STANDARD OPERATION PROCEDURE

SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :

Rev : 0

Date :
24/09/2014

DAFTAR ISI / TABLE OF CONTENTS


I. Tujuan / Purpose of Document ...........................................................................2
II. Ruang Lingkup / Scope of Document .................................................................2
III. Definisi / Definition ............................................................................................ 2
IV. Referensi Dokumen / Referenced Document .....................................................2
V. Keselamatan Kerja / Safety ................................................................................ 2
VI. Tanggung jawab / Responsibilities......................................................................2
VII.Prosedur / Procedure.......................................................................................... 3
VIII...................................................................................... Diagram Alir / Flow chart
........................................................................................................................... 4
IX. Indikator Kinerja / Performance Indicator...........................................................5
X. Lampiran / Appendix.......................................................................................... 5

LEMBAR PENGESAHAN / APPROVAL SHEET


Re
v.
00

Notes

Prepared by

HSE Check by

Tanggal:
/
/
Hadi Kusnaryono
Rig Superintendent

Tanggal:
/
/
Bambang Kasiyanto
Head of QHSSE

Reviewed by

Approved by

Reviewed by

Dokumen awal.
Initial document.

Reviewed by

Tanggal:
/
/
Hariyono

Tanggal:
/
/
Estadi Budiatman

Dept. Head of ISP

Dept. Head of WIR

Tanggal:
/
/
Budhi N.
Pangaribuan
Div. Head of DOS

Tanggal:
/
/
Saptomudito
Sect. Head of HWU
& SL

Approved by

Tanggal:
/
/
Agus R. Sutiawan
Mgmt. Rep

Jika header tidak berwarna, maka dokumen ini tidak dikendalik


If header is in Black and White, this document(s) is Uncontrolled
Page 1 of 5

STANDARD OPERATION PROCEDURE


SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :

Rev : 0

Date :
24/09/2014

I. TUJUAN
Dokumen ini bertujuan untuk
menjelaskan
langkah-langkah
proses rig up snubbing unit/HWU
225K/340K
untuk
meyaknikan
keselamatan kerja bagi semua
personil yang terlibat.

I. PURPOSE OF THE DOCUMENT


The purpose of this document is to
explain step by step of rigging up
process
of
snubbing
unit/HWU
225K/340K to ensure safety for all
personnel involved.

II. RUANG LINGKUP


Prosedur
ini
berlaku
untuk
Snubbing Unit/HWU 225K/340K
model Hydra Rig di wilayah kerja
lepas pantai.

II. SCOPE OF DOCUMENT


This procedure is applicable to Hydra
Rig Snubbing Unit/HWU 225K/340K
on offshore working area

III. DEFINISI
SITP = Shut In Tubing Pressure
SICP = Shut In Casing Pressure
BPV = Back Pressure Valve
SCSSV
=
Surface
Controlled
Subsurface Safety Valve
BOP = Blow Out Preventer
IV. REFERENSI DOKUMEN
1. Hydra Rig user manual
2. Hydra Rig manufacture data
record
V. KESELAMATAN KERJA
Personil yang terlibat harus telah
memiliki
sertifikasi
pesawat
angkat
dari
lembaga
yang
berwenang.
Penggunaan alat pelindung diri
standar
diwajibkan
dalam
pekerjaan ini, ditambah dengan
alat pelindung diri untuk bekerja di
ketinggian.
Gunakan radio untuk komunikasi
yang efektif.

III. DEFINITION
SITP = Shut In Tubing Pressure
SICP = Shut In Casing Pressure
BPV = Back Pressure Valve
SCSSV
=
Surface
Controlled
Subsurface Safety Valve
BOP = Blow Out Prevente
IV. REFERENCED DOCUMENT
1. Hydra Rig user manual
2. Hydra Rig manufacture
record

data

V. SAFETY
All personnel involved should held
rigging certification from authorities.
Standard PPE should be used on this
job, with addition PPE for working at
height.
Use handy talkie for effective
communication.

VI. RESPONSIBILITIES

Jika header tidak berwarna, maka dokumen ini tidak dikendalik


If header is in Black and White, this document(s) is Uncontrolled
Page 2 of 5

STANDARD OPERATION PROCEDURE


SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :

Rev : 0

VI. TANGGUNG JAWAB


Operator bersama dengan asisten
operator
bertanggung
jawab
dalam memimpin kegiatan rig up
ini.
Roughneck bertanggung jawab
dalam membantu pekerjaan rig up
ini.
Supervisor dan Superintendent
bertanggung
jawab
dalam
mengawasi pekerjaan rig up ini.
VII.
PROSEDUR
1. Pastikan ijin kerja telah dibuat
dan telah disetujui oleh pemilik
otoritas lokasi kerja.
2. Yakinkan bahwa kondisi sumur
yang akan dikerjakan telah
terisolasi
dari
jalur
pipa
produksi.
3. Periksa dan catat tekanan
sumur SICP dan SITP.
4. Pastikan ball valve dan SCSSV
dalam keadaan terbuka.
5. Ablas tekanan casing dan
tubing ke atmosper.
6. Jika sumur masih bertekanan
lakukan pencatatan tekanan
alir sumur.
7. Lakukan pekerjaan mematikan
sumur.
8. Observasi
tekanan
sumur
selama 15 menit dan pastikan
sumur dalam kondisi tidak
bertekanan.
9. Ablas tekanan pada control line
untuk menutup SCSSV.
10.Pasang BPV di tubing hanger.
11.Bongkar wing valve dan choke
body, pasang blind flange pada
jalur pipa produksi permukaan.
12.Bongkar x-mastree.

Date :
24/09/2014

Operator
along
with
assistant
operator is responsible for leading
the rig up activities. Roughneck
responsible for assisting the the rig
up activities.
Supervisor and the Superintendent is
responsible for supervising the rig up
activities.
VII. PROCEDURE
1. Ensure the work permit has been
made and approved by the
authority of the work site.
2. Make sure that the condition of
wells that will be worked has been
isolated from the production
pipeline.
3. Check and record tubing and
casing pressure (SITP and SICP)
4. Open ball valve and SCSSV
5. Bleed off casing and tubing
pressure to atmosphere
6. If the well is still under pressure,
check and
record well flow
pressure
7. Perform killing well
8. Observe well pressure for 15
minutes and make sure the well
are
not
in
under
pressure
condition
9. Bleed off pressure on the control
line to close SCSSV
10.Set BPV on tubing hanger
11.Nipple down wing valve and choke
body, install the blind flange on
the surface of the production
pipeline.
12.Nipple down x-mastree
13.Install test plug according to the
type of tubing hanger installed
14.Nipple up mud cross on top of the
wellhead.
15.Nipple up BOP stack on top of mud
cross, BOP installation is according

Jika header tidak berwarna, maka dokumen ini tidak dikendalik


If header is in Black and White, this document(s) is Uncontrolled
Page 3 of 5

STANDARD OPERATION PROCEDURE


SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :

Rev : 0

13.Pasang test plug sesuai dengan


tipe
tubing
hanger
yang
terpasang.
14.Pasang mud cross di atas
wellhead.
15.Pasang BOP stack di atas mud
cross,
BOP
dipasang
disesuaikan dengan kondisi
jarak antar sumur di platform
tersebut, jika jarak antar sumur
tidak memungkinkan untuk
dipasang BOP langsung di atas
mud cross, maka dipasang riser
sampai ke top deck.
16.Lakukan uji kerja dan uji
tekanan pada blind ram
17.Pasang
window
lengkap
dengan window basket di atas
rangkaian
BOP,
amankan
dengan guide line
18.Pasang tangga ke window
19.Pasang Unit Jack 340K lengkap
dengan basketnya di atas
Window dan amankan dengan
guide line
20.Pasang work basket lengkap
dengan tong arm di atas jack,
amankan dengan guide line.
21.Pasang tangga rig sampai ke
work basket
22.Pasang gin pole pada alasnya
dan ikatkan ke work basket
23.Pasang semua selang hidrolik
dari power pack ke system
hidrolik unit rig 340K
24.Nyalakan power pack dan
lakukan scope out teleskopik
gin pole
25.Pasang emergency escape line
26.Lakukan uji fungsi rig setelah
100% rig up selesai
VIII.

Date :
24/09/2014

to the distance between wells on


the platform, if the distance
between wells is not allowed to be
installed directly on top of the BOP
mud cross, then mounted riser to
the top deck.
16.Perform function test and pressure
test on blind ram.
17.Rig up window complete with
window basket above BOP, secure
with guidelines.
18.Install ladder to the window
19.Rig up Jack 340K Unit complete
with jack basket above window
and secure with guidelines.
20.Rig up the work basket complete
with tong arm above the jack and
secure with guidelines.
21.Install rig ladder up to work
basket.
22.Put gin pole at its base and tighten
to work basket.
23.Hook up all hydraulic hose of the
power pack to the rig 340K
hydraulic system
24.Start engine of the power pack
and scope out the gin pole
telescopic
25.Attach the emergency escape line
26.Perform function test rig after rig
up 100% completed

VIII. FLOWCHART

DIAGRAM ALIR

Jika header tidak berwarna, maka dokumen ini tidak dikendalik


If header is in Black and White, this document(s) is Uncontrolled
Page 4 of 5

STANDARD OPERATION PROCEDURE


SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :

Rev : 0

Date :
24/09/2014

IX. PERFORMANCE INDICATOR


Normally, while all unit already on
platform, rig up process can be done
in 12 hours.
Due to rigging up from work barge or
lift boat will takes more time than
normal.

IX. INDIKATOR KINERJA


Pekerjaan rig up dengan kondisi
unit berada di atas platform
normalnya
dapat
diselesaikan
dalam waktu 12 jam.
Untuk kondisi rig up dari barge
atau
lift
boat,
waktu
yang
diperlukan akan lebih lama.

X. APPENDIX

X. LAMPIRAN

Jika header tidak berwarna, maka dokumen ini tidak dikendalik


If header is in Black and White, this document(s) is Uncontrolled