0

3.0

2.0

3.0

0.5
0.5
0.5
0.5

0.75
0.75
0.75
0.75

4.0

6.0

M102-11-02 MUD PIT ROOM


1.0
1.5
1.0
1.5
1.0
1.5

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

Equipment

PE-211-53

Mud Agitator 2-4

PE-211-54

Mud Agitator 3-1

PE-211-55

Mud Agitator 3-2

PE-211-56

Mud Agitator 2-5

PE-211-57

Mud Agitator 2-6

PE-211-58

Mud Agitator 2-7

PE-211-59
PE-211-60
PE-211-61
PE-211-62

Mud Agitator 2-8

Mud
Pit
Room

Mud Agitator 1-1


Mud Agitator 1-2
Mud Agitator 1-3

PE-211-63

Mud Agitator 1-4

PE-211-64

Mud Agitator 1-5

PE-211-65

Mud Agitator 1-6

PE-211-66

Mud Agitator 1-7

PE-211-67

Mud Agitator 1-8

PE-211-68

Mud Agitator 1-9

PE-211-69

Mud Agitator 1-10

PE-211-70

Mud Agitator 1-11

PE-211-71

Mud Agitator 1-12

PE-211-72

Mud Agitator 1-13

PE-211-73

Mud Agitator 1-14

PE-211-74

Mud Agitator 1-15

PE-211-75

Mud Agitator 1-16

PE-213-02
PE-213-03
PE-213-04

0.5

0.75

Bottle
Rack

0.5
0.5
0.5
0.5
0.5
0.5
0.5

0.75
0.75
0.75
0.75
0.75
0.75
0.75

Bottle
Rack

0.5
0.5
0.5
0.5
0.5
0.5

0.75
0.75
0.75
0.75
0.75
0.75

Material
Handling

2.0

3.0

POD Dome

2.0
2.0
2.0
2.0

3.0
3.0
3.0
3.0

PE-213-15
PE-213-16
PE-213-17
PE-213-18
PE-213-20
PE-213-21

BOP
Equip
Room

PE-213-22
PE-213-23
PE-213-24
PE-213-25
PE-213-26
PE-213-27
PE-213-28
PE-213-30
PE-213-31
PE-213-32
PE-213-33
PE-213-34

PE-214-01
PE-214-02

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5

M102-13 BOP/HYDRAULIC WORKSHOP/POD WORKSHOP/ BOP EQUIP. ROOM


2.0
3.0
HPU Motor
2.0
3.0
2.0
3.0
2.0
3.0

PE-213-01

PE-213-19

Date of
Test

Page 12 of 16
Alt. 4

POD
W/shop

M102-14 FWD PORT AUX. ROOM & CHILLER ROOM


1.0
1.5
Chiller Unit 1
1.0
1.5

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

Equipment

Chiller
Room

Chiller Unit 2

PE-214-03
PE-214-04
PE-214-05
PE-214-06
PE-214-07
PE-214-08
PE-214-09
PE-214-10
PE-214-11
PE-214-12

PORT
FWD
AUX.

Chilled Water
Pump No. 1
Chilled Water
Pump No. 2
RO Water
Maker No. 1
RO Water
Maker No. 2
Sea Water Pump

PE-214-13

No. 1 Motor
Sea Water Pump

PE-214-14

No. 2 Motor

Date of
Test

Page 13 of 16
Alt. 4

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0

1.5

1.0

1.5

1.0
1.0
1.0
1.0

1.5
1.5
1.5
1.5

1.0

1.5

1.0

1.5
M103-01 MAIN DECK

PE-301-01
PE-301-02

Burner Boom
Clamp 1

PE-301-04

Burner Boom
Clamp 2

StbdAft
PE-301-03 Main Dk
PE-301-05
PE-301-06

Burner Boom
Clamp 3

PE-301-08

Burner Boom
Clamp 4

Port/Aft
PE-301-07 Main Dk

PE-303-01

PE-304-01
PE-304-02
PE-304-03
PE-304-04
PE-304-05
PE-304-06
PE-304-07
PE-304-08
PE-304-15
PE-304-16
PE-304-17
PE-304-18
PE-304-19
PE-304-20
PE-304-21
PE-304-22
PE-304-23
PE-304-24
PE-304-25

PE-305-01

10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0

15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0

M103-02 SACK STORAGE ROOM


Mud Cleaning
0.5
1.0
Pump Motor
M103-04 MUD LAB, MUD PROCESS AREA & SHAKER HOUSE
Trip TK Pump 1
1.0
1.5
Trip TK Pump 2
1.0
1.5
Desilter Pump 1
2.0
3.0
Desilter Pump 2
2.0
3.0
Desilter Pump 3
2.0
3.0
Desander Pump
2.0
3.0
Degasser Pp 1
2.0
3.0
Degasser Pp 2
2.0
3.0
Mono Pump 1
1.0
1.5
Mono Pump 2
1.0
1.5
Mud
Vacumn Unit 1
1.0
1.5
Process Vacumn Unit 2
1.0
1.5
Area
Vacumn Unit
1.0
1.5
Dryer
1.0
1.5
Centrifuge
Active Dryer
1.0
1.5
Centrifuge
Primary Screw
1.0
1.5
Conveyor
Secondary
1.0
1.5
Screw Conveyor
HPU Motor
1.0
1.5
Cutting Dryer
1.0
1.5
Sack
Storage

HPU-Electric

M103-05 CEMENTING AREA


2.0
3.0

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

Equipment

CMS
HCS
PE-305-03
AdvantageElectric
HCS
PE-305-04
AdvantageElectric
HCS
Cementing
PE-305-05
AdvantageArea
Electric
HCS
PE-305-06
AdvantageElectric
100 BBL Left
PE-305-07
Hand Batch
Mixer
100 BBL Left
PE-305-08
Hand Batch
Mixer
PE-305-02

PE-306-01
PE-306-02
PE-306-03
PE-306-04
PE-306-05
PE-306-06
PE-306-07
PE-306-08
PE-306-09
PE-306-10
PE-306-11
PE-306-12
PE-306-13
PE-306-14
PE-306-15
PE-306-16
PE-306-17
PE-306-18
PE-306-19
PE-306-20

PE-306-21
PE-306-22
PE-306-23
PE-306-24
PE-306-25
PE-306-26

Moon
Pool

Date of
Test

Page 14 of 16
Alt. 4

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
2.0
3.0
5.0

7.5

5.0

7.5

5.0

7.5

5.0

7.5

2.0

3.0

2.0

3.0

16 Ball Valves
16 Ball Valves
16 Ball Valves
16 Ball Valves
16 Ball Valves
12 & 8 Ball
Valves
12 & 8 Ball
Valves
6 & 4 Ball
Valves
6 & 4 Ball
Valves
Relief Valve
Relief Valve
Valve
Valve
Valve

2.0
2.0
2.0
2.0
2.0

Valve
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Manrider Winch
Manrider Winch
10 Ton Utility
Winch No.1

M103-06 MOON POOL


3.0
3.0
3.0
3.0
3.0

1.0

1.5

1.0

1.5

0.5

0.75

0.5

0.75

0.5
0.5
1.0
1.0

0.75
0.75
1.5
1.5

2.0

3.0

2.0

3.0

4.0

6.0

4.0

6.0

4.0

6.0

4.0

6.0

0.5

0.75

0.5

0.75

0.5

0.75

0.5

0.75

1.0
1.0

1.5
1.5

20.0

30.0

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.

Location

PE-306-27

2
PE-306-28

1
3

Moon
Pool

PE-306-29
PE-306-30

1
4

PE-306-31

Equipment
10 Ton Utility
Winch No.2
5 Ton Utility
Winch No.1
5 Ton Utility
Winch No.2
10 Ton Utility
Winch
10 Ton Utility
Winch
Mux Cable Reel
Sheave (Yellow)
Mux Cable Reel
Sheave (Yellow)
Hot Line Hose
Reel Sheave
Hot Line Hose
Reel Sheave
Mux Cable Reel
Sheave (Blue)
Mux Cable Reel
Sheave (Blue)

PE-306-32
PE-306-33
PE-306-36
PE-306-37
PE-306-34
PE-306-35

Date of
Test

Page 15 of 16
Alt. 4

SWL [tons] Test Load [tons] KFELS/ BFELS


Owner
ABS (if
Commissioning
Marked
Representative applicable)
Load
Req'd Actual
Supervisor
(Y/N)
20.0

30.0

10.0

15.0

10.0

15.0

20.0

30.0

20.0

30.0

M103-10 DRILL FLOOR


PE-310-01

Drill
Floor

Drawworks

1.0

1.5

M103-12 TOWING ARRGT


PE-312-03
PE-312-04

PE-312-05

PE-312-06
PE-312-07
PE-312-08
PE-312-09
PE-312-10
PE-312-11
PE-312-12
PE-312-13
PE-312-14
PE-312-15
PE-312-16

PE-312-17
PE-312-18
PE-312-19

Snatch Block
(Fwd Fish Plate)
Snatch Block
(Fwd Pendent
Wire)
Snatch Block
(Fwd 5T Air
Winch)
Snatch Block
Towing
(Fwd 5T Air
Winch)
Snatch Block
Arrgt
(Aft Fish Plate)
Snatch Block
(Aft Pendent
Wire)
Snatch Block
(Aft 5T Air
Winch)
Emerg.Towing
Wire Holder
(Fwd Stbd)
Emerg.Towing
Wire Holder
(Fwd Port)
Emerg.Towing
Wire Holder
(Aft Stbd)

20.0

30.0

4.0

6.0

10.0

15.0

10.0

15.0

20.0

30.0

4.0

6.0

10.0

15.0

10.0

15.0

4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0

6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0

Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
6.0

Page 16 of 16
Alt. 4

TEST ACCEPTANCE

The units and system covered under this test memo have been tested accordingly and found to be satisfactory in accordance with test
procedures

REPRESENTATIVES
OWNER
ABS
KFELS/ BFELS

NAME

SIGNATURE

DATE

Das könnte Ihnen auch gefallen