Beruflich Dokumente
Kultur Dokumente
5
RELEASE 1.0
Revision: 1.1
Page: 1 of 15
Description
Author
Date
Approved
Date
1.0
Initial Version
Hue Mach
Sep-03
Hong Nguyen
Sep-03
1.1
Hue Mach
Dec-03
Hong Nguyen
Dec-03
This document has been generated from template TL-QCM-001 Revision 2.2
Page: 2 of 15
Table of contents
TEST PLAN FOR WMS 1.0 With CPD 1.5
RELEASE 1.0
1. Introduction
1.1 Purpose
1.2 Scope
1.3 Document Terminology and Acronyms
1.4 References
2. Target Test Areas
3. Test Specifications
4. Milestones
5. Test Cycle Entry and Exit Criteria
5.1 Entry Criteria
5.2 Exit Criteria
5.3 Abnormal Termination
6. Environmental Needs
6.1 Hardware and Software
6.2 Productivity and Support Tools
6.3 Test Environment Configurations
7. Risks
1
1
4
4
4
4
4
5
6
9
10
10
10
10
11
11
11
11
13
Page: 3 of 15
1. Introduction
1.1 Purpose
The purpose of the Test Plan is to define, schedule and monitor the test execution. It supports the following
objectives:
1.2 Scope
This Test Plan is for release 1.0.
1.4 References
Page: 4 of 15
GUI
Functional
Page: 5 of 15
3. Test Specifications
Test Spec
Resource
Test Type
Note
Start System
Hue Mach
Functional/GUI
Stop System
Hue Mach
Functional/GUI
CPD server
System Operation
Suspend System
Hue Mach
Functional/GUI
Resume System
Hue Mach
Functional/GUI
Shutdown System
Hue Mach
Functional
Hue Mach
Functional/GUI
Host Communication
Definition Maintenance
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
CPD server
progress
monitoring invoice data
Hue Mach
Functional/GUI
CPD server
CPD server
progress
monitoring picking data
CPD server
progress
monitoring purchase data
Page: 6 of 15
Hue Mach
Functional/GUI
progress device
status
Hue Mach
Functional/GUI
Hue Mach
Functional
CPD server
Progress printing
list & Label
Hue Mach
Functional
Hue Mach
Functional/GUI
CPD server
Progress Working
effects
Hue Mach
Functional/GUI
Hue Mach
Functional
CPD server
progress Working
report
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional
Hue Mach
Functional/GUI
Hue Mach
Functional/GUI
Hue Mach
Functional
Huy Nguyen
Functional/GUI
CPD server
progress Query
Details
CPD server
Query Master Data
Item Master
CPD server
Query Master Data
Inventory Master
CPD server
Query Master Data
Storage Master
CPD server
Query Master Data
Shop Corner
Master
CPD server
Query Master Data
Location Master
CPD server
Query Master Data
Non Allocation
Item
CPD server
Query login dataOperation log
CPD server
Query login data
inventory log
Cart Picking
Page: 7 of 15
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Cart Picking-Break
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Function
Huy Nguyen
Function/GUI
Huy Nguyen
Function
HHT Quality
control
HHT Receiving
Inspection
HHT Single
Picking
Page: 8 of 15
Huy Nguyen
Functional/GUI
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
SP-Confirm Storage
Huy Nguyen
Functional
Huy Nguyen
Functional
Huy Nguyen
Functional
INS-Check Operator ID
Huy Nguyen
Functional/GUI
INS-Test Scanner
Huy Nguyen
Functional/GUI
INS-Test Printers
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
RCVINS-Cancel RCV
Inspection Data
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
Huy Nguyen
Functional/GUI
RCVINS-Finish RCV
Inspection Data
Huy Nguyen
Functional
INS-Break Time
Huy Nguyen
Functional/GUI
HHT - Inventory
handling
Storage in by Cartrack
Storage in by Pallet
Inspection
Receiving
Inspection
Shipping and
Receiving
inspection
Page: 9 of 15
SHPINS-View Shipping
Inspection Data
Huy Nguyen
Functional/GUI
SHPINS-Cancel Shipping
Inspection Data
Huy Nguyen
Functional
Huy Nguyen
Functional/GUI
SHPINS-Finish Shipping
Inspection Data
Huy Nguyen
Functional
SHPINS-View Shipping
Inspection Details
Huy Nguyen
Functional/GUI
User Guide
Huy Nguyen
Usability
Install Guide
Hue Mach
Installation
Shipping Inspection
Page: 10 of 15
4. Milestones
Milestones
Develop Test Plan
Review Test Plan
Development Detail Test
schedule
Development Test Case
Review Test Case
Update Test Schedule
Prepares test env. and data
Execute funcs.
Update Test Schedule
Execute Test
Start Date
End Date
Oct 6,2003
Oct 24,2003
Oct 20,2003
Dec 10,2003
Dec 12,2003
Dec 31,2003
Dec 15,2003
Page: 11 of 15
Page: 12 of 15
6. Environmental Needs
6.1 Hardware and Software
Resource
Configuration
RAM: 1Gb MB
Oracle 9i
HDD: 20 GB
Network adapter 100Mb
Ethernet
Ram: 256Mb
HDD 20Gb
Access Point
IEEE 802.11b
Windows CE 3.0
Laser scanner
Led: 2
Power: Lithium-ion
battery
Tool Name
Bug tracker
Task scheduling
Microsoft Excel
Microsoft Project
Microsoft
Microsoft
2000
2002
Test Report
Microsoft
2000
Vendor or In-house
Version
Page: 13 of 15
DM Client
Description
Simulator tool
Implemented in Physical
Configuration
Page: 14 of 15
7. Risks
Risk
Not enough time to
test
Lack of resource
for test
Mitigation Strategy
Optimize the test schedule and define
overtime strategy at the beginning.
Request IT soon to support the system
resource
(human,
Page: 15 of 15