ANNEXURE-I
STATUS OF AVAILABILITY OF LAND FOR THE PROPOSED CENTRES AS
ON 15.9.2011
Name of Capacit
State
y in MT
Assam
290000
No. of
projec
ts
identi
fied
Land
identified
/Site
inspected/ yet to
be handed over
by State Govt.
(No.
of
Centres/Capacity
)
Land yet to be
identified
by
State Govt. (No.
of
Centres/Capacity
)
12 01/50,000
09/1,85,000
02/55,000
(Changsari existing
(Kokrajhar
(Nowgaon,
Ph.I Bongaigaon)
complex)
Dibrugarh,
Karimganj,
Fakrigram,
Nowgaon
Ph.II,
Tejpur, Salchapra,
Barpeta Road. &
Junai)
&
Arunach
al
Pradesh
20280
10 08/16,940(East
Kameng,/
West
Kameng/
Upper
Siang/Lower
Subansiri/ Anjaw /
Lohit
/Lower
Dibang
Valley/&
Anini)
02/3,340 (Tawang
& / West Siang)
Manipur
35000
06
02/5,000
(Chandel,
Thoubal,)
Meghala
ya
32500
03
Mizoram
20000
02
01/10,000
(Bhairabi)
01/10,000
(Sairang)
Nagalan
d
10000
01
01/10,000
Dimapur,
Sikkim
10000
01
01/10,000( Rangpo
o)
Tripura
45000
04
04/30,000
(East
Imphal, Bishnupur,
Jiribam Ph.II and
Tamenlong)
2|Page
Santi
and
Ambasa)
Total :
4,62,78
0
39
09/66,940
17/2,42,500
13/1,53,340
TOTAL CAPACITY
ONGOING + PROPOSED
=
5,40,280MT
(72,500 + 4,62,780 + 5,000 AT HAILAKANDI COMPLETED IN MARCH
2011)
Annexure-II
STATE-WISE DETAILS OF FUNDS RELEASED BY THE GOVERNMENT IN
THE XI PLAN TO N.E STATES and JAMMU & KASHMIR FOR CREATION
OF INTERMEDIATE STORAGE
State/Centre
JAMMU & KASHMIR
Lethpora
Sub Total
ASSAM
Amingaon
Sub Total
MIZORAM
Champhai
Serchib
Sub Total
Lunglei
Aibawk
Mamit
Sub Total
Saitual
Kawlkulh
Lungdai
Hliappui
Sakawrdai
Tlabung
Lungsen
N. Vanlaiphai
Lungdai
Khawzawal
Biate
Tuidam
Hnahthial
Capacity in
MT
Estimated cost
( Rs.in lakhs)
6160
6160
341.00
341.00
Funds released
(Rs.in lakhs)
341.00
341.00
343.00
4000
3000
3000
6000
1000
500
500
2000
1000
1000
500
500
500
500
500
500
500
500
500
500
500
348.00
348.00
186.00
100.00
965.00
596.00
3|Page
Bungtlang
Chhipphir
Kawlchaw
Sangau
Sub Total
SIKKIM
Gyalshing
Sub Total
500
500
500
500
9500
375
375
115.00
60.00
4|Page
1000
1000
500
500
1000
4000
1000
500
500
1000
1000
1000
1000
1000
1000
8000
198.00
198.00
386.00
386.00
2500
2000
4500
200.72
200.72
640
640
640
640
266.78
267.00
314.32
133.00
179.00
71.00
ARUNACHAL PRADESH
Kibithoo/ Anjaw
Sagalee/Papum Pare
Zimithang/ Tawang
Koloriang/KurungKu
mei
SubTotal
Meboo/East
Siang
Pasighat
Boleng / East Siang
Pasighat
Passighat/
East
Siang Pasighat
Tuting/Upper Siang
Vingkiong
Sub Total
Khonsa
Deomali
Pongchu
Sub Total
2560
640
640
1280
640
3200
640
640
640
1920
5|Page
Grand Total
2.
52215
3917.37
3043.72
2012-13
2013-14
2014-15
Centr
NE States (Rs. Crore)
e (Rs.
Crore)
Centre
Stat Total
share
e
shar
e
1.27
160.27 17.8 178.08
1
1.01
183.10 20.3 203.45
5
1.01
60.81
6.75 67.56
Centre
share
State
share
Total
426.53
426.53
853.06
487.30
487.3
974.59
161.83
161.83
323.65
6|Page
2015-16
2016-17
1.06
1.06
63.21
75.35
Total
5.41
542.74
7.02
8.37
60.3
0
70.23
83.72
603.0
3
168.21
200.52
1444.39
168.21
200.52
1444.3
9
336.43
401.04
2888.7
7
3.
7|Page
8|Page
3(b)
TPDS
AND
2009-10
2010-11
2011-12
100.00
28.00
60.00
27.00
28.00
60.00
26.68
63.04
---*
26.68 %
225 %
---
Based on the funds released to States during the 11 th Five Year Plan
under this scheme, there is a requirement of about 100 lakhs to be released
as 2nd instalment on submission of Utilisation Certificates by the States.
OUTLAY FOR THE 12TH FIVE YEAR PLAN (2012-2017) FOR THIS
COMPONENT UNDER THE PLAN SCHEME ON STRENGTHENING OF
PDSConsidering that there is need to create awareness of the entitlements
and other features of the proposed National Food Security Act, which is likely
to be implemented in the 12 th Plan, it is proposed that a higher outlay of Rs.
7.5 crore be provided for the 12th Plan as per the details given below:(Rs. in lakhs)
Financial Year
OUTLAY
2012-13
200
2013-14
200
2014-15
150
2015-16
100
2016-17
100
Total outlay
750
Note : Of the total amount proposed above in the annual Plans as well as
the entire 12th Plan period, 10% of the provision, as per mandatory
requirement will be earmarked for North Eastern States and remaining 90%
funds are proposed to be earmarked for other States.
BE 2012-13 for this component is Rs.65.00 lakh
3(c) PDS-Evaluation,
Services
Monitoring
&
Research-Professional
3(d)
TPDS-Training
10 | P a g e
11 | P a g e
4.
NSI Kanpur
The National Sugar Institute, Kanpur is one of the premier Institutes
running Post-Graduate Level Courses in the discipline of Sugar Technology,
Sugar Engineering, Alcohol Technology, and also provides operative level
training in Sugar Boiling Certificate Courses, Sugar Engineering Certificate
Courses, Pre-harvest Cane Maturity Survey Certificate Courses. The
expenditure under plan head is done by NSI, Kanpur for development of
infrastructural facilities and augmentation of R&D facilities. The outlay for
the 11th Five Year Plan in respect of NSI was Rs.750 lakhs, out of which
expenditure incurred till 2010-11 was Rs. 438.22 lakhs. The BE for 2011-12
is Rs.155 lakhs.
NSI has proposed an outlay of Rs.390 lakhs for the 12th Five Year Plan.
BE for 2012-13 for this scheme is Rs.0.75 crores.
12 | P a g e
5.
5(b)
5(c) E-governance
Department has been playing pioneering role in propagating IT based
development, facilitating rapid growth and transformation in the ICT culture
for efficient and effective delivery of services. Department is constantly in
the pursuit of developing/Implementing state of-the-art application software
related to various areas of importance. It has also undertaken various
projects related to capacity building and also follows Central Government eGovernance action plan. Till now an expenditure of Rs. 1.63 crore has
already been done on various ICT initiate during the 11 th Plan period some of
which are as follows:
1.
Training to Staf
2.
File Tracking System
3.
Payroll Software
4.
E-Granthalaya the Library Management System
5.
Parliament Matters Management System
6.
RTI Request and Appeal Management Information System
7.
Re-designing of web site
8.
New LAN System
9.
E-Office
10. Court Case monitoring System
11. Hardware Complaints Monitoring System
12. Purchase of new computers.
It is therefore, proposed that keeping in view the total likely
expenditure of Rs. 1.86 crore for 11 th plan period we may request Plan
Division to seek approval of competent authority for allocation of Rs. 3.00
core for the e-governance scheme for 12 th plan period. Here it also
mentioned that keeping in view of the initiative of the Government for
increased use of e-governance tools in the functioning of the Department
the proposed allocation of Rs.3 crore can be utilized during the 12 th Plan
period of following items.
I) Purchase of new computers, Laptop and iPad
II) Development of software for various operations of the Department
III) Continuous up gradation of IT infrastructure of the Department during
the 12 the plan period.
IV) Implementation of NeGP and other initiative which has been taken or
likely to be during the Plan period.
14 | P a g e
15 | P a g e
Total
30.11.2011.
(crore)
6.
18 | P a g e
7.
19 | P a g e
Appeals
Offences and Penalties
Regulation of warehousing business:
regulations under section 51 of the Act. The first meeting of the warehousing
advisory committee was held on 01.02.2011.
2.
Drafting of Warehousing Regulations: The Authority has drafted
the following eight Regulations:
(i) Warehousing Development and Regulatory Authority (Negotiable
Warehouse Receipt) Regulations, 2011.
(ii) Warehousing Development and Regulatory Authority (Warehouse
Accreditation) Regulations, 2011.
(iii) Warehousing Development and Regulatory Authority (Registration of
Accreditation Agency) Regulations, 2011.
(iv) The Warehousing Development and Regulatory Authority (Disputes)
Regulations, 2011.
(v) The Warehousing Development and Regulatory Authority (Meetings)
Regulations, 2011.
(vi) The Warehousing Development and Regulatory Authority (Records &
Reports) Regulations, 2011.
(vii) The Warehousing Development and Regulatory Authority (Grading,
Sampling and Weighing) Regulations, 2011.
(viii) The Warehousing Development and Regulatory Authority (Salary,
allowances and other terms and conditions of services of the officers
and other employees of the Authority) Regulations, 2011.
(ix) The Warehousing Development and Regulatory Authority (Electronic
Warehouse Receipt) Regulations, 2011.
3.
Appointment of Accreditation Agencies: The Authority has
appointed following 5 Government and 4 private organisations as
accreditation agencies for the accreditation of warehouses:
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Name
of
the
Commodity
Wheat
Rice
Paddy
Jawar
Name
of
the
Commodity
Bajra
Barley
Maize
Ragi
Soyabean*
Mustard seed
Rapeseed
Groundnut
Groundnut (pods) bag
Whole pulses and split
pulses
Sunflower oilseed
milled pulses
Cotton bales*
Cotton seed
Jute bales*
Chillies*
Sr.
No.
21.
22.
23.
24.
Sr.
No.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
Name
of
Commodity
Tamarind seed
Cumin seed*
Castor seeds
Cashew kernel
Name
of
Commodity
Arecnut
Black pepper*
Coriander*
Fennel seeds*
Fenugreek seeds*
Guar gum*
Sesame seed
Horse gram
Isabgol*
Black gram (Flour)
35.
36.
37.
38.
39.
40
Coffee beans
Sago*
Turmeric*
Ball Copra
Cup Copra*
Cardamom*
the
the
22 | P a g e
23 | P a g e
24 | P a g e
New Schemes
8.
(iv)
28 | P a g e
(iii)
The quality control officers of the S&R Division also ensure that the
guidelines issued by the Government of India are strictly followed
by FCI and the State Governments at the time of procurement,
storage and distribution of foodgrains.
Lucknow
29 | P a g e
8.
Pune
30 | P a g e
31 | P a g e
32 | P a g e
(iv)
and (v) QCCs, Chandigarh and Jammu:
Presently QCC, New Delhi Hqrs. is looking after the States of NCT Delhi,
H.P., J&K, Punjab, Haryana, and Chandigarh U.T. apart from monitoring the
work of all field offices of QCCs. There is no separate Monitoring Cell in the
Ministry Hqrs. for coordination and monitoring the work of all QCC field
offices. The QCC, New Delhi henceforth will coordinate and monitor the
activities of all QCC field offices. The targeted field activities in respect of
States of Punjab, Haryana and Chandigarh UT will be looked after by QCC,
Chandigarh and in respect of States of J&K and H.P. by QCC, Jammu. FCI has
also a Regional Office each at Chandigarh and Jammu under Zonal Office
(North) Noida. Inspection activities in respect of NCT Delhi will be looked
after by QCC, New Delhi itself apart from coordination and monitoring the
work of QCC field offices and country-wide investigation of complaints as
also surprise super inspections, etc.
(vi)
QCC, Jaipur
Presently QCC, Bhopal is looking after the States of Madhya Pradesh,
Chhattisgarh and Rajasthan. Both Madhya Pradesh and Chhattisgarh are
major procuring States under decentralized procurement scheme having a
vast area, which require special attention. Rajasthan is also a major
procuring State. FCI has also a Regional Office at Jaipur under Zonal Office
(North), Noida. So there is a need to open QCC office at Jaipur for Rajasthan.
As Madhya Pradesh and Chhattisgarh are major procuring States having
decentralized procurement, they need independent QCC office at Bhopal.
(vii) QCC, Chennai
Presently QCC, Hyderabad is looking after the States of Andhra
Pradesh, Tamil Nadu and Puducherry. Andhra Pradesh is a major procuring
State having the highest procurement of rice under Central Pool. Every year
due to natural calamity, requests for relaxations in specifications of
paddy/rice are received from one or other parts of the State and QCC
officers have to collect samples from affected areas in association with FCI
and State Government, based on which relaxations are decided. Tamil Nadu
is also a major procuring State and is working under decentralized
procurement scheme. In Tamil Nadu also, there are recurring problems of
quality of foodgrains due to unseasonal rains for which requests are received
for relaxations in specifications. There is need to have a full fledged QCC at
Chennai. FCI has also its Zonal and Regional Offices at Chennai.
33 | P a g e
Staf strength:
The proposed staff strength in the above-mentioned new Quality
Control Cells
S.
N
o.
1.
Guwaha
ti
Patn
a
Chandiga
rh
Jamm
u
Jaipu
r
Chenn
ai
Ahmedab
ad
Tota
l
14
21
14
7.
Dy.
Director
Asstt.
Director
Tech.
Officer/
Tech.
Assistant
Lab.
Assistant
Tech.
Operator/
Lab
Attendant
Jr.
Accountan
t
LDC
8.
Steno
9.
Driver
10
.
Multitaski
ng staff
Total
21
16
16
16
16
16
16
16
112
2.
3.
4.
5.
6.
Posts
(B)
Assistant
Director(S&R
)
Technical
Officer (S&R)
Lab.
Attendant
Total
Hapu
r
IGMRI
Total
Ludhian Hyderaba
a
d
15
27
35 | P a g e
BUDGETARY PROVISION:
Total requirement would be Rs. 59.43 crores for the 12 th Five Year Plan.
The details are as under:
S.
N
o.
1.
2.
3.
4.
5.
6.
Name
QCC
S.
N
o.
7.
Name
of Anticipated budgetary requirement for Total
QCC
12th Five Year Plan
Ahmedaba
60.82 121.46
122.22 134.03 146.45 584.98
d
Total
425.74 850.02
855.54 938.21 1025.1 4094.8
5
6
(a) Opening of new Quality Control Cells: Presently, there is no Plan
Scheme under S&R Division. The total anticipated budgetary requirement for
running the quality control scheme with these seven QCCs will be
approximately Rs. 40.95 crores for the 12 th Five Year Plan.
Annual
requirement for each office would be as under:
(Rs in lakhs)
(b) IGMRI, Hapur and its field stations located at Ludhiana and
Hyderabad: The anticipated budgetary requirement for creating modern
Physical analysis facilities and additional facilities of pesticide residue and
mycotoxin contamination analysis of foodgrains at IGMRI, Hapur and its field
stations at Ludhiana and Hyderabad will be approximately Rs.8.16 crores
(Non-recurring) and for additional manpower required for above chemical
analysis will be approximately Rs. 5.32 crores (recurring) for the 12 th Five
Year Plan. Annual requirement for each office would be as under:
(Rs in lakhs)
Sr. Name of Anticipated budgetary requirement for 12th Total
No IGMRI
Five Year Plan
2012 2013 -14
2014 2015 2016
.
office
Recurri Non- 13
- 15
- 16
- 17
ng
recurri
ng
1. Hapur
12.9 35.50
272.00
39.00 42.90 47.20 449.50
0
2. Ludhiana 12.9 35.50
272.00
39.00 42.90 47.20 449.50
0
3. Hyderab 12.9 35.50
272.00
39.00 42.90 47.20 449.50
ad
0
Total
38.7 106.50
816.00 117.0 128.7 141.6 1348.
0
0
0
0
50
(c) Capacity Building: The anticipated budgetary requirement for
training programmes will be Rs. 1.00 crore per year and Rs. 5.00 crores for
the 12th Five Year Plan period.
Total Requirements for 12th Five Year Plan for opening of new
Quality Control Cells, upgradation of IGMRI & its field stations and
for capacity building will be Rs. 59.43 Crores.
37 | P a g e
38 | P a g e
Annexure I
ALL INDIA QUALITY CONTROL STAFF POSITION OF FCI AS ON 30.06.2011
39 | P a g e
CATEGORY-I
Place
Headquarters, New
Delhi
ZO, Noida
RO, Delhi
Nort RO, J&K
h RO, HP
RO, Punjab
Z
o RO, Haryana
n RO,
Uttrakhan
e
d
RO, UP
RO, Rajasthan
East ZO, Kolkata
Z RO, WB
o RO, Orissa
n RO, Bihar
e RO, Jharkhand
Sout ZO, Chennai
h RO, AP
RO, Tamil
Z
Nadu
o RO, Karnatka
n
e RO, Kerala
ZO, Mumbai
Wes RO,
Maharash
t
tra
Z RO, Gujarat
o RO, MP
n RO,
e
Chhattisg
arh
Nort ZO, Guwahati
h RO, Assam
RO, N&M
E RO, NEF
a RO, Arunachal
s
Pradesh
CATEGORY-II
AGM(QC)
M (QC)
CATEGORY-III
TA Gr I
CATEGORY-IV
TA Gr II
TA Gr III
Picker
D. Operator
SS
IP
SS
IP
SS
IP
SS
IP
SS
IP
SS
IP
SS
IP
8
4
2
2
2
16
7
5
0
0
0
0
15
5
15
29
20
10
4
218
86
29
13
26
28
11
265
106
5
48
30
16
9
384
169
2
4
5
3
1
137
39
5
49
30
16
9
384
169
0
0
0
1
0
84
4
6
65
42
22
12
512
228
9
5
29
14
10
312
126
2
0
17
6
2
210
89
4
1
18
4
0
155
13
3
1
25
11
2
316
134
0
1
12
11
2
394
111
3
11
5
3
11
8
7
2
3
15
0
4
2
1
1
2
3
1
2
19
10
136
68
9
80
37
35
10
13
124
31
167
71
8
57
20
35
8
8
247
15
217
118
12
111
60
63
15
20
223
7
89
23
1
20
11
1
1
2
205
15
217
118
13
111
60
63
15
21
223
0
8
8
1
24
12
19
6
0
9
22
290
159
19
147
82
84
20
28
300
18
129
69
0
56
72
83
14
1
107
7
99
48
0
53
22
27
5
0
101
11
118
51
2
69
28
56
2
2
142
10
148
72
1
79
33
40
7
1
152
14
299
118
2
99
35
27
17
4
265
4
4
3
0
41
35
57
27
66
61
24
27
66
61
1
0
88
82
67
104
35
25
36
23
52
37
83
78
5
3
5
1
37
11
26
7
48
16
34
0
48
17
3
0
66
23
35
1
28
0
50
4
42
1
55
17
4
3
5
3
1
0
76
35
40
70
17
47
129
49
71
27
29
23
129
49
71
2
2
1
173
67
96
95
21
42
64
25
27
84
56
22
96
38
40
51
18
45
5
2
6
2
3
4
3
0
1
1
1
0
41
3
24
6
7
5
45
4
38
9
15
5
71
3
34
7
11
9
22
1
2
2
1
0
71
4
34
7
11
9
0
0
1
0
0
1
95
5
47
11
15
12
35
2
17
7
7
8
32
0
17
2
5
0
13
0
29
0
5
1
49
1
26
4
7
4
32
6
74
14
25
2
40 | P a g e
t
Z
Total
159
79
1265
1497
2090
743
2095
187
2818
1495
948
999
1432
1911
Annexure-II
Staff Strength in Quality Control Cells
Sl
.
N
o
1
Name
of Post
Delhi
V S
In
Hyderaba
d
V S
In V
Bangalor Bhubanesh
e
war
S
In V S
In
V
Bhopal
Pune
Total
1
3
17
16
24
2
2
2
Deputy
Director
Assistant
Director
Tech
Officer
Tech
Asst
Lab Asst
JASK
Steno
LDC
Driver
10
Tech
Operator
.
16
1
4
3
4
Lucknow
I
n
1
Kolkata
In
V S
In
V S
In
I
n
-
41 | P a g e
11
Peon/
watchma
n
Total
14
1
2
1
4
1
7
1
4
17
1
0
1
7
1
3
17
14
1
7
1
7
1
1
1
7
1
4
13
3
9
3
4
0
(As on 30.9.2011)
42 | P a g e
Annexure-III
List of equipments required for Physical and Chemical analysis of food
grains
Sr.
Name of Equipment
Purpose
Approx.
No
Cost
.
(Rs.in lakh)
1.
Electronic
Balance
Max. For weighing of food
1.50
Capacity 500 gm. (Least Count grains samples
0.001 gm.)
2.
Flexible
arm
illuminated For
examining
the
0.20
magnifier (four)@ Rs.5000/-per refractions
and
grain
pc.
characteristics such as
pin point rice grains,
discoloured
and
red
grains etc.
3.
Hecto liter Weight Apparatus For
determination
of
0.15
with sample Pan, Strocker and Hecto liter weight of
weighing balance capacity One wheat
kg. Least Count 100mg. Brass
made.
4.
Grain Sampler
For
drawing
grain
0.10
Slotted tube Bulk sampler
samples from Bulk
5.
0.04
6.
0.20
7.
8.
9.
5.00
0.20
15.0
43 | P a g e
Sr.
No
.
10.
11.
12.
13.
14.
15.
16.
Name of Equipment
Purpose
Approx.
Cost
(Rs.in lakh)
3.00
Additional spares.
0.25
1.50
1.50
0.05
0.12
10.00
10.00
44 | P a g e
Sr.
No
.
Name of Equipment
Purpose
30.
Approx.
Cost
(Rs.in lakh)
2.00
1.50
0.50
1.00
0.50
15.00
1.55
20.0
1.50
0.27
0.10
0.50
5.00
0.15
45 | P a g e
Sr.
No
.
Name of Equipment
31.
32.
Commercial
scale
purification system
Total
Purpose
lab.
For removal of toxic
fumes and gases
water To get potable water for
all purposes
Approx.
Cost
(Rs.in lakh)
0.75
0.40
99.53
46 | P a g e
Annexure IV
List of the equipments required for Pesticide residue analysis of food
grains
Sr.
Name of Equipment
Purpose
Approx.
No
cost
.
(Rs.in lakh)
1
Oil bath with stirrer
For evaporating solvents
0.35
2.
Heavy Duty Mixer Grinder
For mixing and grinding the
grain samples.
3.
Gas Chromatography-Mass For Pesticidal residue , pH,
75.00
Spectroscopy GC MS MS
total acidity and total sugar
4.
Rotary vacuum evaporator
For evaporating the solvent
0.60
from
pesticide
residue
extracts.
5.
High velocity centrifuge For analysis of pesticide
1.00
machine
residue.
6.
Vacuum Pump
For staining sample extract
0.20
7.
Accelerated
Solvent Fully automatic extraction
33.0
Extraction (ASE) (Automatic system for preparation of
System).
analysis grade samples.
8.
Ultra
pure
water It is to obtain pure water for
4.00
purification
system
for sample
preparations
in
18.2 Mega Ohm resistivity mycotoxins and pesticidal
pure water
residue detection.
9.
Refrigerator
TOTAL
For keeping
reagents
samples
and
0.30
114.45
47 | P a g e
Annexure V
List of the equipments required for Mycotoxin analysis of food grains
Sr.
No
.
1.
2.
3.
4.
5.
6.
7.
Name of Equipment
Purpose
Approx. cost
(Rs. in lakh)
0.30
0.20
0.25
1.50
25.0
2.50
2.50
48 | P a g e
Sr.
No
.
8.
9.
10
.
11
.
12
.
13
.
14
.
15
.
Name of Equipment
Purpose
bacteria
pH Meter
Determination of pH
Colony Counter
For counting of microbes
ELISA Reader
Determination of fungi /
mycotoxin
Binocular Microscope
For
microscopic
inspection of fungi /
bacteria
Phase
Contrast
For
microscopic
Microscope
with inspection of fungi /
accessories
bacteria with precision
Centrifuge
For separation of sample
extracts.
Refrigerator with minus For keeping extracts /
20o C Temperature.
reagents.
Autoclave
For
heating
under
controlled pressure
Total
Approx. cost
(Rs. in lakh)
0.50
1.50
5.00
1.50
7.00
7.50
1.00
1.50
57.75
49 | P a g e
9.
5.
For proper and scientific storage of PDS commodities, Government of
Chhattisgarh has taken up a scheme for the construction of 25 MT capacity
FPS-cum-godowns in the Panchayat buildings during the year 2006-07 at a cost
fixed at Rs. 1 lakh for each FPS-cum-godown. Thereafter, the capacity of the
FPS-cum-godown has been revised to 35 MT and the cost enhanced to Rs. 2
lakh. At present, construction of 3388 FPS-cum-godowns in rural areas is
reported to have been completed and construction of another 1794 FPS-cumgodowns is in progress. For construction of these FPS-cum-godowns in rural
areas, funds of Backward Region Grant Funds (BRGF) and the 12 th Finance
Commission are being used by the State Government. Government of
Chhattisgarh has also started scheme for construction of minimum 50 MT
capacity FPS-cum-godown in the urban areas of the State in 2011-12. Cost of
each FPS-cum-godown has been fixed at Rs.10 lakh. In 2011-12, construction of
50 FPS-cum-godowns is being done in Raipur City.
6.
Several initiatives are being taken for creation of warehousing
infrastructure by the Central Government as well as State Governments. In
addition to the assistance being taken by the States like Chhattisgarh through
BRGF or 12th Finance Commission funds, a Rural Godown Scheme is being
operated by the Department of Agriculture for construction/renovation of rural
godowns. A Rural Infrastructure Development Fund (RIDF) for supporting the
creation of warehousing infrastructure for intermediary storage is also being
implemented by the National Bank for Agriculture & Rural Development
(NABARD).
7.
Keeping in view the need for scientific storage capacity at the FPS level, a
Plan Scheme for creation of FPS-cum-godowns in States/UTs is proposed to be
implemented in the 12th Five Year Plan. The details of the proposed Plan
scheme for creation of FPS-cum-godowns in the State/UTs are given as follows:i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
8.
The total requirement for the proposed scheme for 12 th Five Year Plan is
estimated at Rs. 506.21 crore, details of which are as under:i)
ii)
54 | P a g e
ANNEXURE-A
To achieve the main objectives of scientific storage the Central
Warehousing Corporation has laid-down a regular drill and has prescribed a
code of practices as detailed below:
55 | P a g e
S.N
o.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Annexure-B
STATEMENT INDICATING STATE-WISE NO. OF FAIR PRICE SHOPS AND
PROPOSED FPS-CUM-GODOWNS
Name
of No. of existing Fair Maximum
No.
of
State/UT
Price
Shops
in proposed
FPS-cumStates/UTs
(as godowns in States /UTs
reported by them ( @ 10% of FPSs )
upto 31.8.2011)
Andhra Pradesh
43615
4362
Arunachal Pradesh
1568
157
Assam
34053
3405
Bihar
44480
4448
Chattisgarh
10400
1040
Delhi
2508
251
Goa
501
50
Gujarat
16662
1666
Haryana
9369
937
Himachal Pradesh
4404
440
Jammu & Kashmir
5772
577
Jharkhand
14395
1440
Karnataka
20487
2049
Kerala
14248
1425
Madhya Pradesh
20688
2069
Maharashtra
50555
5056
Manipur
2551
255
Meghalaya
4110
411
Mizoram
1244
124
Nagaland
259
26
Orissa
28744
2874
Punjab
14348
1435
Rajasthan
22830
2283
Sikkim
1414
141
Tamil Nadu
32265
3227
Tripura
1586
159
Uttar Pradesh
73004
7300
Uttarakhand
8713
871
West Bengal
20260
2026
Andaman &
481
48
Nicobar Islands
Chandigarh
22
2
Dadra & Nagar
77
8
Haveli
Daman & Diu
51
5
Lakshadweep
36
4
56 | P a g e
35
Puducherry
TOTAL
498
506198
50
50621
Components of Expenditure
Construction of Building
Central Govt. assistance for building purposes would be for construction
of a built up area of 20,000 square feet. Central Assistance would be given at
the rate of Rs. 2,000 per sq. feet, implying thereby a total cost of Rs. 4.0 crore.
This is only an indicative estimate and actual cost will depend on the relevant
prevailing rate of construction. This does not include cost of land. Ministry of
Urban Development will be requested to allot suitable land for construction of
the building for National Food Commission.
B.
Assistance for non-building assets:
Requirement towards non-building assets such as Air Conditioners,
furniture, office equipment, computers etc is estimated at Rs. 88.84 lakh.
C.
Salary, Allowances and other office expenses
As per the NFSB, the National Food Commission will consist of a
Chairperson, five other Members and a Member Secretary. The Central
Government is required to provide for the salary and allowances of
Chairperson, other Members and Member Secretary and support staff and
other administrative expenses, required for proper functioning of the National
Commission. Annual expenditure on salary and allowances, office expenses,
local transport and other recurring expenditure would be about 5.0 crore.
3.
1
2
3
Construction of building of
National
Food Commission
(excluding cost of land)
Assistance for non-building
assets
Salary , Allowances and other
office expenses
Total
4.0
1.0
0.89
0.45
25.00
5.00
29.89
6.45
D.
E.
Financial Implication:
Total financial implication (non-recurring) on the proposed scheme is
estimated to be Rs 91.75 crore, as per following details:
Sl.
Item of Expenditure
Estimated Expenditure
No.
(Rs. in crore)
th
12 Plan
2012-13
1
Building of State Food
Commission
(a) Class A-1 cities (6; 18.00 (@3.0 crore
5.0
Hyderabad,
Delhi, each)
Bangalore,
Mumbai,
Chennai, Kolkata)
59 | P a g e
2.
(b)Difficult/hilly/less
24.75
(@
2.25
accessible areas (11 crore each)
States/UTs in receipt
of
Hill
Transport
Subsidy)
(c) Other State capitals
32.40 (@ 1.8 crore
for remaining 18
States/UTs)
Total
75.15
Non-building assistance
16.60
Grand Total
91.75
5.0