Sie sind auf Seite 1von 10

Caroline's Eye

SL#

Semantics

Semantics

Semantics

4
5

Semantics
Semantics

Semantics

Semantics

Semantics

Semantics

10

Semantics

11

Semantics

12

Semantics

13

Semantics

14

Semantics

Type

15

Semantics

16

Semantics

17

Semantics

18

Semantics

19

Semantics

20

Semantics

21

Semantics

22

Semantics

23

Semantics

24

Semantics

25

Semantics

26

Semantics

27

Semantics

28

Semantics

29

Semantics

30

Semantics

31

Semantics

32

Semantics

33

Semantics

34

Semantics

35

Semantics

36

Semantics

37

Semantics

38

Semantics

39

Semantics

40

Semantics

41

Semantics

42

Semantics

43

Semantics

44

Semantics

45

Semantics

46

Semantics

47

Semantics

48

Semantics

49

Semantics

50

Semantics

Description
Always use IT Test Team not following
a) IT test team
b) IT Test team
c) IT test Team
It should always be < a Detailed Test Plan >
Within document don't write <above mentioned locations >
instead say <above locations > when you refer previous section
Don's write "working fine"..instead say "working as specified"
use article the before VAA
Wrong:
exit criteria to mark the application safe for deployment
Right:
exit criteria to mark confirm the application safe for deployment
Any activity that is done in the past or already completed should written in past tense
Statement "There may be changes in cost in case there are changes to timelines or
requirements> should be written as
<There may be changes in cost if there are changes to timelines or requirements>
If you want to mentioned some item / component will be existing prior to your work write in
following fashion
<application will be in existence prior to the start of testing by the IT Test Team>
DR Testing:
Wrong:
Creation and Execution of DR Plan for the Project to ensure that the application is fully
recoverable in the other Data Centre, if in case it goes down
Right:
Creation and Execution of DR Plan for the Project to ensure that the application is fully
recoverable in the other Data Centre, if it fails in the primary one
Wrong:
VAA Application users
VAA application users
VAA application Users
Right:
VAA Application Users
Wrong: Dont say Kick-In
1. which will need to be executed whenever the enhancement work for Phase kicks in
Right:
which will need to be executed when the enhancement work for Phase 2 is undertaken.
wrong: no details are laid by any document they should be in the document
access to the application as laid out by the VAA Blueprint.
Right:
access to the application as laid out in the VAA Blueprint.
Wrong:
shown in the below diagram:
Right:
shown in the diagram below:

Wrong:
errors has been detected
Right:
errors were detected
Wrong:
application went unresponsive
Right:
application became unresponsive
Wrong:
number of error cropped up during testing...
Right:
number of error occurred
Wrong:
but mid way of the test run it went beyond 85%.
Right:
but mid way through the test run it went beyond 85%.
Do not start a bulleted item / paragraph with "But"
Wrong:
an acceptance smoke test
Right:
an Acceptance Smoke Test
Wrong:
Browser compatibility test
Right:
Browser Compatibility Testing
Wrong:
Team will perform out Performance test
Right:
Team will carry out Performance Testing
Wrong:
The application would be available
Right:
The application will be available t
Wrong: Do not start any Paragraph with "Mentioned below are.."
Right: The list below
Wrong:
All defects will be captured and managed through QC
Right:
All defects will be captured and managed within QC
Wrong:
Below figure explains
Right:
The table below explains
Wrong:
The IT Test Team will perform the tests as mentioned in Section 4.2.1
Right:
The IT Test Team will perform the tests as outlined in Section 4.2.1

Wrong:
3rd Party Supplier (IBS) will be responsible
Right:
The 3rd Party Supplier (IBS) will be responsible

Wrong:
Testing of CMS Gantt and IOB was performed in ACC2 Environment. Accessed via citrix
Right:
Testing of CMS Gantt and IOB was performed in ACC2 Environment, accessed via citrix
Wrong:
by ITQA Testing
Right:
by the IT Test Team
Wrong:
ITQA
Right:
IT Test Team
Wrong:
ITQA Test Report
Right:
End Test Report
Wrong:
Following features included
Right:
The following feature included
Wrong:
by IT Test Team
Right:
by the IT Test Team
Wrong:
as it were released late
Right:
as it was released late
Wrong:
Application Users performed the relevant testing
Right:
The Application Users performed the relevant testing
Wrong:
iFlight Crew Portal (CWP) was tested using URL
Right:
The iFlight Crew Portal (CWP) was tested using the URL
Wrong:
from Cognizant network
Right:
from the Cognizant network

Wrong:
URL of IOB
Right:
The URL for IOB
Wrong:
Results of each cycle
Right:
The results for each cycle
Wrong:
Test Execution Results for each Cycle is given below
Right:
Test Execution Results for each Cycle are given below
Wrong:
Please use following details to view details in QC
Right:
Please use following details to view these details in QC
Wrong:
end of Drop 1 Cycle 1 is as below
Right:
end of Drop 1 Cycle 1 was as below
Wrong:
Following two Functional Test Cases were left in No Run status
Right:
Two Functional Test Cases were left with No Run status
Wrong:
were marked NA because of either not delivered of features expected
Right:
were marked NA because of either non delivery of features expected
Wrong:
because of open query/defect
Right:
because of open query/defects
Wrong:
Test Case Execution status and defects status at the end of Drop 1 Cycle 5 is as below
Right:
Test Case Execution status and defects status at the end of this final Drop 1 Cycle 5 is as below
Wrong:
in the Quality Centre
Right:
in Quality Centre
Wrong:
sent to Bussiness for clarification
Right:
sent to the application owners for clarification

Wrong:
Total 95 defects have been Opened/Reopened in Quality Centre
Right:
A Total of 95 defects have been Opened/Reopened in Quality Centre

Das könnte Ihnen auch gefallen