PowerCenter

Data Validation Option (DVO)


Overview

Your Name Here


Date

2007 Informatica. Company Confidential. Forward-looking information is based upon multiple


assumptions and uncertainties and does not necessarily represent the companys outlook.

Data Validation Option:


Deliver Trusted Data with Lower
Business Risk

Data Validation Option Benefits


Increased likelihood of success, lower project risk
Significant cost savings, faster time to market
50% source-to-target testing
80% regression testing
90% upgrade testing

Ability to test all data, not just a small sample


Ability to test in heterogeneous environments
No need to know SQL
Complete Audit Trail and comprehensive reporting of all
testing activities
No need to acquire additional server technology: leverage
PowerCenters scalability, platform support, and data
access

Common Data Validation Use Cases

Source to Target Testing

ETL Validation

Data Masking

Production to Development Testing

ETL version upgrade

ETL Migration

Application retirement

Database upgrades

Data is Transformed

Data is Identical

Production Reconciliation and auditing

Data Warehousing

MDM

Operational integration

Audit/Balance/Control solutions

Data moves to Production

Customer Pain Point Stories

Large North American insurance company


They currently use manual processes: SQL queries, writing code.
They are currently only able to validate 20% of their data.

Large North American investment company


They move large quantities of data into their production systems
nightly.
They are currently only able to reconcile a small fraction of the data
that is going live.

How Testing Fits into the ETL Lifecycle


DVO

Initial
Development

Investigation

Development

Testing

Estimate: 30%

Power Center
Upgrade

Upgrade

Testing
Estimate: 70%

Current Data Validation Approach


Currently Data Validation is done manually by
writing SQL scripts
Data Validation should take 30% of project
time for a Data Integration project
Because of the complexity involved in testing and the
pressure to meet production deadlines most customers
admit they do not commit the time for data validation
resulting in data quality issues and higher project risk

PowerCenter upgrades can take up to 6 months


With DVO, data validation testing can be reduced to
ONE day, and provide complete test coverage

Problems with Manual Validation


Time-consuming and expensive
Time is spent writing queries and waiting for them to run

Error-prone
Manual inspection errors
Coding errors

Too slow for complete test coverage


Time/Cost pressure leads to try it here and there approach
The tester runs out of time/money before testing is done

The usual problems associated with writing custom code


No audit trail
No reuse
No methodology
8

DVO Product Overview


Tool built on top of Informatica
PowerCenter
Users define data rules using easy-tounderstand GUI

Data is processed and evaluated using


PowerCenter
Results are displayed in the GUI and
stored for later retrieval and reporting

Data Validation Option Architecture


1

DVO is used to
define Test Rules

DVO is used
to display results

Comprehensive
Reporting on all
Tests and Results

PC API
Applications

Results
DB

Databases

Data Formats

All results are


stored in the
Results DB

Real time

Legacy

PowerCenter mappings are generated


Session is executed

10

We used DVO to compare 14 tables and about 30


million rows in less than 5 hours.

The largest of the tables was 94 columns.


When I asked our QA people how long it would take
them to run the scripts and test this amount of data,
they mentioned months
Tom Kato
Data Integration Consultant
11

Large North American Financial Institution


DVO for Production Table Balancing
KEY BUSINESS IMPERATIVE

.
Financial Institution. They have a nightly load of 350
tables into their enterprise data warehouse.
IT INITIATIVE

Production Data Validation


DATA INTEGRATION PROJECT

Data Warehouse

They spend hundreds of millions purchasing troubled debt in the


USA
The data and risk calculations on those assets must be correct.
Bad data could cost them millions and put them out of business

THE CHALLENGE

INFORMATICA ADVANTAGE

Business users were


complaining about missing
data in the systems.
Data errors can lead to very
costly bad business decisions.
They were doing manual
testing via developer-written
mappings and PL/SQL
Other products available today
could not meet their
requirements.

With DVO they were able to


provide complete test
coverage quickly.
They are able to do both batch
and incremental data
validation.
With DVO they have a
complete audit trail.

RESULTS/BENEFITS

DVO found where data was


missing. They found
thousands of missing records
due to bad coding and
improperly rerun failed jobs.
Reloaded all missing data in
two weeks.
They are looking to implement
on-going incremental data
validation for all new data
loaded into tables.

12

North American Retailer


DVO for Informatica PowerCenter Upgrade
KEY BUSINESS IMPERATIVE

North American Retailer. Must do more with less and keep


Data Integration productivity high
IT INITIATIVE

PowerCenter Upgrade

Needed to upgrade PowerCenter quickly, with minimal DI


disruption, and with low cost

DATA INTEGRATION PROJECT

Data Warehouse
THE CHALLENGE

Upgrade from

PowerCenter 8.1 to 8.5


required 1 full day of data
testing (30 million rows)
across old and new
systems

They projected 6 to 8
weeks for complete
manual regression testing.
.

INFORMATICA ADVANTAGE

DVO install and setup in


One day
Testing reduced from 6 to
8 weeks to less than 1
day!
Upgrade testing
completed in 2 days with
full coverage of data

RESULTS/BENEFITS

Reduced data validation


test time by 85% while
providing complete test
coverage.

13

Data Validation Testing with DVO Lowers


Your Overall Data Integration Business Risk

Questions?

14

DVO Resources
DVO External Web Page
www.informatica.com/more/DVO

Contacts
Val Rayzman
Saeed Khan
Roger Nolan

VP DVO
Product Management
Product Marketing

15

Data Validation Connectivity


Natively DVO supports (via PC mappings):
Flat files
Relational DBs
ODBC
Via ODBC :
SAP iWay SAP ODBC Driver
XML Data Direct ODBC Driver
PWX Mainframe sources via PWX ODBC connectivity
Other relational types & appliances: Netezza, Greenplum,
Postgres, MySQL etc.
DVO does not support:
Non-relational files
Hierarchical structures or recurrences unless they are
flattened in some appropriate way

16

DVO
Customer Use Cases

2007 Informatica. Company Confidential. Forward-looking information is based upon multiple


assumptions and uncertainties and does not necessarily represent the companys outlook.

17

17

Specific DVO Use Case Scenarios


Mix These Slides Into Your Deck as
Appropriate for Your Customer

18

DVO: Production Validation (Reconciliation)


Test data before moving to Production Systems
Oracle
DB

Production
Application

Informatica
PowerCenter

Microsoft
SQL
IBM
DB2
Mainframe
Application

DVO
Process:
Validate that data values are the data values expected as you move them into production
This is typically a workflow run at night.
The load only executes after the tests are passed successfully
Validation testing catches errors in loads, transforms, and operational issues.
Benefits
Ensures the integrity of all data moved into production systems.
19

DVO: Source-to-Target Testing


Data is Transformed During Move
SourceTables

Informatica
PowerCenter

Target Tables

DVO

Process:
Validate that the data is after the move and transformation
Validate that the data values are the values you expected
Benefits
Validate 100% of data
GUI based tool with simple to use operators to create tests
Testing is done in days not weeks etc.

20

DVO: PowerCenter Upgrade


Ensure output of both versions is identical
PowerCenter 8.x

PowerCenter 8
Output

SourceTables

DVO

PowerCenter 9.x

PowerCenter 9
Output

Process:
Validate that the data produced by both versions of PowerCenter is identical.
Test every row, and every column of every table
Benefits
Validates 100% of data
Testing is done in days not weeks etc.
Much of the testing can be automated
21

DVO: ETL Migration


Ensure successful migration to PowerCenter
Hand coding or
competitive product

PowerCenter 8
Output

SourceTables

DVO

PowerCenter 9.x

PowerCenter 9
Output

Process:
Validate that the new mappings produce the same output as the old ETL
Test every row, and every column of every table
Benefits
Validate 100% of data
Testing is done in days not weeks etc.

22

DVO: Application-to-Application Migration


Verify data move to a new application
Mainframe
Application
Informatica
PowerCenter

Enterprise
Application

DVO
Process:
Validate that the data is unchanged after move to new enterprise application
Test every row, and every column of every table
Benefits
Validate 100% of data
Testing is done in days not weeks etc.

23

DVO: Validation for MDM


Validate data before moving to MDM
Oracle
DB

MDM
Landing
Tables

Informatica
PowerCenter

Informatica
MDM

Microsoft
SQL
IBM
DB2
Mainframe
Application

DVO
Process:
Validate that data values are the data values expected as you move them into MDM
Benefits
Validate 100% of data
Testing is done in hours not weeks etc.
MDM Golden Record is based on valid data

24

DVO: Regulatory Compliance


Validate that data behind the reports is correct
Data
Sources

Informatica
PowerCenter

Data
Warehouse

Business
Reports

Auditor

DVO
Process:
Validate that the data was moved to the data warehouse correctly
Validate that the data values in the warehouse are as expected
Review the audit trail of data validation tests run and their results
Assess the completeness of the data validation test coverage
Benefits
Validate 100% of data
Testing is done in hours not weeks etc.
Testing that can be shared with auditors to prove compliance
Complete audit trail of all data validation tests run and their results
25

PowerCenter Upgrade
DVO for PowerCenter Upgrades
Production
Environment (8.x)

Development
Environment (9.x)

Test
Environment (9.x)

ILM

ILM

DVO

DVO

27