MATERIAL MANAGEMENT
Prepared by D S & P
Document: SOPDist/MM/00/2013
Date: 6th Dec2013
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
2 of 7
DS&P
Date of Version
Page
Issuing Department
Distribution:
CC: CDO
CC: CSCO
CC: DCDOs
ANNEXURE A
Time line, targets & responsibility: Annex A
Page 2 of 7
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
3 of 7
DS&P
Date of Version
Page
Issuing Department
OBJECTIVE:
To create harmonious cross functional coordination to improve upon the system efficiency to achieve
companys business objectives.
PURPOSE:
a)
b)
To agree upon departmental activity timelines for completion of the entire procurement process
for overall improvement in material flow.
To identify areas needing improvement and prepare departmental guidelines for squeezing in
their process times.
SCOPE:
BU Distribution, FBA, Finance, Treasury, Procurement & Inventory Management.
DISTRIBUTION STRATEGY:
a)
In accordance with business plans, UDs shall initiate preparation of their MRs from Jan 15th and complete
in all respects by Feb 15th, 2014 for FBA to take over for finalization and approval by Mar 1st , 2014.
b)
TPRE to ensure 100% specifications availability on share folder SFS for all material items, tools and
equipment. If there is a change in desired specifications of a product , that will be notified to Procurement
by D ( S&P) to be taken into account for future procurement needs without disturbing the current process.
c)
TPRE to clear 10 to 15 TE files every week received from procurement under intimation to all concerned.
d)
e)
Low Value items with no standard specifications to be purchased on Cash Advance by UDs against their
budgeted MR.
Page 3 of 7
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
4 of 7
DS&P
Date of Version
Page
Issuing Department
PROCUREMENT:
1. TENDERING FOR BIDS AND PROPOSALS / TECHNICAL EVALUATION:
At least three quotations will be required to complete the bidding process except proprietary items
of OEMS. In all other cases if not possibly three in certain situations, then at least two.
All the suppliers participating in the bids shall be PQV (prequalified vendors) with type tested
products. SC will constantly endeavor to prevent Single sources of supply by rendering a back end
process of R&D performed on potential suppliers identified by SC through a well indentified /
documented evaluation process.
TPRE to support in searching and recommending new vendors that can potentially become suppliers
of KESC of a particular product. Commercial and TE of the potential vendors to go on year round
ideally to be completed before the bidding process to allow them to participate in tenders.
The tender bidding process involving a new vendor that has been referred to TPRE for TE shall not
remain suspended owing to delays in receiving technical feedback from TPRE. The process must go
on with prevalent PQVs in place while the TE of a new vendor is awaited. The new vendor may then
be included in the next invitation for bids subject to positive evaluation of TPRE.
No PO to be issued to a vendor whose product is under type testing process until the results of the
test are known to be favorable. TPRE will provide their time lines separately.
Page 4 of 7
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
5 of 7
DS&P
Date of Version
Page
Issuing Department
FINANCE:
In conjunction with SOPs of other departments, Finance Department shall give all out support to meet the
procurement time lines for ensuring smooth material supplies. In this regards we suggest following measures;
To review the Procurement's Monthly payment ceilings which determine the amount of payment
that can be made to a vendor in a month. This is seen as a limiting factor if procurement is to
enhance the delivery capability of a particular vendor.
Treasury's LC cap limits need to be reviewed and improvised on case to case basis to allow fresh L/C
for critical items to be opened. New L/C waits until previous LCs are brought under limits agreed with
banks.
While minimum dependence / prudent use of the option of cheque against delivery is being advised
to SC, finance will ensure that the cheque is released to the vendor within 15 days of delivery. The
departments involved to improve upon the response time are IM, FBA , C&A and Treasury.
FBA:
Revisit the entire process of finalization of an MR for annual consumption UD / FBA jointly
responsible for raising MR.
The exercise to start Jan 15th, 2014 to be finished by 1st Mar, 2014.
FBA to vet and approve 50% of the MR based on previous year demands and pass on to IM for
further processing within suggested time frame.
Page 5 of 7
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
6 of 7
DS&P
Date of Version
Page
Issuing Department
The remaining 50% MR to be released after the finalization of Annual Budget 2014-15.
No slashing of budgets to be done without consultation and concurrence of the UD.
Once a partial MR gives way to PR, SC will go into ordering process (tendering wherever required).
The procurement decisions taken at this stage will continue to prevail for balance PR whenever it
materializes. No new tendering to be done twice.
INVENTORY MANAGEMENT:
Once in receipt of partial or full MR, the PR for entire budgeted quantity to be raised after taking into
account the open PRs, Pos and Stock in hand. Within 15 days of receipt of MR.
Minimum stock levels to be determined by IM for critical items. List to be provided by DS.
IM to define the minimum stock levels which may serve as the bench mark for reordering of new
supplies against approved budget. One month inventory stock of critical items must be maintained
with due regards to lead times.
Page 6 of 7
Material Management
SOPDist/MM/00/2013
Document No.
Version
Dec 6, 2013
7 of 7
DS&P
Date of Version
Page
Issuing Department
Annexure "A"
MR Creation: Based on 50% of last year budget (Rs 850 million) and include material for:
- CM material for 6 months
nd
Page 7 of 7