Beruflich Dokumente
Kultur Dokumente
E
EXTERNAL
XTERNAL S
SUPPLIER
UPPLIER
M
ANUFACTURING L
LOCATION
OCATION
MANUFACTURING
PREREQUISITES
Third-party registered to QS-9000
All elements of the QOS
assessment have been met
Must currently supply production
material to Ford with a minimum
12-month consecutive shipping
MS-9000 Self-assessment (MMSA)
with a minimum score of 100,
and no element less than 2
CONTINUOUS
IMPROVEMENT
PERFORMANCE METRICS
DEFINITION
CUSTOMER ENDORSEMENT
REQUIRED FROM
SIGNATURE LEVEL
Each Ford
customer plant
Plant Manager(s)
Supplier Technical
Assistance (STA)
Program Manager(s)
Delivery Performance
Supervisor
FCSD/FCSD-E
Quality Manager
VC Design Manager(s)
Q1 REQUIREMENTS
Field Actions
Campaigns
Recalls
Owner Notifications
Launch QRs
Supplier-responsible concerns, including design,
issued against a new-tooled part.
PSW Slippage
Supplier-responsible changes to PSW commitment
dates that affect a Ford build.
Fourth Edition
January 1999
Title:___________________________________________ Date:_________________
Q1
Yes
Yes
Supplier develops work
plan to meet all requirements of
Q1 defined under prerequisites and
performance metrics. Work plan
requires STA Engineer
approval.
No
________________________________________________________________________________
MS-9
e
by th
anied
________________________________________________________________________________
omp ting.
e acc
ra
ust b t recent
________________________________________________________________________________
s
sts m
eque ) and mo
OTE:
ent r
________________________________________________________________________________
SA
SE N
orsem ent (MM
PLEA
L end
m
________________________________________________________________________________
MP& lf-assess
e
000 S
ASSISTANCE
SUPPLIER TECHNICAL
PURCHASING
FAO PRODUCTION
________________________________________________________________________________
If no, please detail any issues/concerns which require resolution in order to assist us in
continuous improvement of our ability to satisfy your requirements.
Do you endorse this Facility/Organization for Q1?
Yes_____
Ford issues
Q1 Probation letter to supplier.
Supplier may not display Q1 flag
or plaque.
No_____
The scope of your evaluation should be a minimum of 6 months, with any exceptions
identified. Any additional information or detail that you wish to provide would also be
appreciated.
Customer Manager
To:
REVOCATION
STA Engineer reviews
data and assists supplier to
resolve issues or determines if
Q1 Probation or Revocation
is warranted.
MATERIAL
PROBATION
Customer
endorsement
revoked
Date:
Performance
falls below
Q1 levels.
FOR EXTERNAL
SUPPLIERS OF
PRODUCTION
Q1
Violation
of policy
(Pro Forma)
Q1 Probation/Revocation
The Q1 Process recognizes organizations that have sustained levels of excellence in
their systems and performance metrics resulting in
customer satisfaction.
This brochure provides all
requirements to obtain and
maintain Q1 as an External
Supplier of Production Material to Ford.
The administering activity of
the Q1 Process for external
suppliers of production
material is FAO Production
Purchasing Supplier Technical Assistance (STA).
Suppliers with questions or
issues concerning Q1 should
contact their assigned STA
Engineer.
Q & A:
Q1 PETITION PROCESS
Supplier
Manufacturing
Location
STA Engineer
reviews petition for completeness in
meeting requirements and validates all
performance metrics.
If any of the Q1
requirements are not met,
the STA Engineer returns
the petition to the supplier
with an explanation
of deficiencies
Q1 Location