Loc Box no 32
1.
2.
3.
4.
5.
Battery Box
1.
2.
3.
4.
Loc Box no 30
1.
2.
3.
4.
Loc Box no 29
1.
2.
3.
4.
Battery Box
1. Loc box fixing, sand filling & plastering not done.
2. E-Type lock not provided.
3. Wooden plank not provided.
Loc Box no 27
1.
2.
3.
4.
Battery Box
1. Loc box fixing, sand filling & plastering not done.
2. E-Type lock not provided.
3. Wooden plank not provided.
Loc Box no 26 (LVCD-SKND/JKPR new line)
1.
2.
3.
4.
5.
Loc Box no 25
1.
2.
3.
4.
Battery Box
1. Loc box fixing, sand filling & plastering not done.
2. Anti-theft arrangement not provided.
3. In place of connector battery are connected with wire.
Loc Box no 24
1. Loc box fixing, sand filling & plastering not done.
2. Choke, Charger & Resistance are not fixed.
3. Fuse not provided.
4. Earth enclosure for the loc earth not provided.
Battery Box
1. Plastering not done.
2. Hylum not fixing.
Loc Box no 22
1.
2.
3.
4.
Battery Box
1. Plastering not done.
2. E-type lock not provided.
3. Battery float not provided.
Loc Box no 21A
1. Loc box fixing, sand filling & plastering not done.
Loc Box CH-5
1. Telephone not provided.
2. Painting not done.
3. E-type lock not provided.
Loc Box no 21
1.
2.
3.
4.
Loc Box no 20
1.
2.
3.
4.
Loc Box no 19
1. Loc box fixing, sand filling & plastering not done.
2. Choke, Charger & Resistance are not fixed.
3. Fuse not provided.
Battery Box
1. Plastering not done.
2. Battery float not provided.
Loc Box no 18B
1.
2.
3.
4.
Battery Box
1. Plastering not done.
2. E-type lock not fixing.
Battery Box
1. Plastering not done.
Loc Box no 10
1.
2.
3.
4.
5.
Battery Box
1. Plastering not done.
Loc Box no CH-3
1.
6.
7.
8.
Loc Box no 8A
1.
2.
3.
4.
5.
Battery Box
1. E-type lock not provided.
2. Painting not done.
Loc Box no 8
1.
2.
3.
4.
5.
Battery Box
1. Plastering not done.
2. Earth continuity not done.
Loc Box no 7
1.
2.
3.
4.
5.
Loc Box no 6
1.
2.
3.
4.
5.
Battery Box
1. Plastering not done.
2. E-type lock not provided.
Loc Box no 5
1. Loc box plastering not done.
2.
3.
4.
5.
Battery Box
1. Plastering and sand filling not done.
2. Wooden plank not provided.
Loc Box no 4
1.
2.
3.
4.
Battery Box
1. Plastering not done.
Loc Box no 3
2.
3.
4.
5.
6.
Battery Box
1. Plastering not done.
Loc Box no 2
1.
2.
3.
4.
5.
6.
Loc Box no 2A
1.
2.
3.
4.
5.
Battery Box
Loc Box no 2C
1.
2.
3.
4.
5.
6.
7.
8.
Loc Box no 1
1.
2.
3.
4.
5.
6.
(C) SIGNALS:
S-2
1. Unit lock not provided.
2. Earth enclosure not provided.
3. Signal post plumbing not done.
S-6
1.
2.
3.
4.
5.
S-45
1. Unit lock not provided.
2.
3.
4.
5.
6.
7.
SH-4
1.
2.
3.
4.
5.
S-43
1.
2.
3.
4.
5.
SH-8
1.
2.
3.
4.
S-27
1.
2.
3.
4.
5.
6.
S-25
1.
2.
3.
4.
5.
6.
7.
8.
S-23
S-1
1. Unit lock not provided.
2. Ladder base not concreted.
3. Signal unit not painting.
4. Foundation plastering not done.
5. Ladder painting not done.
6. Signal post plumbing not done.
7. Soil filling required around the signal foundation.
8. Earth enclosure and earth continuity not provided.
9. Cable directed provided without any pipe for calling on signal unit.
10. Offset hole not covered.
S-44
1.
2.
3.
4.
5.
S-24
1.
2.
3.
4.
5.
6.
S-26
1.
2.
3.
4.
5.
6.
S-36(MESCO)
1.
2.
3.
4.
5.
S-42
1.
2.
3.
4.
S-28
1.
2.
3.
4.
5.
S-30
1.
2.
3.
4.
5.
S-32
1.
2.
3.
4.
5.
6.
(D)Track Circuits:
1.
2.
3.
4.
5.
6.
7.
(F) DN GOOMTY:
1.
2.
3.
4.
5.
(G) UP GOOMTY:
1.
2.
3.
4.
5.
6.