Sie sind auf Seite 1von 130

Site Survey Report for BTS/N

Surveyor:

KALA/GILBERT

Approved:

SITE INFORMATION
Site Id

Site Name

3G co-located

Airtel/Warid co-located

Site Type

Existing

Target

Configuration

Target

Target No. of APM30H:

Coordinates

Longitude

Latitude:

Location (Flat/Door/block):
Site
Address

Road or Street Name:


Nearest Landmark:
Responsible Field Engineer:
Security Cabin Available:

Security Guard Available:

Site Boundary:
Suitable time for equipment delivery:
Site access
information

Floor in which the shelter is located for RTT/RTP sites:


Suitable space available for lifting equipment for RTT/RTP sites:
If No, alternative solution for lifting equipment:
Access to site in terms of movement of truck and/or crane
(eg. Provide Road width from main road to Site):
Remarks:

Tower Owner:

Tower Type:

Make:

Tower Type:

Tower Plinth condition including lock nuts:

Lightning Arrestor available:

Building Height (m):


Tower/Pole Height from Tower/Pole Base (m):
Tower Details

RTT / RTP

Tower/Pole Height from AGL (m):

Tower Details

RTT / RTP

Building Height (m):


Tower/Pole Height from Tower/Pole Base (m):
Tower/Pole Height from AGL (m):
GBT
Remarks:

Tower Height (m):

Site Survey Report for BTS/N


Surveyor:

Site Type
Grid Power:
DG1 Data

DG2 Data
Stabilizer
Data
PMU/PIU/ACPDU
Data

KALA/GILBERT

Approved:

POWER INFORMATION
Target:
Load out of ATS:

Existing:
Phase:
Make:

Phase:

Rating (KVA):

DG Run Hour Meter Available:

Make:

Phase:

N/A Type of lock on DG:

Rating (KVA):

DG Run Hour Meter Available:

AVR available:

Make:

Power cable length between Stabilizer & ACDB (m):


Unit Rating:
LCU Rating:

Make:

Power cable length between Stabilizer & ACDB (m):


MCB Capacity:

Main MCCB capacity (Input):


ACDB Data

N/A Type of lock on DG:

MCB Capacity:

Existing Huawei BTS MCB rating:


Power cable length between ACDB & Rectifier(m):
Make:

Capacity = No. of Slots x Rectifi

No. of Empty Slots:

Rectifier installed (No. of modu

Existing Current Consumption (Load):


Capacity:
Rectifier Data

125A

Qty:

Capacity:

Free MCB (DCDB) Capacity:

32A

Qty:

Capacity:

Capacity:

20A

Qty:

Capacity:

Space for installing new MCBs available:

NO

Power cable length between Rectifier & Battery Bank(m):

Existing Cross-Section (sq. mm)


Power cables
between
Existing Colour
Rectifier & BTS
Existing Length (m)
Required Length (m)
Battery Bank

Make:

SHOTO

Positive

Negative

16

16

BLACK

BLUE

N/A

N/A

Capacity (V/AH):

300AH

Battery Chiller

Make:

Remarks:

BATTERY CHILLER NOT INSTALLED

Air Con Data

N/A

Capacity(AH):

Make:
Remarks:

N/A

Rating (Tr. X No.):

IT HAS HEAT EXCHANGER

Earthing connectivity (Combined for electrical/electronic/lightening etc, Single point):


If No, Specify:
Earthing

Feeder Grounding Bus Bar available:

YES

Sufficient Earthing points

Cabinet Grounding Bus Bar available:

YES

Sufficient Earthing points

Remarks:
Make:
Shelter Data

New Entry Plate Required:


Remarks:

N/A
N/A

Size(L x W x H) in metres

Holes to be drilled in Exi

ITS AN OUTD

Site Survey Report for BTS/N


Surveyor:

KALA/GILBERT

2G Feeder & Jumper cable information


Existing Feeder cable length (m)

Approved:

CABLES INFORMATION
Sector 1
900 Band
1800 Band
0

7/8

7/8

Existing No. Of Feeders used

Required Feeder cable length (m)

Required No. Of Feeder cable

Existing Jumper cable length (m)

1/2"

1/2"

Existing No. Of Jumpers used (BTS end)

Required Jumper cable length (m)

Required No. Of Jumper cable (BTS End)

TMA details (Make + Model)

N/A

N/A

RET details (Make + Model)

N/A

N/A

Combiner/Diplexer used

YES

YES

Combiner used in Frequency band

900

1800

Where is the combiner used?

JUMPER & ANTENNA END

Existing Feeder cable cross-section

Existing Jumper cable cross-section

Sector 4 (1800 Band)


Existing Feeder cable length (m)

N/A

N/A

Existing Feeder cable cross-section

N/A

N/A

Existing No. Of Feeders used

N/A

N/A

Existing Jumper cable length (m)

N/A

N/A

Existing Jumper cable cross-section

N/A

N/A

Existing No. Of Jumpers used

N/A

N/A

TMA details (Make + Model)

N/A

N/A

RET details (Make + Model)

N/A

N/A

Combiner/Diplexer used

N/A

N/A

Combiner used in Frequency band

N/A

N/A

Where is the combiner used?

N/A

N/A

Feeder Connector Type:

FEMALE

Jumper Connector Type:

Feeder Connector Size:

7/8

Jumper Connector Size:

Remarks:

2G E1/Trunk
Cable

Type of Trunk
Existing Length (m):
Required Length (m):
Remarks:

CPRI CABLES

120 E1
Existing Quantity (PCS):
Required Quantity (PCS):

2G 900 Existing Length


(m):

2G 900 Required Length (m):

2G 1800 Existing Length


(m):

2G 1800 Required Length (m):

3G Existing Length
(m):

N/A

3G Required Length (m):

Remarks:
Required Length (m):
3G FE Cable

Remarks:

NO 3G

2 Required Quantity (PCS):

Site Survey Report for BTS/N


Surveyor:

KALA/GILBERT

Approved:

SECTOR INFORMATION
Photo Taken

Panaromic Photos

Unused/Redundant Antenna on Site:

360 Deg Photos


0

No. of 2G sectors:
Sector 1 (2G+3G) G900/G1800/3G

No. of Antenna in
use:

Antenna 1

Antenna

Make

AGISSON

N/A

Model

ATR451703

N/A

824-960/1710-2180/1710-2180

N/A

900/1800

N/A

N/A

11.43

N/A

20

N/A

Frequency Supported
Frequency in Use
Total Number of Ports
Antenna Base Height (m)
Azimuth (degrees)

G900

G1800

3G

G900

No. of Feeders installed

N/A

N/A

Mechanical Tilt

N/A

N/A

Electrical Tilt

N/A

N/A

Pole information

Length (m):

Remarks:

Length (m):
-

Sector 2 (2G+3G) G900/G1800/3G


No. of Antenna in
use:

Antenna 1

Antenna

Make

AGISSON

N/A

Model

ATR451703

N/A

824-960/1710-2180/1710-2180

N/A

900/1800

N/A

Frequency Supported
Frequency in Use

Total Number of Ports


Antenna Base Height (m)
Azimuth (degrees)

N/A

11.43

N/A

130

N/A

G900

G1800

3G

G900

No. of Feeders installed

N/A

N/A

Mechanical Tilt

N/A

N/A

Electrical Tilt

N/A

N/A

Pole information
Remarks:

Length (m):

Length (m):
-

Site Survey Report for BTS/N


Surveyor:

KALA/GILBERT

Approved:

SECTOR INFORMATION
Sector 3 (2G+3G) G900/G1800/3G
No. of Antenna in
use:

Antenna 1

Antenna

Make

AGISSON

N/A

Model

ATR451703

N/A

824-960/1710-2180/1710-2180

N/A

900/1800

N/A

N/A

11.43

N/A

270

N/A

Frequency Supported
Frequency in Use
Total Number of Ports
Antenna Base Height (m)
Azimuth (degrees)

G900

G1800

3G

G900

No. of Feeders installed

N/A

N/A

Mechanical Tilt

N/A

N/A

Electrical Tilt

N/A

N/A

Pole information

Length (m):

Remarks:

Length (m):
-

Sector 4 (2G - GSM 1800 Only)


No. of Antenna in
use:

Antenna 1

Antenna

Make

N/A

N/A

Model

N/A

N/A

Frequency Supported

N/A

N/A

Frequency in Use

N/A

N/A

Total Number of Ports

N/A

N/A

Antenna Base Height (m)

N/A

N/A

Azimuth (degrees)

N/A

N/A

G900

G1800

No. of Feeders installed

N/A

N/A

N/A

N/A

N/A

Mechanical Tilt

N/A

N/A

N/A

N/A

N/A

Electrical Tilt

N/A

N/A

N/A

N/A

N/A

Pole information
Remarks:

Length (m):

3G

N/A

G900

Length (m):

Site Survey Report for BTS/N


Surveyor:

KALA/GILBERT

Approved:

SECTOR INFORMATION
Sector 5 (2G - GSM 1800 Only)
Antenna 1

Antenna

No. of Antenna in
use:

N/A

N/A

Make

N/A

N/A

Model

N/A

N/A

Frequency Supported

N/A

N/A

Frequency in Use

N/A

N/A

Total Number of Ports

N/A

N/A

Antenna Base Height (m)

N/A

N/A

Azimuth (degrees)

N/A

N/A

G900

G1800

No. of Feeders installed

N/A

N/A

N/A

N/A

N/A

Mechanical Tilt

N/A

N/A

N/A

N/A

N/A

Electrical Tilt

N/A

N/A

N/A

N/A

N/A

Pole information

Length (m):

3G

N/A

Remarks:

G900

Length (m):
-

Sector 6 (2G - GSM 1800 Only)


No. of Antenna in
use:

Antenna 1

Antenna

Make

N/A

N/A

Model

N/A

N/A

Frequency Supported

N/A

N/A

Frequency in Use

N/A

N/A

Total Number of Ports

N/A

N/A

Antenna Base Height (m)

N/A

N/A

Azimuth (degrees)

N/A

N/A

G900

G1800

No. of Feeders installed

N/A

N/A

N/A

N/A

N/A

Mechanical Tilt

N/A

N/A

N/A

N/A

N/A

Electrical Tilt

N/A

N/A

N/A

N/A

N/A

Pole information
Remarks:

Length (m):

3G

N/A

G900

Length (m):

Site Survey Report for BTS/N


Surveyor:

KALA/GILBERT

Approved:

NEW POLE/ANTENNA/RRU/GRRU INFORMA


Sector 1
New pole required for GRRU

N/A

Available Height for new GRRU Pole (m)

N/A

Available Height for new GRRU (m)

N/A

New pole required for 3G Single Band Antenna

N/A

New Single band antenna for 3G required

N/A

Available Height for new 3G Antenna Pole (m)

N/A

Available Height for new 3G Antenna (m)

N/A

Available Azimuth for new 3G Antenna (degree)

N/A

New pole required for RRU

N/A

Available Height for new RRU Pole (m)

N/A

Available Height for new RRU (m)

N/A

Remarks:

EXISTING AIRTEL EQUIPMENT ON SITE:


2G BTS Vendor
BTS Footprint

N/A
1.

(L x W) in Mtr

No. Of BTS cabinets

N/A
BTS input Voltage

N/A

2.
Baseband unit details

N/A

RF unit details

N/A

3G BTS Vendor

N/A

BTS Model

BTS input (-48V DC, 220V AC)

N/A

Capacity of MCB used

Baseband unit details

N/A

RF unit details

N/A

Other available boards and cables with quantity:


1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Remarks:

Site Survey Report for BTS/N

Surveyor:

KALA/GILBERT

Approved:

EXISTING WARID EQUIPMENT ON SITE


2G BTS Vendor

HUAWEI

BTS Model

No. Of APM30 cabinet available

APM30 TYPE

No. Of RFC cabinet available

No. Of BBU available

No. Of GRFU available

No. Of DRFU available

No. Of GRRU available

No. Of DRRU available

3G BTS Vendor

N/A

No. Of RRU available

BTS Type
Capacity of MCB used

Other available boards and cables with quantity:


1

UPEU

UPEU

N/A

N/A

Remarks:

NEW 2G GRRU INSTALLATION

On Tower

N/A

On Pole

N/A

BBU and GRRU Connection Fiber (CPRI)


Jumper (1/2 Flexible)

On Wall

Length(m):
Scenarios

Feeder:

N/A
N/A

DC Power Cable For RRU:

Length(m):

N/A

PGND Cable Length For RRU (m):

Length(m):

N/A

Space available for CPRI (fiber) and power cables on the Horizontal & Vertical Cable Trays:
Space available for CPRI (fiber) and power cables in the entry plate (window):
Other Material Needed (grounding kit, etc):

Sector 1

Available RRU Pole Length (m)

900
N/A

Remarks:

1800
N/A
-

Site Survey Report for BTS/N

Surveyor:

KALA/GILBERT

Approved:

NEW 3G RRU INSTALLATION


On Tower

N/A

On Pole

N/A

BBU and GRRU Connection Fiber

On Wall

Length(m):

Jumper (1/2 Flexible)

Scenarios

N/A

Feeder:

N/A

DC Power Cable For RRU:

Length(m):

N/A

PGND Cable Length For RRU (m):

Length(m):

N/A

Space available for CPRI (fiber) and power cables on the Horizontal & Vertical Cable Trays:
Space available for CPRI (fiber) and power cables in the entry plate (window):
Other Material Needed (grounding kit, etc):

N/A
Sector 1

Available RRU Pole Information

Length(m)

N/A

Remarks:

EXTERNAL ENVIRONMENT ALARM

Telemetry system available:

NO

(Inala type equipment)


If Alarm Not Wired, check the feasibility and specify:
List of Alarms Wired
1

N/A

N/A

N/A

N/A

N/A

10

N/A

13

N/A

14

N/A

Required Alarm Cable Length (m):


Remarks:

THE ALARMS ARE TERMINATED WELL BUT NOT LABELLED


EVALUATION

Huawei Evaluation

Perfect

Good

Customer Evaluation

Accepted

Rejected

Huawei Engineer

Approved By:

Customer Engineer
SURVEY PARTICIPANTS
Name

Position

Tel

KIZYA GILBERT

ENGINEER

0700850240

rt for BTS/NodeB

proved:

_____

03/11/2013

ION

d co-located

of APM30H:

Target No. of RFC:


Altitude(m):
Building Name:
Town or City:

Contact:

vailable:

Security Contact:
Site Key Type:
Any Working Time Limitation:

No. of tower legs:


Tower Leg Earthing available:
Aviation Lamp available:
GSM 900
Sec 1

Sec 2

3G
Sec 3

Sec 1

Sec 2

Sec 3

GSM 1800
Sec 1

Sec 2

Sec 3

Sec 4

Sec 5

Sec 6

rt for BTS/NodeB

proved:

_____

03/11/2013

TION

f ATS:

k on DG:
DG Run Hour Meter Reading:

k on DG:
DG Run Hour Meter Reading:

N/A

Rating(KVA):
Cross-Section (sq.mm):

N/A

Input Phase:
Output Phase:
Cross-Section (sq.mm):
Qty:

MCB Capacity:

Qty:

Qty:

MCB Capacity:

Qty:

100A
Cross-Section (sq.mm):

f Slots x Rectifier rating


(No. of modules x Ampere Load):
20.7A
16A

(Battery MCB)

N/A

Qty:

N/A

N/A

Qty:

N/A

Cross-Section (sq.mm):

Qty:

16

Negative

Ground (PGND)

16

25

BLUE

YELLOW/GREEN

N/A

N/A

300AH

Type:

-48 V DC

H):

N/A

X No.):

N/A

ingle point):

YES

Earthing points available:

YES

Earthing points available:

YES

x H) in metres:

e drilled in Existing Entry Plate:


ITS AN OUTDOOR SITE

N/A
N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

ATION
Sector 2
900 Band
1800 Band

1800 Band

12

12

18

18

7/8

7/8

7/8

7/8

15

15

20

20

1/2"

1/2"

1/2"

1/2"

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NO

NO

NO

NO

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Sector 5 (1800 Band)

Sector 6 (1800 Band)

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

r Type:

MALE

r Size:

4/5

Sector 3
900 Band

(PCS):
y (PCS):

Existing 900 Quantity


(PCS):

Required 900
Quantity (PCS):

Existing 1800 Quantity


(PCS):

Required 1800
Quantity (PCS):

Existing Quantity
(PCS):

N/A

Required
Quantity (PCS):

20

1 FE Sync cables for NSN 3G out of Kampala (m):

N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

ATION

Installation Space
0

Sketch Map

No. of 3G sectors:

0/G1800/3G
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):
-

0/G1800/3G
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

N/A

N/A

N/A

N/A

N/A

N/A
G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):
-

rt for BTS/NodeB

proved:

_____

03/11/2013

ATION

0/G1800/3G
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):

800 Only)
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

N/A
G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):

N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

ATION

800 Only)
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):

N/A

800 Only)
Antenna 2

Antenna 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

900

G1800

G900

G1800

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Length (m):

N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

RU INFORMATION
Sector 2

Sector 3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NT ON SITE: NO AIRTEL EQUIPMENT


N/A

BTS Models

N/A

Rectifier
(-48V available)

N/A
N/A

N/A
N/A
N/A

NodeB Footprint (L x W) in Mtr

N/A

N/A

Rectifier (-48V available)

N/A

N/A

N/A

N/A

10

N/A

N/A

11

N/A

N/A

12

N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

MENT ON SITE
3900A

DC

BTS input power

-48 V DC

CAPACITY OF MCB USED

100A

No. Of DDPU available

No. Of DTRU available

No. Of DCOM available

N/A

WBBP version

N/A

N/A

EMUA available

N/A

N/A
N/A
N/A
N/A
-

N/A

On Stand

N/A

Others

Quantity(PCS):
Jumper:

N/A

Length (m):

N/A
N/A
N/A

Quantity(PCS):

N/A

Quantity(PCS):

N/A

ble Trays:

N/A
N/A

Sector 2

Sector 3

900

1800

900

1800

N/A

N/A

N/A

N/A

rt for BTS/NodeB

proved:

_____

03/11/2013

LLATION
N/A

On Stand

N/A

Others

N/A

Quantity(PCS):
Jumper:

N/A

ble Trays:

N/A

Length (m):

N/A

Quantity(PCS):

N/A

Quantity(PCS):

N/A

N/A
N/A

Sector 2
Length(m)

Sector 3
N/A

Length(m)

N/A

ENT ALARM
Alarm DDF available:

YES

Alarm Wired:

YES

N/A

N/A

N/A

N/A

11

N/A

12

N/A

15

N/A

16

N/A

Required Alarm Cable Quantity (PCS):

Normal

Rejected

Reason:
Date:
Date:

ANTS

0240

Email

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Sketch Maps of Installation Space

---Site layout output (existing BTS, NodeB(BBU,RRU), Power, TX cabinet location, cable tray layout, feeder cable layout, IF cable layout, RF an
height, MW antenna height, power cable layout, TX cable layout, free spaces on site)
Note:
1.The Plot Size must be mentioned in the site layout for all sides.
2.All elements should have dimensions.
3.Distance between all elements should be measured and mentioned accurately.

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Proposed new equipment layout: (BTS/NodeB/RRU/BBU/RF & MW Antennae/MW ODU/Pole/Feeder/IF cab


optical cable)
New Slab Required:
Horizontal Cable Tray Required:
Length of cable tray required (HCT+VCT) in mtr:
Remarks:

New Slab/Slab Extension Size (L x W) in m


Vertical Cable Tray Required:
Cable Tray length required inside Shelter

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

New Equipment Slab Layout

Approved:

_____

03/11/2013

IF cable layout, RF antenna

Equipment Type

Installation Space:

Yes

Indoor Space
Enough

No

Need New Slab

Yes

Space Availibility

ole/Feeder/IF cable/RRU power cable/RRU

Size (L x W) in mtr:
red:
d inside Shelter in mtr:

Notes:

_____

30-Dec-99

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

Panoramic View from top of Tower (every 45 degrees)

_____

Site Survey Report for BTS/NodeB


Surveyor:

Panoramic View

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

Panoramic View

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

Panoramic View

KALA/GILBERT

Approved:

_____

Notes:

0 Degrees

45 Degrees

Notes:

90 Degrees

135 Degrees

Notes:

180 Degrees

225 Degrees

Notes:

270 Degrees

315 Degrees

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

1. Equipment room-sketch map or outdoor site equipments layout


2. Dimension of indoor room / slab / all units or elements and the space between them
3. Proposed cabling route

Equipment room and Site layout-photos (with comments to explain)

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Equipment room and Site layout-photos (with comments to explain)

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Equipment room and Site layout-photos (with comments to explain)

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Equipment room and Site layout-photos (with comments to explain)

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Cabinet internal layout: Sub-rack layout output( Rectifier location, MW IDU location, TRX module location, environment func
location, power convertor location. And all function module connections)

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Cabinet internal layout

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Cabinet internal layout

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Cabinet internal layout

Approved:

_____

/NodeB
03/11/2013

module location, environment function location, DDF location, Battery

Notes:

/NodeB
03/11/2013

Notes:

/NodeB
03/11/2013

Notes:

/NodeB
03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

Antenna Installation Location View: Sector 1

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

Antenna Installation Location View: Sector 2

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

Antenna Installation Location View: Sector 3

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The Transmission Equipment

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The Power Supply Equipment

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The Power Supply Equipment

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The Power Supply Equipment

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The External Alarm Box

_____

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

External & Internal View of The External Alarm Box

_____

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Tower Photos

ROOFTOP POLES

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Horizontal & Vertical Cable Tray

Approved:

_____

03/11/2013

Notes:

03/11/2013

Notes:

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

Site Survey Report for BTS/NodeB


Surveyor:

KALA/GILBERT

Approved:

_____

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

03/11/2013

Notes:

Das könnte Ihnen auch gefallen