Beruflich Dokumente
Kultur Dokumente
Thickener Plant
Chad Loan and Travis Orser
Contents
Conga Project
Testwork Methods and Results
Equipment Sizing
Fabrication progress
Conclusion
Conga Project
Direct results
Feed solids flux (t/m2h)
Feed density (% w/w)
Flocculant consumption (g/t)
Overflow (ppm)
Underflow density (% w/w (
Yield stress
70
70
65
65
60
60
%Slids
%Slids
Perol Phyllic
55
S.L. 0.40
50
55
S.L. 0.40
50
S.L. 0.56
S.L.0.56
S.L. 0.79
45
S.L. 0.77
45
40
40
0
10
15
20
FloccDosage,g/t
25
30
35
40
10
15
20
FloccDosage,g/t
25
30
35
40
Run
No
1
2
Solids
loading
(t/m2h)
0.56
0.56
Feed
Solids
(%w/w.)
14.0
14.0
Floc
Dose
(g/t)
24
31
Bed
Depth
(m)
1.9
1.0
UF Solids
(%w/w)
Vane YS (Pa)
0 shear
1 shear
2 shear
62.9
59.5
215
139
28
21
33
24
Run
No
3
4
5
6
7
Solids
loading
(t/m2h)
0.57
0.43
0.41
0.52
0.54
Feed
Solids
(%w/w.)
14.8
15.6
14.3
14.2
14.7
Floc
Dose
(g/t)
23.4
29.9
16.9
17.2
14.7
Bed
Depth
(m)
2.0
1.6
0.6
1.1
2.0
UF Solids
(%w/w)
Vane YS (Pa)
0 shear
1 shear
2 shear
58.6
67.0
63.1
62.7
61.3
90.8
291.8
185.9
212.8
223.7
21.5
125.4
32.9
32.6
32.6
30.1
172.0
42.8
39.9
40.8
200
100
OT 2x Chailhuagon - Original sample
OT 2x Chailhuagon - UF Recirc. Sample
Golder - Chailhuagon
Yield Stres, Pa
150
50
100
50
0
50
52
54
56
58
60
% Solids
62
64
66
68
70
50
55
60
65
% Solids
70
75
Rake mechanism
Using the unsheared yield stress data we identify the
required maximum operating torque
Combined Unsheared Yield Stress
600
Phillic
Chailhuagon
500
400
300
200
100
0
50
55
60
65
Solids %
70
75
Final Design
45m Diameter High Compression Paste thickener
7 Thickeners
0.43t/m2hr design solids loading
5m Side wall height
30 degree floor slope
Centre column design
14,500,000 Nm rake drive (K = 490)
Flange bolted construction
Concentric shear thinning system
Site Layout
Fabrication
Thickener Fabrication
Shipping
Shipping
Shipping
Shipping
Drives
Manufactured, assembled and tested
Conclusions
Testwork enabled the appropriate sizing
selections
Final dam deposition requirements was the
driver for thickener selection
The largest high compression/paste thickeners
and drives have been designed, fabricated and
delivered to site
Acknowledgements
Newmont
Kevin DeSomber, Jim Orlich and Simon Briggs
Outotec
James Wang Engineering and drives
Simon Courtenay Project management