SECTION 31 22 00 - Grading
May 2013
Project
Location :
DIVISION
31
SECTION 31 22 00
- EARTHWORK
-
Grading
PART 1 GENERAL
1.1
SCOPE
The work shall include the furnishing of all materials, tools and
equipment and the performance of labor.
1.2
a.
Site Grading
b.
c.
PART 2 PRODUCTS
2.1
DEFINITION
MATERIALS
AND
CLASSIFICATION
OF
EARTHWORK
Grading
31 22 00
Top Soil shall mean the top layer of soil that can support
vegetation.
Page 1 of
c.
2.
3.
4.
5.
the
the
the
d.
e.
f.
g.
Grading
31 22 00
1.
2.
Page 2 of
2.2
100%
85 to 100%
0 to 100%
0 to 3%
2.
b.
Grading
31 22 00
Page 3 of
c.
Expansive Sands
1.
2.
PART 3 EXECUTION
3.1
SITE GRADING
a.
Grading
31 22 00
Grading -
Page 4 of
c.
Grading
31 22 00
Borrow Pits 1.
2.
Forming Cuts 1.
2.
Page 5 of
d.
3.2
Grading
31 22 00
FOR
MISCELLANEOUS
Excavation
1.
2.
Page 6 of
b.
3.3
3.4
Trench Excavation 1.
Grading
31 22 00
Page 7 of
b.
Grading
31 22 00
Backfilling 1.
General Backfilling shall be coordinated with the
testing of utilities. Trenches shall be carefully
backfilled with suitable materials. Backfill shall be
brought up evenly on both sides of pipe for its full
length, and shall be thoroughly and carefully
Page 8 of
3.5
Grading
31 22 00
Page 9 of
Grading
31 22 00
END OF SECTION