Beruflich Dokumente
Kultur Dokumente
Gas Hydrates
TT00-32
August 2000
TT00-32
TT00-32
August 2000
25
Pressure MPa
20
Solid
Hydrate
a
15
10
5
0
TT00-32
Gas &
Water
10
15
20
Temperature, C
25
TT00-32
August 2000
Ice
Land Well
200
Hydrate
Phase Diagram 400
Depth, m
Sediment
Ice &
Hydrate
600
Base of Permafrost
800
Hydrate
1,000
Phase
Boundary
Base of Hydrate
1,200
Geothermal
Gradient
1,400
1,600
-20
TT00-32
-10
0
10
Temperature, C
20
30
Offshore Well
Hydrate
Phase Diagram
Depth, m
200
400
Water
Water
Temperature
Phase
Boundary
600
800
Geothermal
Gradient
1,000
Sea Floor
1,200
Hydrate
1,400
1,600
-20
TT00-32
-10
0
10
Temperature, C
208
30
August 2000
Gas Well
Impermeable Rock
Hydrate Zone
Completion
Zone
Gas Zone
Porous
Zone
TT00-32
15m
Depth, in m
700
Well No 142
Well No 7
Hydrate
750
Gas
800
Water
850
TT00-32
10
August 2000
Depressurization
Hydrate Production
(Collett et al., 1998)
TT00-32
11
Thermal Injection-Cycle
Hydrate Production
(Collett et al., 1998)
TT00-32
12
August 2000
Riser
Drill Pipe
Plugged Choke/Kill Lines
Stuck Pipe
Frozen Disconnect
Dehydrated Mud
Hydrate
Enlarged Hole
TT00-32
13
Gas Plume
TT00-32
14
August 2000
Hole
Enlargement
Hydrate
Drilled
TT00-32
15
Hole Cleaning
Packers
Logging
Cementing
Running
16
Wire Line Tools
TT00-32
August 2000
Production
Facilities
Gas
Leakage
Open
Borehole
Gas
Hydrate
Hydrate
Hydrate
Free-Gas
Free-Gas
Cased
Borehole
Gas Release
Free-Gas
Cased
Borehole
Gas Leakage
Collapsed
Casing
Production
Of Hot
Hydrocarbons
Collapsed Casing
TT00-32
17
TT00-32
18
August 2000
TT00-32
19
Outer Boundary
DS
TT00-32
rw
Lower Boundary
10
re
20
August 2000
40
Temperature (degree F)
5 hours
12 hours
24 hours
20
48 hours
10
0
0
TT00-32
20
40
60
80
Radius (feet)
100
21
TT00-32
22
11
August 2000
TT00-32
23
TT00-32
24
12
August 2000
TT00-32
25
TT00-32
26
13
August 2000
TT00-32
27
Control Boat
Drillship
Insulated
pipe
Cool water
Drillpipe
Riser
Riser
TT00-32
Drilling
Cold water
Subsea
CT Rig
Seafloor
Wellhead
Hydrate
Power
cable
Pump
Seawater
Pump
Hole
Enlargement
Drillpipe
Drilling
14
Seafloor
Rig
28
August 2000
Submarine
Drilling Rig
Seawater
Buoyancy
chamber
Power Cable
TT00-32
29
Stopping Blowout
with Hydrate Plugs
(Makogon
Makogon,, 1997)
Cold water
injection
Debris in crater
G
500m
Relief well
700m
Hydrate plugs
Connection point (1000m)
TT00-32
15
30
August 2000
Well Log
Geologic
Cross Section
(Collett et al., 1998)
TT00-32
31
32
16
August 2000
TT00-32
33
17
August 2000