NO.
DESCRIPTION
AUTHORITY
BY
DATE
1.0
1.1
2.1
KFELS
KFELS
KFELS
LCY
LCY
LCY
12-Sep-13
12-Sep-13
02-Dec-13
2.2
3.1
4.1
PCM
CHECK
Choong K.W.
Choong K.W.
Choong K.W.
Owner
KFELS
KFELS
LCY
LCY
LCY
02-Dec-13
12-Dec-13
12-Mar-14
Choong K.W.
Choong K.W.
Choong K.W.
NO.
TITLE
REFERENCE DRAWING
PLAN NO.
PLAN BY
PRINT RECORD
SETE BRASIL
th
DATE : 10 May-2013
SCALE:
PREPARE BY :
CHECKED BY :
Wahid
Alex / Ramli
APPROVED BY : Choong KW
JOB:
DSS38E-DP3
TITLE:
APPROVED BY:
OWNER
DATE:
Urca Drilling B.V
(PCF-DSS-ENG-MEC-121)
05-Sep-13
TEST MEMO
UPPER HULL - TROLLEY HOISTS
AND MAINTENANCE PADEYES
OTHER
PAGE 1 OF 16
KFELS DWG No :
DRAWING No :
TM-M025B
ALT.
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
1.0
REFERENCE
No.
Description
1.1
Main specification for construction and outfitting of the DSS-38E DP3 Semi Submersible.
1.2
1.3
Page 2 of 16
Alt. 4
1.4
2.0
KFELS/ BFELS
Commissioning
Supervisor
Certificates for wire ropes and fittings, MPI and visual inspection report.
KFELS Drawing No. M883 M102-01 to M103-12 Machinery arrangement drawings for lifting
pad eye, trolley beams in machinery compartments.
PURPOSE
3.0
2.1
To ensure proper installation of trolley hoists, trolley beams and maintenance pad eyes.
2.2
To demonstrate loading capacities of trolley hoists, trolley beams and maintenance pad eyes.
EQUIPMENT REQUIRED
No.
Description
3.1
Certified test weights according to Test Load indicated in Tables (5.3) and (6.1).
3.2
Slings, shackles, etc. of various sizes and capacities for item (3.1) above.
3.3
Temporary chain hoists according to Test Load indicated in Tables (5.3) and (6.1) where
permanent ones are not available.
3.4
Certified tensiometer (dynometer) may be used in place test weights. Capacity to be within range
for test. *
KFELS/ BFELS
Commissioning
Supervisor
1
4
*NOTE: All test instruments shall bear certificate of calibration (with traceability to RBC or equivalent) dated within
12 months of test.
4.0
INSTALLATION INSPECTION
4.1
Inspect and verify that trolley beams are completed according to the respective structural drawings.
4.2
Inspect and verify that pad eyes and other lifting gears are installed according to the respective structural and
arrangement drawings.
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
5.0
Page 3 of 16
Alt. 4
Table 5.1
Upper Hull
Item
Tag No.
Location
Trolley / Hoist
Model
SWL
(ton)
Lift
(m)
HTG-A-2T
YL 2T/1
2.1
3.6
3.6
3.6
3.6
3.0
3.6
3.0
10
11
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
10
11
12
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
Remarks
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Page 4 of 16
Alt. 4
Upper Hull
Item
Tag No.
Location
Trolley / Hoist
Model
SWL
(ton)
Lift
(m)
12
4.5
4.5
4.5
2.3
2.3
5.5
5.1
5.1
Remarks
YL ITG-B20T
HTG-A-5T
YL 5T
HTG-A-5T
YL 5T
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
YL 2T/1
Hoist only
HTG-A-2T
YL 2T/1
HTG-A-2T
YL 2T/1
HTG-A-2T
QCH1002NS200M110-6A4C
30
HTG-A-2T
QCH1002NS200M110-6A4C
30
YL ITG-20T
20
5.0
HTG-A-2T
QCH1002NS200M110-6A4C
8.1
3.3
3.3
HTG-A-1T
YL 1T/1
HTG-A-1T
YL 1T/1
Notes:
1.Safe working load (SWL) given in metric tonnes. One (1) ton is equivalent to 1000 kg.
2.Where actual trolley hoists are not available for testing, load test of trolley beams may be done by mounting trolley hoist
of similar capacity.
3. TH denotes trolley hoist and H denotes hoist.
5.2
Mount trolley hoists on to respective trolley beams. Lubricate all lubrication points on trolley hoist adequately.
5.3
5.4
Run each trolley hoist along trolley beam without load. Verify smooth and unrestricted movement along trolley beam.
Verify that safe working load of trolley hoists are marked clearly on trolley hoist and trolley beam at minimum two (2)
prominent locations.
5.5
For option using certified test weights.
5.5.1 Raise test weights clear off the ground and secure test weights to hook.
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Page 5 of 16
Alt. 4
5.5.2 Suspend test weights for 10 minutes. Verify that no signs of inadequacies are detected during hoisting and load holding. Indicate
test results S for satisfactory and UN for unsatisfactory in Table (5.3).
5.5.3 Lower test weights and remove from trolley hoist.
5.6
For option Using Tension meter (when testing with certified weights is not possible
5.6.1 When site conditions do not allow for testing with certified test weights, secure one end of tension meter to hook. Anchor the
other end of tension meter to strong point on deck level (provide temporary pad eyes where necessary).
5.6.2 Start applying pulling load in accordance with the test load (see Table 5.3). Beam shall be tested at one-and-half (1.5) times of
their safe working load under static conditions.
5.7
5.8
Tag each trolley beam with identification tag number according to Table (5.2) after satisfactory completion of test. SWL
marking to be done as per Hull issued drawing.
5.9
Repeat for each trolley beam Repeat steps (5.5) to (5.8) for a maximum of three lifting points along a particular trolley beam (2
extreme points & one at mid span).
2 5.10
2
100% MPI/ DPT weld connections between Trolley Beam Support and Structure and along the Trolley Beam. Trolley beams
indicated in Table 5.3 shall be performed after load test. MPI/ DPT test results to be enclosed in the final compilation of Test
Memo report.
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Table 5.2
Page 6 of 16
Alt. 4
Upper Hull
Item
Tag No.
Location
Make
Trolley/Hoist
SWL
Serial No.
Model
(ton)
Type
Lift
(m)
Geared/Manual 2.1
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 3.6
Geared/Manual 3.6
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 3.6
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 3.6
Geared/Manual 3.0
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 4
Geared/Manual 3.6
Geared/Manual 3.0
12 Geared/Manual 4.5
Geared/Manual 4.5
Remark
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Page 7 of 16
Alt. 4
Upper Hull
Item
Tag No.
Location
Make
Trolley/Hoist
SWL
Serial No.
Model
(ton)
Type
Lift
(m)
Geared/Manual 4.5
Geared/Manual 2.3
Geared/Manual 2.3
- /Manual
Remark
5.5
Geared/Manual 5.1
Geared/Manual 5.1
Geared/Elect
30
Geared/Elect
30
20 Geared/Manual 6.0
Geared/Manual 8.1
Geared/Manual 3.3
Geared/Manual 3.3
Notes:
1. Item number in Table (2.0) corresponds with that in Table (1.0). Verify that SWL is according to Table (1.0). For
trolley Type, indicate G for geared trolley and P for plain trolley.
2. TH denotes trolley hoist and H denotes hoist.
2
2
Table 5.3
Upper Hull
Item
Tag No.
Load test
results
KFELS/
ABS
satisfactory
Date of Free MoveBFELS
Owner
(if
(S/UN)
Test ment (Y/N)
Commissioning Representative
applicable)
Supervisor
Marked
Load
Req'd Actual Hoist Beam
(Y/N)
SWL [tons]
Test Load
[tons]
2.0
3.0
1
2
3
4
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Page 8 of 16
Alt. 4
Upper Hull
Item
Tag No.
5
6
7
8
9
10
11
TB-205-09
TB-205-11
TB-205-05
TB-205-06
TB-205-07
TB-205-08
TB-205-10
Load test
results
KFELS/
SWL [tons]
ABS
satisfactory
Date of Free MoveBFELS
Owner
(if
(S/UN)
Test ment (Y/N)
Commissioning Representative
applicable)
Supervisor
Marked
Load
Req'd Actual Hoist Beam
(Y/N)
Test Load
[tons]
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
1
2
3
4
5
1
2
2.0
2.0
3.0
3.0
2.0
3.0
3.0
30
1
3
TB-214-01
3.0
1.5
1.5
Note:
1.
2.
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
6.0
Page 9 of 16
Alt. 4
Verify location and safe working load of maintenance pad eyes according to reference drawings.
Check clear marking of SWL (Y/N Yes/No) on pad eyes. Record data in Table (6.1).
6.2
Determine test load based on one-and-half (1.5) times of pad eye safe working load.
6.3
Attach chain block to pad eye via shackles. Safe working load of shackle and chain hoist shall be 1.5 times the safe working
load of pad eye.
6.4 For option using certified test weights:6.4.1 Raise test weights clear off the ground and secure test weights to hook
6.4.2 Suspend test weights for 10 minutes. Verify that no signs of inadequacies are detected during hoisting and load holding.
Indicate test results S for satisfactory and UN for unsatisfactory in Table (6.1).
6.4.3 Lower test weights and remove from trolley hoist.
6.5 For option using tension meter (when testing with certified weights is not possible):6.5.1 When site conditions do not allow for testing with certified test weights, secure one end of tension meter to hook. Anchor the
other end of tension meter to strong point on deck level (provide temporary pad eyes where necessary).
6.5.2 Start applying pulling load in accordance with the test load (see Table 6.1). Pad eyes shall be tested at one-and-half (1.5) times
of their safe working load under static conditions.
6.6
Repeat for each maintenance pad eye. Record data in Table (6.1).
6.7 Tag each pad eye with identification tag number according to Table (6.1) after satisfactory completion of test. SWL marking to
be done as per Hull issued drawing.
6.8 List all pad eyes with unique identification tag numbers in Table (6.1). Number pad eyes as follows:
eg. PE-101-01
- PE -: Pad Eye
- 101 -: Compartment designated No.
- 01 -: Pad eye running number, 01, 02 etc
- TH -: Trolley Hoist
- TB -: Trolley Beam
100% MPI/ DPT weld connections of all the pad eyes and other lifting gears as indicated in Table 6.1 shall be performed
after load test. MPI/ DPT test results to be enclosed in the final compilation of Test Memo report.
Table 6.1
Padeye
No.
Location
Date of
Test
Equipment
AUX.
PE-201-02
Mach
PE-201-03
Room
PE-201-04
Braking
Resistor
Braking
Resistor
1.0
1.5
1.0
1.5
HP Wash Down
1.0
1.5
HP Wash Down
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
PE-203-01
PE-203-02
Water
PE-203-03
Mist
PE-203-04
Room
PE-203-01
Page 10 of 16
Alt. 4
Date of
Test
Equipment
Water Mist
Pump
Water Mist
Pump
Water Mist
Pump
Water Mist
Pump
Water Mist
Pump
0.5
0.75
0.5
0.75
0.5
0.75
0.5
0.75
0.5
0.75
PE-204-04
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
Room 1
PE-205-02 Generator
Room 2
PE-205-04
Starting Air
Compressor #1
F.O. Purifier #1
Starting Air
Compressor #2
F.O. Purifier #2
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
PE-206-01 Generator
PE-206-02
PE-206-03
PE-208-08
PE-208-09
PE-208-10
PE-208-06
PE-208-07
Xmer
Rm No.1
Xmer
Rm No.4
Ship Service
XFMR #1
Ship Service
XFMR #2
Ship Service
XFMR #8
Ship Service
XFMR #7
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
Xmer
Rm No.2
PE-210-04
PE-210-05
PE-210-06
Xmer
Rm No.3
Ship Service
XFMR #3
Drilling Drive
XFMR #2
Drilling Drive
XFMR #1
Ship Service
XFMR #4
Ship Service
XFMR #5
Drilling Drive
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
1.0
1.5
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
Equipment
XFMR #4
Drilling Drive
XFMR #3
Ship Service
XFMR #6
PE-210-07
PE-210-08
PE-211-01
PE-211-02
Mud Pump
No.#1 Motor
PE-211-03
PE-211-04
PE-211-05
PE-211-06
Mud Pump
No.#2 Motor
PE-211-07
PE-211-08
PE-211-09
PE-211-10
Mud Pump
No.#3 Motor
PE-211-11
PE-211-12
PE-211-13
PE-211-14
Mud Pump
No.#4 Motor
PE-211-15
PE-211-16
PE-211-17
PE-211-18
PE-211-19
PE-211-20
PE-211-21
PE-211-22
PE-211-23
PE-211-24
PE-211-25
PE-211-26
PE-211-27
PE-211-28
PE-211-29
PE-211-30
PE-211-31
PE-211-32
PE-211-33
PE-211-34
PE-211-35
PE-211-36
PE-211-50
Mud
Pump
Room
Mud Pump
No.#1 Crank
Mud Pump
No.#2 Crank
Mud Pump
No.#3 Crank
Mud Pump
No.#4 Crank
Mud Charging
Pump #1 Motor
Mud Charging
Pump #2 Motor
Mud Charging
Pump #3 Motor
Mud Charging
Pump #4 Motor
Mud Mixing
Pump #1 Motor
Mud Mixing
Pump #2 Motor
Mud Mixing
Pump #3 Motor
Relief Valve #1
Relief Valve #2
Relief Valve #3
Relief Valve #4
Discharge
Dampener
PE-211-51
PE-211-52
Mud Agitator2-3
Date of
Test
Page 11 of 16
Alt. 4
1.5
1.0
1.5
3.0
2.0
3.0
2.0
3.0
2.0
3.0
2.0
3.0
2.0
3.0
2.0
3.0
0.5
0.5
0.5
0.5
0.75
0.75
0.75
0.75
4.0
6.0
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
Equipment
PE-211-53
PE-211-54
PE-211-55
PE-211-56
PE-211-57
PE-211-58
PE-211-59
PE-211-60
PE-211-61
PE-211-62
Mud
Pit
Room
PE-211-63
PE-211-64
PE-211-65
PE-211-66
PE-211-67
PE-211-68
PE-211-69
PE-211-70
PE-211-71
PE-211-72
PE-211-73
PE-211-74
PE-211-75
PE-213-02
PE-213-03
PE-213-04
0.5
0.75
Bottle
Rack
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.75
0.75
0.75
0.75
0.75
0.75
0.75
Bottle
Rack
0.5
0.5
0.5
0.5
0.5
0.5
0.75
0.75
0.75
0.75
0.75
0.75
Material
Handling
2.0
3.0
POD Dome
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
PE-213-15
PE-213-16
PE-213-17
PE-213-18
PE-213-20
PE-213-21
BOP
Equip
Room
PE-213-22
PE-213-23
PE-213-24
PE-213-25
PE-213-26
PE-213-27
PE-213-28
PE-213-30
PE-213-31
PE-213-32
PE-213-33
PE-213-34
PE-214-01
PE-214-02
PE-213-01
PE-213-19
Date of
Test
Page 12 of 16
Alt. 4
POD
W/shop
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
Equipment
Chiller
Room
Chiller Unit 2
PE-214-03
PE-214-04
PE-214-05
PE-214-06
PE-214-07
PE-214-08
PE-214-09
PE-214-10
PE-214-11
PE-214-12
PORT
FWD
AUX.
Chilled Water
Pump No. 1
Chilled Water
Pump No. 2
RO Water
Maker No. 1
RO Water
Maker No. 2
Sea Water Pump
PE-214-13
No. 1 Motor
Sea Water Pump
PE-214-14
No. 2 Motor
Date of
Test
Page 13 of 16
Alt. 4
1.5
1.0
1.5
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.0
1.5
1.0
1.5
M103-01 MAIN DECK
PE-301-01
PE-301-02
Burner Boom
Clamp 1
PE-301-04
Burner Boom
Clamp 2
StbdAft
PE-301-03 Main Dk
PE-301-05
PE-301-06
Burner Boom
Clamp 3
PE-301-08
Burner Boom
Clamp 4
Port/Aft
PE-301-07 Main Dk
PE-303-01
PE-304-01
PE-304-02
PE-304-03
PE-304-04
PE-304-05
PE-304-06
PE-304-07
PE-304-08
PE-304-15
PE-304-16
PE-304-17
PE-304-18
PE-304-19
PE-304-20
PE-304-21
PE-304-22
PE-304-23
PE-304-24
PE-304-25
PE-305-01
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
HPU-Electric
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
Equipment
CMS
HCS
PE-305-03
AdvantageElectric
HCS
PE-305-04
AdvantageElectric
HCS
Cementing
PE-305-05
AdvantageArea
Electric
HCS
PE-305-06
AdvantageElectric
100 BBL Left
PE-305-07
Hand Batch
Mixer
100 BBL Left
PE-305-08
Hand Batch
Mixer
PE-305-02
PE-306-01
PE-306-02
PE-306-03
PE-306-04
PE-306-05
PE-306-06
PE-306-07
PE-306-08
PE-306-09
PE-306-10
PE-306-11
PE-306-12
PE-306-13
PE-306-14
PE-306-15
PE-306-16
PE-306-17
PE-306-18
PE-306-19
PE-306-20
PE-306-21
PE-306-22
PE-306-23
PE-306-24
PE-306-25
PE-306-26
Moon
Pool
Date of
Test
Page 14 of 16
Alt. 4
7.5
5.0
7.5
5.0
7.5
5.0
7.5
2.0
3.0
2.0
3.0
16 Ball Valves
16 Ball Valves
16 Ball Valves
16 Ball Valves
16 Ball Valves
12 & 8 Ball
Valves
12 & 8 Ball
Valves
6 & 4 Ball
Valves
6 & 4 Ball
Valves
Relief Valve
Relief Valve
Valve
Valve
Valve
2.0
2.0
2.0
2.0
2.0
Valve
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Under Guide for
BOP
Manrider Winch
Manrider Winch
10 Ton Utility
Winch No.1
1.0
1.5
1.0
1.5
0.5
0.75
0.5
0.75
0.5
0.5
1.0
1.0
0.75
0.75
1.5
1.5
2.0
3.0
2.0
3.0
4.0
6.0
4.0
6.0
4.0
6.0
4.0
6.0
0.5
0.75
0.5
0.75
0.5
0.75
0.5
0.75
1.0
1.0
1.5
1.5
20.0
30.0
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
Padeye
No.
Location
PE-306-27
2
PE-306-28
1
3
Moon
Pool
PE-306-29
PE-306-30
1
4
PE-306-31
Equipment
10 Ton Utility
Winch No.2
5 Ton Utility
Winch No.1
5 Ton Utility
Winch No.2
10 Ton Utility
Winch
10 Ton Utility
Winch
Mux Cable Reel
Sheave (Yellow)
Mux Cable Reel
Sheave (Yellow)
Hot Line Hose
Reel Sheave
Hot Line Hose
Reel Sheave
Mux Cable Reel
Sheave (Blue)
Mux Cable Reel
Sheave (Blue)
PE-306-32
PE-306-33
PE-306-36
PE-306-37
PE-306-34
PE-306-35
Date of
Test
Page 15 of 16
Alt. 4
30.0
10.0
15.0
10.0
15.0
20.0
30.0
20.0
30.0
Drill
Floor
Drawworks
1.0
1.5
PE-312-05
PE-312-06
PE-312-07
PE-312-08
PE-312-09
PE-312-10
PE-312-11
PE-312-12
PE-312-13
PE-312-14
PE-312-15
PE-312-16
PE-312-17
PE-312-18
PE-312-19
Snatch Block
(Fwd Fish Plate)
Snatch Block
(Fwd Pendent
Wire)
Snatch Block
(Fwd 5T Air
Winch)
Snatch Block
Towing
(Fwd 5T Air
Winch)
Snatch Block
Arrgt
(Aft Fish Plate)
Snatch Block
(Aft Pendent
Wire)
Snatch Block
(Aft 5T Air
Winch)
Emerg.Towing
Wire Holder
(Fwd Stbd)
Emerg.Towing
Wire Holder
(Fwd Port)
Emerg.Towing
Wire Holder
(Aft Stbd)
20.0
30.0
4.0
6.0
10.0
15.0
10.0
15.0
20.0
30.0
4.0
6.0
10.0
15.0
10.0
15.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
Project : DSS-38E
Doc. No. : TM-M025B
Title
: Upper Hull - Trolley Hoists & Maintenance Padeyes
6.0
Page 16 of 16
Alt. 4
TEST ACCEPTANCE
The units and system covered under this test memo have been tested accordingly and found to be satisfactory in accordance with test
procedures
REPRESENTATIVES
OWNER
ABS
KFELS/ BFELS
NAME
SIGNATURE
DATE