ANALYSIS OF RATES ( Road work )

5/13/2015 9:49
No.

Particular

Unit

Quantity

Rate

Per

1 Earth work in excavation in ordinary soil


either in embankment or in cutting with an
initial lead of 100 ft. and left of 5 ft.

Cft.

1000

Maistry no.

no.

Digger no.

no.

Worker for carrying no.

no.

Sundries L-s

L-s

2 Earth work in excavation in soft lateritic,


gravelly or kanker soil either in embankment
or in cutting with an initial lead of 100 ft.and
left of 5 ft.

Cft.

1000

Maistry no.

0.5

no.

Digger no.

10

no.

Worker for carrying no.

no.

Sundries L-s

L-s

3 Earth work in excavation in average lateritic,


gravelly or kanker soil either in embankment
or in cutting with an initial lead of 100 ft. and
lift of 5 ft.

Cft.

1000

Maistry no.

0.625

no.

Digger no.

14

no.

Worker for carrying no.

no.

Sundries L-s

4 Earth work in excavation in hard latritic,


gravelly or kanker soil either in embankment

L-s

Amount

or in cutting with an initial lead of 100 ft. and


lift of 5 ft.

Cft.

1000

Maistry no.

0.75

no.

Digger no.

21

no.

Worker for carrying no.

10

no.

Sundries L-s

L-s

5 Excavation in soft rock including carrige of


stone for 50 ft.

Cft.

100

Miner no.

no.

Workers for carrying no.

4.5

no.

Smiths no.

0.25

no.

Bellow boy no.

0.25

no.

Sundries L-s

L-s

6 Excavation in hard rock by blasting


including removing stones.

Cft.

100

Blasting powder lbs.

lbs.

Charcoal lbs.

10

lbs.

Miners no.

no.

Workers no.

5.5

no.

Black smiths no.

0.25

no.

Bellow boy no.

0.5

no.

Hammer man no.

0.5

no.

Sundries L-s

L-s

7 Collection of soling stones ( local ) at the


quarry site.

Cft.

100

Hammer man no.

no.

Workers ( collection and stacking ) no.

no.

Sundries L-s

L-s

8 Collection of soling stones ( kanker ) at the


quarry site.

Cft.

100

Hammer man no.

no.

Workers ( collection and stacking ) no.

no.

Sundries L-s

L-s

9 Collection of soling stones (laterite bouldre)


at the quarry site.

Cft.

100

Hammer man no.

no.

Workers no.

no.

Sundries L-s

L-s

10 Breaking metal from boulders ( 1-1/2" to 2")


at the quarry site.

Cft.

100

Hammer man no.

no.

Workers for getting out boulder no.

no.

Workers for breaking no.

no.

Sundries L-s

L-s

11 Collection and conversion of blasted debris


to 6" to 9" soling stones at the quarry site.

Cft.

100

Hammer man no.

no.

Workers ( collection and stacking ) no.

no.

Sundries L-s

L-s

12 Collection and conversion of blasted debris


to metal at the quarry site.

Cft.

100

Hammer man no.

1.5

no.

Workers ( collection and stacking ) no.

no.

Sundries L-s

L-s

13 Breaking metal ( 2" x 4" ) from boulders at


the quarry site including boxing.

Cft.

100

Hammer man no.

no.

Workers for boxing no.

no.

Sundries L-s

L-s

14 Breaking and boxing 1-1/2" to 2" from 2" to


4" metal at the quarry site.

Cft.

100

Workers for breaking and boxing no.

Sundries L-s

no.
L-s

15 Breaking and boxing 1/4" to 3/4" chippings


from 1-1/2" to 2" metal at the quarry site.

Cft.

100

Workers for breaking and boxing no.

15

Sundries L-s

no.
L-s

16 Breaking 1/4" to 3/4" chipping from 2" to 4"


metal at the quarry site.

Cft.

100

Workers for breaking and boxing no.

17

Sundries L-s

no.
L-s

17 Collection of kanker or laterite gravel at the


quarry site.

Cft.

100

Workers for digging and boxing no.

Sundries L-s

18 Collestion of hill gravel at quarry site.

L-s

Cft.

100

Workers no.

Sundries L-s

no.

no.
L-s

19 Extraction of 1-5"to 2"stone metal including


blasting and breaking to size at the quarry
site.

Cft.

100

Blasting powder lbs.

lbs.

Charcoal lbs.

10

lbs.

Miners no.

no.

Blacksmiths no.

0.25

no.

Bellows boy no.

0.25

no.

Hammer man no.

no.

Worker for breaking and stacking no.

11

no.

20 Laterite metal 2-1/2" gauge at quarry site.

Cft.

100

Worker for quarrying no.

no.

Hammer man no.

no.

Worker for breaking and stacking no.

no.

21 Extraction of 3/4"to 1"stone metal including


blasting and breaking to size at the quarry
site.

Cft.

100

Blasting powder lbs.

lbs.

Charcoal lbs.

10

lbs.

Miners no.

no.

Blacksmiths no.

0.25

no.

Bellows boy no.

0.25

no.

Hammer man no.

no.

Worker for breaking and stacking no.

11

no.

22 Extraction of 1/4"to3/4" gauge stone


chipping including blasting and breaking to
size at the quarry site.

Cft.

100

Blasting powder lbs.

lbs.

Charcoal lbs.

10

lbs.

Miners no.

no.

Blacksmiths no.

0.25

no.

Bellows boy no.

0.25

no.

Hammer man no.

no.

Worker for breaking and stacking no.

16

no.

23 Collection of boulders from river bed for


soling within two furlongs.

Cft.

100

Worker for collection and stocking no.

no.

24 Breaking metal 1-1/2" to 2" gauge river


shingle within two furlongs.

Cft.

100

Worker for colluction no.

no.

Worker for breaking and stacking, etc. no.

no.

Sundries L-s

L-s

25 Colluction of river shingle chippings 1/2" to


3/4" within two furlongs lead.

Cft.

100

Worker for colluction no.

no.

Worker for breaking and stacking, etc. no.

no.

Sundries L-s

26 Breaking brick into 1-1/2" to 2" aggregate.

L-s

Cft.

100

Jama bricks no.

1000

no.

Worker for breaking and stacking, etc. no.

no.

Sundries L-s

27 Colluction of sand within one mile lead.

L-s

Cft.

100

Bullock cart with driver no.

no.

no.

Worker for digging, carrying, loading and


unloading. no.

Sundries L-s

28 Colluction of gravel within one mile lead.

L-s

Cft.

100

Bullock cart with driver no.

no.

no.

Worker for digging, carrying, loading and


unloading. no.
Sundries L-s

L-s

29 Working expenses for a steam roller per


day.

Day.

Lubricating oil, cotton waste, kreosene, L-s

L-s

soap, asbestos pacing, etc.


Fire wood Cft.

36

Cft.

Driver no.

no.

Fireman no.

no.

Night durwan no.

no.

Cart for carrying fuel and water no.

no.

Repairs to chain and roller L-s

L-s

Washing out boiler and cleaning engine L-s

L-s

Sundries L-s

L-s

30 Working expenses for a motor roller per day Day.

Petrol Gal.

0.1667

Gal.

Krosene oil Gal.

Gal.

Lubricating oil, cotton waste L-s


Engine driver no.

L-s
1

Cleaning and rest L-s

L-s

Night durwan no.

no.

Water cart no.

no.

Sundries L-s

L-s

31 Consolidation of 6" soling stone by steam


roller after hand packing.

no.

Cft.

1000

Steam roller charges Day.

Day.

Maistry no.

no.

Workers no.

21

no.

Sundries L-s

L-s

32 Consolidation of stone metal with steam


including sand blinding ( 4-1/2" coat ).

Cft.

Steam roller charges Day.

1200

Day.

Sand for blinding Cft.

133

Cft.

Maistry no.

no.

Workers no.

14

no.

Sundries L-s

L-s

33 Scarifying old metal 2" deep, 12' wide,


screening, respreading and rolling with a
steam roller including sand blinding.

Cft.

Steam roller charges Day.

3300

Day.

Sand for blinding Cft.

137

Cft.

Maistry no.

no.

Workers no.

19

no.

Sundries L-s

L-s

34 2"thick hot bitumen grouting blinded with


1/4" to 1/2" stone chippings.

Sft.

63360

Bitumen at 100 lb per % Sft. Ton.

32

Ton.

Railway freight on above Ton.

32

Ton.

Carriage to site Ton.

32

Ton.

1/2" to 3/4" chipping site Cft.

4000

Cft.

Wood fuel Cft.

922

Cft.

Labour for brushing old surface,spraying, no.

380

no.

spreading,etc.
Rolling charges steam roller Day.

16

Day.

Hire for boiler sprayers, ect. Day.

12

Day.

Wire and bristle brushes L-s

L-s

Miscellaneous camber board L-s

L-s

35 Hot bitumen surface dressing ( 1st coat )


blinded with 1/4" to 1/2" stone chippings.

Sft.

63360

Bitumen at 40Lbs.per % Sft. Tons.

12.79

Tons.

Railway freight on above Tons.

12.79

Tons.

Carriage to site Tons.

12.79

Tons.

1/2" to 3/4" chipping site Cft.

4000

Cft.

Wood fuel Cft.

369

Cft.

Labour for brushing old surface, spraying, no.

380

no.

spreading, etc.
Rolling charges steam roller Day.

16

Day.

Hire for boiler spraier, etc. Day.

12

Day.

Wire and bristle brushes L-s

L-s

Miscellanous camber board, etc. L-s

L-s

36 Hot bitumen surface dressing ( 2nd coat )


blinded with 1/4" to 1/2" stone chippings.

Sft.

63360

Bitumen at 25Lbs.per % Sft. Tons.

Tons.

Railway freight on above Tons.

Tons.

Carriage to site Tons.

Tons.

1/2" to 3/4" chipping site Cft.

2650

Cft.

Wood fuel Cft.

230

Cft.

Labour for brushing old surface, spraying, no.

320

no.

spreading, etc.
Rolling charges steam roller Day.

16

Day.

Hire for boiler spraier, etc. Day.

12

Day.

Wire and bristle brushes L-s

L-s

Miscellanous camber board, etc. L-s

L-s

37 1" ( Consolidated tuicrness ) premix carpet.

Sft.

63360

Labour for brushing road surface no.

330

no.

6.4

Tons.

Printing coat.
Bitumen at 20 lbs.per % Sft. Tons.

Main carpet.
1/2" to 3/4" stone 3400 Cft. Cft.

5100

Cft.

10.29

Tons.

3/8" to 1/2" stone 1700 Cft.


Bitumen at 4 lbs.per Cft. Tons.
Sand at 5% of stone Cft.

255

Cft.

0.03

Tons.

1900

Cft.

11.19

Tons.

1300

Cft.

Railway freight for bitumen Tons.

27.91

Tons.

Carriage to site Tons.

27.91

Tons.

Bitumen for sand at 0.25 lbs.per Cft. Tons.

Wearing Course.
1/4" to 1/2" chips at 3 Cft.per 100 Sft. Cft.
1/8" to 1/4" Chips
Bitumen at 35 lbs.per % Sft. Tons.
Sand for final coat at 2 Cft.per % Sft. Cft.

Wood fire Cft.

804

Cft.

Labour for spreading, spraying, etc. no.

500

no.

Road roller charges M. Coat Day.

16

Day.

Road roller charges W. Coat Day.

Day.

Hire for boiler, etc. Day.

16

Day.

Wire and bristle brushes L-s

L-s

Miscellaneous, tools & plant, camber board L-s

L-s

Sft.

63360

Labour for brushing road surface no.

300

no.

11500

Cft.

20.31

Tons.

38 2" ( Consolidated tuicrness ) premix carpet.

Main carpet.
1" to 1-1/4" stone 7670 Cft. Cft.
1/4" to 3/4" stone 3830 Cft.
Bitumen at 3 lbs.per Cft. Tons.
Sand at 5% of stone Cft.

575

Cft.

Bitumen for sand at 0.25 lbs.per Cft. Tons.

0.07

Tons.

Topping course.
1/2" to 3/4" chipping at 4.5 Cft.per 100 Sft. Cft.
1/4" to 1/2" chipping bitumen at 4lb.per Cft. Tons.

3200
6.45

Wearing Course.
1/4" to 1/2" chips at 4.5Cft.per 100 Sft. Cft.

2900

Cft.

1/8" to 1/4" Chips


Bitumen at 25 lbs.per % Sft. Tons.
Sand for final coat at 2 Cft.per % Sft. Cft.

Tons.

1300

Cft.

Railway freight for bitumen Tons.

34.83

Tons.

Carriage to site Tons.

34.83

Tons.

Wood fire Cft.

1065

Cft.

Labour for spreading, spraying, etc. no.

1000

no.

Road roller charges M. Coat Day.

25

Day.

Road roller charges W. Coat Day.

Day.

Hire for boiler, etc. Day.

25

Day.

Wire and bristle brushes L-s

L-s

Miscellaneous, tools & plant, camber board L-s

L-s

39 Liquid seal coat 1 mile x 12' = 63360 Sft.

Sft.

Bitumen for liquid seal coat at 1/4 Gal.per Tons.

63360

9.25

Tons.

Freight on bitumen Tons.

9.25

Tons.

Carriage on bitumen Tons.

9.25

Tons.

Wood fuel for heating bitumen Cft.

267

Cft.

Labour for spraying no.

90

no.

3/8" grit or coarse sand for binding Cft.

1800

Cft.

Labour for spreading sand no.

40

no.

Steam road roller charges Day.

10

Day.

hire for boiler for heating bitumen Day.

Day.

Sq. yard at 215 gallons a tons.1760 gallons


and wastage.

Incidental charges such as L-s


brushes,pouring can, oil , etc.

L-s

Remark

1cum

28.31685

100 cum
1

100

1 0.035315 3.531466
Task=140 Cft.

7 0.247203 24.72026

for 1 Digger.

7 0.247203 24.72026

Task=100 Cft.
for 1 Digger.

1cum

28.31685

100 cum
1

100

0.625 0.022072 2.207166


14 0.494405 49.44053
8 0.282517 28.25173

plain section
only ( outter in
hill section =
70 Cft. )

wood fuel required for a steam roller for 1


day work is1/6
fathom or 36
Cft.=10Cwt.
1120 lb. If coal
is used 5Cwt.
or 560 lb. Is
necessary.

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage

13%Wastage