Sie sind auf Seite 1von 15

SPECTRUM

TECHNICAL SPECIFICATION
AIR COMPRESSOR FOR BREATHING AIR
( 50 CFM)
(SCREWED TYPE, AIR COOLED)
MANUFACTURING PLANT NO.2 AT DEWAS

Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 1 OF 14

REVISION HISTORY
REVISION
00

File Location

EFFECTIVE DATE
02-01-2014

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

REASON FOR REVISION


FIRST ISSUE

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 2 OF 14

TABLE OF CONTENTS
1.0

APPROVAL SIGNATURES

2.0

OVERVIEW

3.0

INSPECTION, TESTING AND DISPATCH

4.0

DRAWINGS & DOCUMENTS

5.0

PACKING

6.0

SPARES

7.0

DATASHEET

File Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 3 OF 14

1.0 APPROVAL SIGNATURES


This document is prepared by the SPCPL team for the project of NAVIN FLUORINE
INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence this

document before being effective shall be approved by the QA team of NAVIN FLUORINE
INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project Authority.

SPCPL
Name

Designation

Prepared By

Rajesh Yerawar

Sr. Executive Mechanical

Checked By

Akhilesh Verma

Manager - Mechanical

Approved By

Sanjay Katkade

GM-Engineering

Name

Designation

Signature

Date

Signature

Date

CLIENT

Approved By

Authorized By

File Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 4 OF 14

2.0 OVERVIEW

2.1 PROJECT INTRODUCTION


Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2
facility at Dewas along with the necessary utilities.
Nearest railway station

DEWAS

Nearest airport

INDORE

Ambient conditions:

Summer ( DB / WB / % RH)

41.1 C / 25 C / 28 %

Monsoon ( DB / WB / % RH)

32.2 C / 27.8 C / 70 %

Winter ( DB / WB / % RH)

10 C / 7.2 C / 65 %

2.2 PROJECT STANDARD


Air Compressor units shall comply with all the requirements of the latest editions of the applicable
international/ national codes and standards as far as they are equal to or more stringent than these
specifications.
Units shall conform to the following standards/ codes of the latest edition.
i.
ii.
iii.
i.
ii.
iii.
iv.
v.
vi.

File Location

Screwed type Air Compressor: Manufacturers Standard


Design of pressure vessels: ASME Sec.- VIII, Div.- I
Process and Utility piping: ANSI B 31.3
National Electric code.
Electric motor as per IS 325 : 1996
Earthing acceptance as per standard code IS3043.
Mechanical vibration, balance quality requirement as per Grade G1 specified in ISO
1940/1.
Performance of air compressor as per ISO 1217 Edition-3.
Noise measurement according to ISO 2151:2004 using ISO 9614-2.

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 5 OF 14

3.0 INSPECTION, TESTING AND DISPATCH


The Air Compressor will be subjected to inspection at manufacturers works in the presence of
purchaser/consultant.
During inspection following routine tests shall be carried out:

Visual inspection for workmanship and verification with respect to specifications.


Mechanical operation of valves etc.
Functional test for control circuits.
Tightness of screwed/bolted connections

The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.
4.0 DRAWINGS & DOCUMENTS
Vendor to submit following Drawing & Documents at various stages.
4.1 Drawings (3 Sets)
-

GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed)

Electrical Circuit Diagrams

System schematics

4.2 Manuals and Procedures (3 Sets)


-

Operation and Maintenance manuals

Specialized procedures, if applicable (such as Calibration, Cleaning, etc.)


Specifications and sources of some important materials, if applicable (such as lubricants,
cleaning agents, etc.)
4.3 Lists (3 Sets)
-

Equipment and Instrument list with component descriptions

Electrical component parts list with descriptions, if applicable

Spare parts list with appropriate identification nos., if any

Change parts list with appropriate identification nos., if any

4.4 Factory Acceptance Test Certificates (3 Sets)


-

Detailed list of modifications after contract &/or in final approved design

Material specifications and test certificates, if applicable

Instrument Calibration certificates


Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/
vacuum holds, etc.)

File Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO
-

Warranty certificates

Surface finish test reports

Food grade material certificate

REVISION NO

00

PAGE NO.

PAGE 6 OF 14

M - 00- D 04

4.5 Site Acceptance Test (3 Sets)


-

Operational Qualification Protocol

5.0 PACKING
Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be
wrapped in polythene sheets before putting in cases and it shall be ensured that damage to the
equipment does not occur during handling/transportation. Lifting hooks shall be provided for
unloading at site.
6.0 SPARES
Commissioning Spares The vendors shall include in the quoted price sufficient quantities of commissioning spares
required for erection and commissioning of the equipment. These shall include such items as
Bolts and other miscellaneous parts.
Essential Spares The vendor shall supply spares required for two years trouble free operation & furnish list of
spare considered with offer.

7.0 DATASHEET

Sr.

DESIGN PARAMETERS

No.
1

File Location

REQUIRED SPECIFICATIONS

Automation

Screwed type, Air cooled, Lubricated air compressor


and Inbuilt air receiver
(This Compressed air system is required for Breathing
air purpose)
Microprocessor controlled

Tag no.

AC-101

Capacity

50 CFM

Discharge pressure (Bar)

3 bar

Type

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 7 OF 14

DESIGN PARAMETERS

No.

Quantity
Design pressure (kg/cm (g))

REQUIRED SPECIFICATIONS
1 nos.
Vendor to specify

Design temperature (oC)

Vendor to specify

Capacity control

0 50 - 100% (3 steps minimum)/ Stepless

Out let air temperature

NMT 40 oC
Oil Free

Outlet air quality

Dust free
As per IS-8573

Particle size in microns

90% less than 10

Particle density in mg/m3

0.6

Water content in mg/m3

Vendor to specify

Residual oil content in mg/m3

NIL
To be supplied by vendor

First lot of oil


Grade & Quantity Vendor to specify
Drive

Belt Driven
Screw Air Compressor: Manufacturers Standard /

Design code

ISO 8573-1
Shell and tube heat exchanger: TEMA
Process and Utility piping: ANSI B 31.3
Terminal flanges as per ANSI B 16.5 ASA 150#
Design of pressure vessels: ASME Sec. VIII, Div. I
Guards for rotating parts: (IS: 7155)
Earthing: (IS: 3043)

File Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

M - 00- D 04

DESIGN PARAMETERS

No.

REVISION NO

00

PAGE NO.

PAGE 8 OF 14

REQUIRED SPECIFICATIONS
Test for acceptance of positive Displacement
compressor: BS-1571 PART II 1995 (ISO-1217)

Noise operating level

Not exceeding 80 db (A) at 1.00 meter distance from


unit in free field
Unit shall be Factory assembled, single piece as
package type consisting of compressors/ motor/ after

Skid

cooler / inter connecting piping, lubricating system,


microprocessor control system and all necessary
accessories

Compressor & motor mounting

Anti vibration mountings to be supplied by vendor


Exposed metal surface shall be painted with air dry

Painting

beige colour direct to metal single component paint


prior to shipment

Model

File Location

Vendor to specify

Compressor
Type of Compressor

Screw type, Air cooled and Lubricated air compressor

Nos. of Stage

Vendor to specify

Capacity control type

Vendor to specify

Compressor speed

Vendor to specify

End Seal : Type / Make

Vendor to specify

Suction filter, Type & Rating

Vendor to specify

Make

Vendor to specify

Model

Vendor to specify

Duty

Continuous

In built safety valve

To be provided

Suction filter, Type & Rating

To be provided

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

REVISION NO

00

PAGE NO.

PAGE 9 OF 14

M - 00- D 04

DESIGN PARAMETERS

No.

REQUIRED SPECIFICATIONS

Nozzles

File Location

Air inlet

To be provided

Air outlet

To be provided

Oil top up

To be provided

Oil drain

To be provided

Oil pressure gauge & Pressure switch

To be provided

Instrument Air for capacity control

To be provided

Condensate drain

Vendor to provide one common drain on skid

Air for capacity control

To be provided

Motor
Type

TEFC sq. cage, Induction Motor

Available power

415 V / 3 phase + N / 50 Hz /AC

RPM

Vendor to specify

H.P.

Vendor to specify

Insulation

F Class

Make of motor

Crompton / Siemens/BB

Drive
Type

Direct Drive

Gear type & MOC

Vendor to specify

Cooler
Type

Air cooled

Radiator

Vendor to specify

Heat transfer area radiator (m2)

Vendor to specify

MOC

Vendor to specify

Pressure drop (mm WC)

Vendor to specify

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

00

PAGE NO.

PAGE 10 OF 14

M - 00- D 04

DESIGN PARAMETERS

No.

Pressure gauges with isolation cocks

REVISION NO

REQUIRED SPECIFICATIONS
To be provided

Moisture separator
Type

Baffled

MOC

IS 2062&IS 1239

Make

Vendor to specify

Drain with automatic drain valve

To be provided

Nozzles
Air inlet

To be provided

Air outlet

To be provided

Drain with automatic drain valve

To be provided

AIR DRYER

Not required

AIR RECEIVER

INBUILT

Operating pressure

7-10 kg/cm2

Design pressure

Vendor to specify

Design temperature

Vendor to specify

MOC

IS 2002 Gr II , Sand Blasted

Type

cylindrical with dished ends

Capacity

Vendor to specify

Quantity

1 No.

Shell thickness

Vendor to specify

L/D ratio

Vendor to specify

Type of dish end

Vendor to specify

Dish thickness

Vendor to specify

Accessories

File Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

M - 00- D 04

DESIGN PARAMETERS

No.

REVISION NO

00

PAGE NO.

PAGE 11 OF 14

REQUIRED SPECIFICATIONS

Pressure Gauge

To be provided

Safety Relief valve

To be provided

Auto drain trap

To be provided

Nozzles

Air inlet

To be provided

Air out let

To be provided

Tank pressure gauge

To be provided

Pressure transmitter

To be provided

Tank drain

To be provided

Safety valve

To be provided

FILTER
Suction filter
Pore size

20/10 Micron (Vendor to specify)

Final filter after air receiver

File Location

Pore size

2 set with bypass arrangement of Final Filters (PTFE)


after Air receiver:
1.0 Micron x 2No. and 0.1 micron x 2No. with bypass
arrangement (SS-304 housing).
Final Oil Removal Filter for Oil content removal upto
0.003 ppm.
Capacity: to suit compressor outlets
Operation Pressure: 7-10 kg/cm2 (g)
Note: All filters shall be provided with pressure
indicator & drain valve to remove the moisture.

MOC

Vendor to specify

Make

Vendor to specify

Nozzles

Size

Air inlet

Vendor to specify

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.
No.

10

11

12

File Location

M - 00- D 04

DESIGN PARAMETERS

REVISION NO

00

PAGE NO.

PAGE 12 OF 14

REQUIRED SPECIFICATIONS

Air outlet

Vendor to specify

Drain with automatic drain valve

Vendor to specify

INSTRUMENTATION
Vacuum gauge for suction filter

To be provided

Oil pressure indicator

To be provided

Oil pressure transmitter

To be provided

Compressor outlet temperature

To be provided

Cooler outlet air temperature indicator

To be provided

Inlet Air Pressure

To be provided

Outlet Air Pressure

To be provided

Ammeter

To be provided

Volt meter

To be provided

Hour meter

To be provided

Safety interlocks / protection


Low oil pressure

To be provided

Low water flow

To be provided

High discharge air temperature

To be provided

High pressure in tank

To be provided

Over load protection

To be provided

Low voltage protection

To be provided

Single phase protection

To be provided

ACCESSORIES
Non return valve for compressor
discharge

To be provided

Salient enclosure

To be provided

Motor base frame (adjustable)

To be provided

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.

DESIGN PARAMETERS

No.

13

M - 00- D 04

00

PAGE NO.

PAGE 13 OF 14

REQUIRED SPECIFICATIONS

Belt guard

To be provided

Dry suction air filter cum silencer

To be provided

Lube oil pressure gauge

To be provided

Temperature sensor

To be provided

Piping within skid

To be provided

Power cabling within skid

To be provided

Control cabling within skid

To be provided

Anti vibration mount

To be provided

Foundation Bolts

To be provided

POWER CUM CONTROL PANEL

Components

Functions

File Location

REVISION NO

Microprocessor

Power and control circuit terminal blocks

ON/OFF control switch

Replaceable solid-state relay panel

Diagnostic display panel on unit

Audio visual alarm

Automatic unloading

Safety interlocks / Protection

Temperature indication

Pressure indication

Fault indication

Alarm (Audio Visual both)

Display

Required, details by vendor

MOC

Powder coated CRCA sheet

Body Thickness

2 mm thick

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
AIR COMPRESSOR ( 50 CFM)
21113

PROJECT NO
DOCUMENT NO

Sr.
No.

14

File Location

M - 00- D 04

REVISION NO

00

PAGE NO.

PAGE 14 OF 14

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Gland Plate

3 mm thick

Base Frame

Required

Mounting

On skid

DIMENSION & WEIGHT


Operating / Shipping weight
compressor skid with all components

Vendor to specify

Dimensions

Vendor to specify

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Air
System\21113 M-00-D04 URS AIR COMPRESSOR ( 50 CFM) -R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

Das könnte Ihnen auch gefallen