Lundin Norway AS
Incident and Near Miss Reporting and Investigation
Drilling Operations
LNAS-S-401
Revision
02
01
Prepared by:
B. Rudjord
B. Rudjord
Verified by:
J. Bysveen
J. Bysveen
Approved by:
T. Tinholt
T. Tinholt
Lundin Norway AS
LNAS-S-401
17th October 2008
Contents
1
General ................................................................................... 3
1.1
1.2
Objective ................................................................................................3
Responsibility .........................................................................................3
Revision Table
Rev. no.
02
01
Description of changes
Reformulation of
investigation team for red
category incidents
Page/Section
4
Page 2 of 5
Lundin Norway AS
LNAS-S-401
17th October 2008
General
1.1 Objective
This document describes the principles and requirements related to incident and
near miss investigation and follow-up in conjunction with drilling operations
operated by Lundin Norway AS (LNAS). The requirements will also apply for
other assets operated by LNAS.
1.2 Responsibility
The Project Manager has the overall responsibility that the requirements set out
in this document is implemented.
The HSEQ Manager has the responsibility to maintain and update this procedure.
The HSEQ Manager shall also ensure that relevant LNAS personnel are
nominated to assist in an investigation team. LNAS shall also have personnel
with sufficient training and experience to be able to lead an investigation if
required.
The lead drilling engineer assigned to the project shall ensure that the
requirements in this procedure is made known to relevant personnel and
adhered to during the drilling project.
For drilling and well operations where a Well Management Contractor (WMC) is
part of the drilling project, qualified personnel shall be nominated to assist in an
investigation.
The WMC shall maintain a register of all accidents and incidents reported during
the course of the project. A status of incidents and accidents shall be maintained
and a continuous measurement against the project HSE goals and relevant Key
Performance Indicators (KPI) shall be maintained throughout the project
execution.
Page 3 of 5
Lundin Norway AS
LNAS-S-401
17th October 2008
Onshore personnel
LNAS
Rig Owner
X
X
X
X
(x)
(x)
Offshore personnel
LNAS
Rig Owner
(x)
(x)
Page 4 of 5
Lundin Norway AS
LNAS-S-401
17th October 2008
For all incident investigations, the direct as well as the root causes will be
identified. Any corrective actions identified and agreed upon will be followed up
until closure
Even though an investigation team is not necessarily established after Yellow and
Green Category incidents/Near misses, one should attempt to establish the direct
and root causes and identify actions which could prevent recurrence.
Reference is made to the LNAS-S-501 Accident and Near Miss Reporting
Gudelines.
Link to Lundin Guidelines for Reporting Accidents and Near Misses: